Princiyn! RE: West Ten Soccer Center
LAURENCE W. BUVCH,AIA PROPOSAL FOR ADDITIONAL PROFESSIONAL DESIGN
Associate SERVICES -Revised 9/17/07
ANDREW R. CAUICKSHANK, AlA CRZ #0310
Associate
CIfARLENE E. HANLEY, AIA Dear Ms. Jones;
,4ssociate
DAVID M. TAYLOR, AIA Corley Redfoot Zack, Inc., is pleased to present for your review and approval our
Associate •
design fee amendment proposal for the revised scope of work on the West Ten
HARRY M. JEnsEN Soccer Center.
Associate
KENNETH E. SMrrFt The proposed fee is for the Architectural and Engineerlrig design of the additional
Associate work at the site. The original proposal dated May 4, 21)04, covered Phase I
construction only. The attached fee proposal includes a larger building,
additional parking lot, field lighting, well irrigation system, first aid stand,
Iandscaping, etc. The proposal also covers revisions to the original Masterplan to
accommodate the future tennis courts and playground.
PO Box 2368
Chapel HiII, NC 27515-236A
222 Cloister Court
Chape! Hill, NC 27514-2212
,~
YEARS
', FI
(919) 401-8556 Telephone
(919) 493-7306 Fax
www.corleyredfootzack.com
The total fee for this revised scope of work. is 5105,200. If you are in agreement
with this proposal, we request that you issue an amendment to our original
contract dated August 3, 2004. /
,i
Sincerely, ~ '
Michael a Zersley, I'E
Principal
MLFi:esw/0310-amd?
Encl~~ure
cr. Lori Taft, Marabeth Car
•
•
West Ten Soccer Center
PROPOSAL FOR ADDITIONAL PROFESSIONAL DESIGN SERVICES
CR7_ #0310
9/17/0?
PROPOSAL BREAKDO~M~i: CHANGE ORDER #1, ulchides scope for 11~Iaster Plan
Master Planning: S x,000
Schematic Design: 1.:,,030
Design Development: 2:i,0~0
Construction Documents: 29,610
Bidding: 5,010
Construction Administration: _25,5Qp
Total Additional Fee: S] OS,200
•
Fees include masterplanning for tennis courts and the playground, as well as complete design services
for Phase II, which included. a large building, field lighting, additional parking lots, landscaping, etc.