Loading...
HomeMy WebLinkAboutS Park - Rec Corley Redfoot Zack West Ten Design Services1 .,`~ / ~ ~ ~ CORLEY REDFOOT ZACK I'v'C~. .~ i. C H I? F C T S E ti G~ 1 N[ E fi S P L A ti N E R S September 17, 2007 CLENN O. CORLEY, AIA President, CEO Ms. Pamela K. Jones, Director KENNETTi E. REDFOOr, AIA Purchasing & Central Services Lice President Orange County MARK 7..ACK, AIA PO BOX S1S1 VicePresidrnt Hillsborough, IBC 27278 ~1FCHAEL L. HAbiMERSLEY, PE Princiyn! RE: West Ten Soccer Center LAURENCE W. BUVCH,AIA PROPOSAL FOR ADDITIONAL PROFESSIONAL DESIGN Associate SERVICES -Revised 9/17/07 ANDREW R. CAUICKSHANK, AlA CRZ #0310 Associate CIfARLENE E. HANLEY, AIA Dear Ms. Jones; ,4ssociate DAVID M. TAYLOR, AIA Corley Redfoot Zack, Inc., is pleased to present for your review and approval our Associate • design fee amendment proposal for the revised scope of work on the West Ten HARRY M. JEnsEN Soccer Center. Associate KENNETH E. SMrrFt The proposed fee is for the Architectural and Engineerlrig design of the additional Associate work at the site. The original proposal dated May 4, 21)04, covered Phase I construction only. The attached fee proposal includes a larger building, additional parking lot, field lighting, well irrigation system, first aid stand, Iandscaping, etc. The proposal also covers revisions to the original Masterplan to accommodate the future tennis courts and playground. PO Box 2368 Chapel HiII, NC 27515-236A 222 Cloister Court Chape! Hill, NC 27514-2212 ,~ YEARS ', FI (919) 401-8556 Telephone (919) 493-7306 Fax www.corleyredfootzack.com The total fee for this revised scope of work. is 5105,200. If you are in agreement with this proposal, we request that you issue an amendment to our original contract dated August 3, 2004. / ,i Sincerely, ~ ' Michael a Zersley, I'E Principal MLFi:esw/0310-amd? Encl~~ure cr. Lori Taft, Marabeth Car • • West Ten Soccer Center PROPOSAL FOR ADDITIONAL PROFESSIONAL DESIGN SERVICES CR7_ #0310 9/17/0? PROPOSAL BREAKDO~M~i: CHANGE ORDER #1, ulchides scope for 11~Iaster Plan Master Planning: S x,000 Schematic Design: 1.:,,030 Design Development: 2:i,0~0 Construction Documents: 29,610 Bidding: 5,010 Construction Administration: _25,5Qp Total Additional Fee: S] OS,200 • Fees include masterplanning for tennis courts and the playground, as well as complete design services for Phase II, which included. a large building, field lighting, additional parking lots, landscaping, etc. ~1~~ ! ! 1 ~-ORLLY RF.DFOOT Z~~CK,.,