HomeMy WebLinkAboutAgenda - 05-05-2009 - 4mORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: May 5, 2009 Action Agenda Item No. -4- - (n SUBJECT: Schools Adequate Public Facilities Ordinance — Approval and Certification of Annual 2009 Report DEPARTMENT: Manager/Budget/Planning/ PUBLIC HEARING: (Y/N) No A TTA CHMENT(S): (Under Separate Cover) INFORMATION CONTACT: 2009 Annual SAPFOTAC Report Craig Benedict, 245-2592 Donna Coffey, 245-2151 Shannon Berry, 245-2589 Perdita Holtz, 245-2611 PURPOSE: To approve the 2009 Schools Adequate Public Facilities Ordinance Technical Advisory Committee (SAPFOTAC) Report and certify portions of the Report as listed in the chart below. BACKGROUND: At the December 11, 2008 Board of County Commissioners' meeting, the Board approved the November 14, 2008 actual membership and capacity numbers for both Orange County Schools (OCS) and Chapel Hill-Carrboro City Schools (CHCCS). There were mistakes with the initial numbers submitted by OCS and the BOCC approved revised OCS membership and capacity numbers at the February 17, 2009 meeting. Additional approvals/certifications, as outlined in the table below, are required by the SAPFO partners MOUs (Memorandum of Understanding). At the March 17, 2009 BOCC meeting the Board received for transmittal the draft 2009 SAPFOTAC report. The draft report was also posted on the Orange County Planning Department's web site. A letter and the Executive Summary of the report was sent to all SAPFO partners on March 19, 2009 advising them of the availability of the draft report and inviting comment. Comments were requested for submission by April 20, 2009. The Chapel Hill Town Council received the 2009 SAPFOTAC report at its April 15, 2009 meeting and had no comments. In addition, no comments were received from the other SAPFO partners. The exact pages of the 2009 SAPFOTAC report the BOCC will be acknowledging and certifying are listed below. The context (i.e., definitions and standards) of the various SAPFO elements precedes the data to be certified and is within the full report. Element Page in Certification to be made by BOCC SAPFOTAC Report Building capacity 11 through 16 Building capacity and current year with CIP changes membership was approved at the December 11, 2008 meeting and the (Change from previous year) revised OCS membership numbers at the February 17, 2009 meeting. Student membership projection 19 Certification that the average of 5 models methodology will be used, as noted in #3 on page 19 (No Change from previous year) Student membership projections 36 and 37 ® Orange County Elementary, Middle, and High Schools Student Projections (row that notes average only) (p. 36) • Chapel Hill/Carrboro Elementary, Middle, and High Schools Student (Change from previous year) Projections (row that notes average only) (p. 37) Student Growth Rate 38 • Orange County Elementary, Middle, and High Schools 0 Chapel Hill/Carrboro Elementary, (Change from previous year) Middle, and High Schools Student/housing generation rate 43 0 Orange County Elementary, Middle, and High Schools (No Change from previous year) ® Chapel Hill/Carrboro Elementary, Middle, and High Schools , FINANCIAL IMPACT: CHCC Projected need for: New Elementary #11 New Elementary #12 New Middle School #5 Expanded High School S has projected capital facility construction needs as follows: 2010-2011 2018-2019 2013-2014 2016-2017 OCS is not expected to have new school construction needs in the 10 -year planning period, but continued development within the Orange County portion of the City of Mebane may impact future projections and needs. RECOMMENDATION(S): The Manager recommends the Board approve the 2009 SAPFOTAC Annual Report and certify those aspects of the Report in the summary table above. r�l ORANGE COUNTY, NC SCHOOL REPRESENTATIVES, 'TECHNICAL ADVISORY COMMITTEE UNDERSTANDING ADOPTED IN 2002 & 2003) (ORDINANCES ADOPTED IN JULY, 2003) ♦ 45 2009 j (BASED ON NOVEMBER 2008 DATA) CERTIFIED BY THE BOCC ON XXXX, 2009 Page k ExecutiveSummary .............................................................................. ..............................i Introduction............................................................................................ .............................iv Schools Adequate Public Facilities Ordinance Partners ................ .............................vi Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) members ........................................... .............................vi I. Base Memorandum of Understanding A. Level of Service ............................................... ..............................1 B. Building Capacity .......................................... ............................... 2 Attachment. LB. I. - Orange County School Capacity (Elementary, Middle & High School) (2007) ..................5 Attachment: I.B.2. - Chapel Hill /Carrboro School Capacity (Elementary, Middle & High School) (2007).........8 Attachment. I.B.3. - Orange County School Capacity (Elementary, Middle & High School) (2008) ................11 Attachment. I.B.4. - Chapel Hill /Carrboro School Capacity (Elementary, Middle & High School) (2008).........14 C. Membership Date ............................................... .............................17 II. Annual Update to Schools Adequate Public Facilities Ordinance System A. Capital Investment Plan ( CIP) ............................. .............................18 B. Student Membership Projection Methodology .......... .............................19 Attachment. H.B.1. — Student Membership Projection Descriptions ........................... .............................20 Attachment. H..B.2. —Student Membership Projection Models Performance Analysis for 2007 - 08 ...................21 Attachment. H..B.3. —Student Membership Projection Models Performance Analysis for 2008 - 09 ...................25 C. Student Membership Projections ....................... ............................... 29 Attachment. H.C.1. —Orange County Student Projections (Elementary, Middle & High School). (2007) ..........34 Attachment. H..C.2. —Chapel Hill /Carrboro Student Projections (Elementary, Middle & High School) (2007)...35 Attachment. H..C.3. —Orange County Student Projections (Elementary, Middle & High School) (2008) ..........36 Attachment: H..C.4. —Chapel Hill /Carrboro Student Projections (Elementary, Middle & High School) (2008)....37 D. Student Membership Growth Rate .................................. .............................38 Attachment: H..D.1. — Orange County & Chapel Hill /Carrboro Student Growth Rates Chart dates from 2008 — 2018 based on 11115107 membership numbers (2007) ............... .............................39 Attachment. H..D.2. — Orange County & Chapel Hill /Carrboro Student Growth Rates Chart dates from 2009 — 2019 based on 11114108 membership numbers (2008) ............... .............................40 E. Student / Housing Generation Rate ........................ .............................41 Attachment. II.E.1. — Current Student Generation Rates ( 2002) ............................... .............................43 Attachment: II.E.2. Recommended Student Generation Rates ( 2007) ....................... .............................44 M. Flowchart of Schools Adequate Public Facilities Ordinance Process A. Process 1 - Capital Investment Plan ........:................................ .............................45 Attachment: III A.1. —Process 1 Capital Investment Plan ...................................... .............................46 B. Process 2 - Schools Adequate Public Facilities Ordinance; Certificate of Adequate Public Schools (CAPS) System ........ .............................47 Attachment: III B.1. — Process 2 Certificate ofAdeguate Public Schools (CAPS) Allocation ..........................49 2009 SAPFOTAC Executive Summary I. Base Memorandum of Understanding A. Level of Service .................. ............................(No Change) ......... Pg. I B. Building Capacity and Membership ......................... (Change) .......... Pg. 2 Chapel HilllCarrboro School District Orange County School District Elementary 105% 105% Middle 107% 107% Hi h 110% 110% B. Building Capacity and Membership ......................... (Change) .......... Pg. 2 C. Membership Date — November 15...........(No Change) ....... Pg.17 II. Annual Update to SAPFO System A. Capital Investment Plan ( CIP) ............................ (Change)..........Pg.18 B. Student Membership Projection Methodology ...... (Na Change) ....... Pg. 19 The average of 3, 5, and 10 year history /cohort survival, linear and arithmetic projection models. C. Student Membership Projections ............................. (Change)...........Pg.29 Analysis of 5 Years of Projections for 2008 -09 School Year — Chapel Hill Carrboro City Schools Chapel HilUCarrboro School District Orange County School District projection was high comp ared to the actual. Capacity Membership Increase from Prior Year Capacity Membership Increase from Prior Year Elementaty 5244 5302 129 3694 3165 7 Middle 2840 2697 75 2166 1601 36) Hi h 3835 11 630 1 (5) 2558 11 2242 1 41 C. Membership Date — November 15...........(No Change) ....... Pg.17 II. Annual Update to SAPFO System A. Capital Investment Plan ( CIP) ............................ (Change)..........Pg.18 B. Student Membership Projection Methodology ...... (Na Change) ....... Pg. 19 The average of 3, 5, and 10 year history /cohort survival, linear and arithmetic projection models. C. Student Membership Projections ............................. (Change)...........Pg.29 Analysis of 5 Years of Projections for 2008 -09 School Year — Chapel Hill Carrboro City Schools (The number in brackets [n] is the number of students the projection was off compared to actual membership. A number in parenthesis within the brackets [ (n) ] indicates the projection was low compared to the actual whereas a number not in parenthesis indicates the projection was high comp ared to the actual. Year Projection Made for 2008 -09 Membership Actual 2008 2003 2004 2005 2006 2007 Membershi Elementary 5302 5465 163 5129 (173) 5296 (6) J 5273 (29) 5317 15 Middle 2697 3000 303 2757 60 2749 52 2686 (11 2684 (13) High 3630 3790 [160 3671 [41 3687 57 3648 18 3695 65 Executive Summary I Analysis of 5 Years of Projections for 2008 -09 School Year — Orange County Schools (The number in brackets [n] is the number of students the projection was off compared to actual membership. A number in parenthesis within the brackets [ (n) ] indicates the projection was low compared to the actual whereas a number not in parenthesis indicates the projection was high comp ared to the actual. Year Projection Made for 2008 -09 Membership Actual 2008 2003 2004 2005 2006 2007 2006 Membership 2008 2004 2005 2006 2007 Elementary 3165 3185 20 3263 98 3182 17 3170 5 3245 80 Middle 1601 1 1633 [321 1609 [81 1592 9 1604 [31 1617 r161 High 2242 1 2082 (160) 2160 [ (82) 2162 (80 )] 2203 (39) 2223 (19 D. Student Growth Rate ................ ............................ (Change) .......... Pg. 38 E. Student / Housing Generation Rate ....................( Change)...........Pg. 41 SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS (based on future year Student Membership Projections) A `Joint Action Committee' (language used in original MOU) met in November 2005 to discuss Elementary level K -3 class size reductions related to legislation from the North Carolina Department of Public Instruction. The Committee recommended that capacity changes be implemented equally in both school districts when Morris Grove Elementary opened, which occurred this school year. CHAPEL HILL/CARRBORO SCHOOL DISTRICT Elementary School District A. Does not exceed 105% LOS standard (current LOS is 101.1 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Chapel Hill/Carrboro Elementary School #10 (Morris Grove Elementary) opened in August 2008. D. Due partially to reduced class size capacities going into effect in 2008 with the opening of Morris Grove Elementary, the projections are showing a need for Elementary School #11 in 2010 -11 by a projected overcapacity of 26 students. ii Average Annual Growth Rate over 10 Years Chapel Hili/Carrboro School District Orange County School District 2004 2005 2006 2007 2008 2004 2005 2006 2007 2008 Elementary 1.79% 1.95% 2.03% 1.85% 1.5% 1.68% 1.60% 1.49% 1.84% 1.16% Middle 1.91% 2.41% 2.35% 2.58% 2.03% 1.50% 1.18% 1.420A 1.78% 1.44% High 2.04% 1.95% 2.04% 2.31% 2.21% 1 1.21% 0.92% 0.98% 1.49% 1.0% E. Student / Housing Generation Rate ....................( Change)...........Pg. 41 SCHOOL ADEQUATE PUBLIC FACILITIES ORDINANCE STATUS (based on future year Student Membership Projections) A `Joint Action Committee' (language used in original MOU) met in November 2005 to discuss Elementary level K -3 class size reductions related to legislation from the North Carolina Department of Public Instruction. The Committee recommended that capacity changes be implemented equally in both school districts when Morris Grove Elementary opened, which occurred this school year. CHAPEL HILL/CARRBORO SCHOOL DISTRICT Elementary School District A. Does not exceed 105% LOS standard (current LOS is 101.1 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Chapel Hill/Carrboro Elementary School #10 (Morris Grove Elementary) opened in August 2008. D. Due partially to reduced class size capacities going into effect in 2008 with the opening of Morris Grove Elementary, the projections are showing a need for Elementary School #11 in 2010 -11 by a projected overcapacity of 26 students. ii Executive Summary Middle School District A. Does not currently exceed 107% LOS standards (current LOS is 95.0 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Chapel Hill/Carrboro Middle School #5 is projected to be needed in 2013 -14. High School District A. Does not currently exceed the 110% LOS standard (current LOS is 94.7 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Expansion of Carrboro High School from the initial capacity of 800 students to the ultimate capacity of 1,200 students is projected to be needed in 2016 -17. ORANGE COUNTYSCHOOL DISTRICT Elementary School District A. Does not currently exceed 105% LOS standard (current LOS is 85.7 1/o). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Does not affect or prompt CIP activity in 10 -year timeframe. However, staff is monitoring new development activity in the Orange County portion of Mebane, which is not a party to the Schools APFO MOU at this time. Middle School District A. Does not currently exceed 107% LOS standard (current LOS is 73.9 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Does not affect or prompt CIP activity in 10 -year time frame. However, staff is monitoring new development activity in the Orange County portion of Mebane, which is not a party to the Schools APFO MOU at this time. High School District A. Does not currently exceed 110% LOS (current LOS is 87.6 %). B. The projected growth rate at this level is expected to increase at a lesser rate over the next 10 years. C. Does not affect or prompt CIP activity in 10 -year time frame. However, staff is monitoring new development activity in the Orange County portion of Mebane, which is not a party to the Schools APFO MOU at this time. iii Orange County, NC School Adequate Public Facilities Ordinance INTRODUCTION The Schools Adequate Public Facilities Ordinance and its Memorandum of Understanding are ordinances and agreements, respectively. Supporting documents are anticipated to be dynamic to incorporate the annual changing conditions of membership, capacity and student projections that may affect School Capital Investment Plan (CIP) timing. This formal annual report will be forthcoming to all of the Schools Adequate Public Facilities Ordinance partners each year as new information is available. This updated information is used in the schools capital needs process of the Capital Investment Plan (Process 1) and within elements of the Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) spreadsheet system (Process 2). This report and any comments from the Schools Adequate Public Facilities Ordinance partners will be considered in the first half of each year by the Board of County Commissioners at a regular or special meeting. The various elements of the report are then "certified" and formally considered in the process of the upcoming Capital Investment Plan. The Certificate of Adequate Public Schools system is updated after November 15 when data is received from the school districts with actual membership and pre - certified capacity (i.e. CIP capacity or prior "joint action" capacity changes). The Schools Adequate Public Facilities Ordinance and Memorandum of Understanding have dynamic aspects. The derivation of the baseline and update to the variables will continue in the future as a variety of school related issues are fine -tuned by technical and policy groups. The primary facet of this report includes the creation of mathematical projections for student memberships by school levels (Elementary, Middle and High) and by School Districts (Chapel Hill/Carrboro and Orange County). This information is found in Section II, Subsections B, C, D, and E. In summary, this report serves as an update to the dynamic conditions of student membership and school capacity which effect future projected needs considered in Capital Investment Planning. Interested parties may make their comments known to the Board of County Commissioners prior to their review of the report and school CIP completion or ask questions of the SAPFOTAC members. 1v Schools Adequate Public Facilities Ordinance Memorandum of Understanding (Schools APFO MOU) SECTION Id 0 � 1 111: - R, - -1- q1 'k III I , 1 11110, -0-0010-11 wmill 0 .. ii", I 'IT-9-M A 1111,11111 1 v a • i mism Chapel Hill/Carrboro School District School APFO Orange County School District School APFO Board of County Commissioners Board of County Commissioners Carrboro Board of Aldermen Hillsborough Town Council Chapel Hill Town Council Chapel Hill/Carrboro School Board Orange County School Board v Planning Directors /School Representatives Technical Advisory Committee (aka SAPFOTAC) Orange County Planning Department Craig Benedict, Planning Director, Perdita Holtz, Planning Systems Coordinator and Shannon Berry, Special Projects Planner 306 -F Revere Road P.O. Box 8181 Hillsborough, NC 27278 Town of Chapel Hill J.B. Culpepper, Planning Director 405 Martin Luther King, Jr. Blvd. Chapel Hill, North Carolina 27514 Town of Hillsborough Margaret Hauth, Planning Director P.O. Box 429 Hillsborough, NC 27278 Orange County School District Patrick Rhodes, Superintendent and George McFarley, Chief Operating Officer 200 E. King Street Hillsborough, NC 27278 Carrboro Planning Department Roy Williford, Planning Director 301 West Main Street Carrboro, NC 27510 Chapel Hill - Carrboro School District Todd LoFrese, Assistant Superintendent for Support Services and Kevin Morgenstein Fuerst, Coordinator of Student Enrollment 750 Merritt Mill Road Chapel Hill, NC 25716 Includes: SAPFOTAC /O.C. Budget Liaison Donna Coffey 208 South Cameron Street P.O. Box 8181 Hillsborough, NC 27278 A A. Level of Service 1. Responsible Entity for Suggesting Change — Change can only be effectuated by amendment to Memorandum of Understanding (MOLT) by all School APFO partners. 2. Definition — Level of Service (LOS) means the amount (level) of students that can be accommodated (serviced) at a certain school system grade group [i.e., Elementary level (K -5), Middle Level (6 -8), High School Level (9 -12)]. 3. Standard for: Standard for: Chapel Hill Carrboro School District Orange County School District Elementary Middle High School Elementary Middle High School 105% 107% 110% 105% 107% 110% 4. Analysis of Existing Conditions Chapel Hill Carrboro School District These standards are acceptable at this time. 5. Recommendation — No Change from above standard Analysis of Existing Conditions Orange County School District These standards are acceptable at this time. Recommendation — No Change from above standard 1 Section I B. Building Capacity 1. Responsible Entity for Suggesting Change - The Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) will receive requested changes that are CIP related and adopted in the prior year: CIP capacity changes will be updated along with actual membership received in November of each year. Other changes will be sent to a `Joint Action Committee' of the BOCC and Board of Education, as noted in the MOU, who will make recommendations and forward changes (on the specific forms with justification) to the full Board of County Commissioners for review and action. These non -CIP changes would be updated in the upcoming November CAPS system recalibration and included in the SAPFOTAC report. 2. Definition- 'Tor purposes of this Memorandum, "building capacity" will be determined by reference to State guidelines and the School District guidelines (consistent with CIP School Construction Guidelines /policies developed by the School District and the Board of County Commissioners) and will be determined by a joint action of the School Board and the Orange County Board of Commissioners. As used herein the term "building capacity" refers to permanent buildings. Mobile classrooms and other temporary student accommodating classroom spaces are not permanent buildings and may not be counted in determining the school districts building capacity." 3. Standard for: Standard for: Chapel Hill Carrhoro School District Orange County School District The original certified capacity for each of the schools was certified by the respective superintendent and incorporated in the The original certified capacity for each of the schools was certified by the respective superintendent and incorporated in the initialization of the CAPS system (Chapel Hill initialization of the CAPS system (Orange Carrboro School District April 29, 2002 - County School District April 30, 2002 - Base) Base) Capacity changes were made each year as follows: Capacity changes were made each year as follows: 2 Section I 2003: Increase of 619 at Rashkis Elementary 2004: No changes at Elementary, Middle, or High School levels. 2005: No changes at Elementary, Middle, or High School levels. 2006: No changes at Elementary, Middle, or High School levels. 2007: An increase of 800 at the High School level with the opening of Carrboro High School. 2008: An increase of 323 at the Elementary School level due to the opening of Morris Grove Elementary School and the implementation of the 1:21 class size ratio in grades K -3 2003: No net increase in capacity at Elementary level. No changes at Middle School level. Increase of 1,000 at Cedar Ridge High School. 2004: No net increase in capacity at Elementary level. No changes at Middle or High School levels. 2005: An increase in capacity of 100 at Hillsborough Elementary with the completion of renovations. 2006: An increase in capacity of 700 at the Middle School level with the completion of Gravelly Hill Middle School and an increase of 15 at the High School level with the temporary location of Partnership Academy Alternative School. An increase of 2 at the Elementary level due to a change in the capacity calculation for each grade at each school. 2007: No changes at Elementary, Middle, or High School levels. 2008: A decrease of 228 at the Elementary School level due to the implementation of the 1:21 class size ratio in grades K -3 and an increase of 25 at the High School level with the completion of the new Partnership Academy Alternative School. 4. Analysis of Existing Conditions Analysis of Existing Conditions Chapel Hill Carrboro School District Orange County School District The Schools Facilities Task Force developed The Schools Facilities Task Force developed a a system to calculate capacity. Any changes system to calculate capacity. Any changes 3 Section I year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The requested 2008 -9 capacity is noted on Attachment I.B.4 year to year will be monitored, reviewed, and recorded by the SAPFOTAC on approved forms distributed to SAPFO partners and certified upon approval by the Board of County Commissioners each year. The requested 2008 -9 capacity is noted on Attachment I.B.3 A `Joint Action Committee' met in November 2005 to discuss Elementary level K-3 class size reductions related to legislation from the North Carolina Department of Public Instruction. The Committee recommended that capacity changes be implemented equally in both school districts with the opening of CHCCS Elementary School #10 (Morris Grove) in 2008 -09. 5. Recommendation — Accept new Elementary Level capacities as reported by CHCCS and shown in Attachment I.B.4. Recommendation — Accept new Elementary Level capacities as reported by OCS and shown in Attachment I.B.3. El Section I Attachment I.B. 1 (page I of 3) School District, Orliagge County Schools 96L—PFc CAPS Year. November 157007 - 7ov—e.rnl,,cr 14, 2008 Capacity and Membership Submittal Date., Noverntler 15, 2007 Special Note, F(r the November 15,'.00'- bWqa F-r UIL IjOr aoocpEc(x inc Force rcvlcw anti 2W-, 11kinni!n and School QIrnmilkv. It(T tt. , I'hL -se c,.j-djjjas will ;er-,*4,,iln OTL Li LI until ell, i ged by S1) qtc &Iioel CIT, or (2) an arnndej vvision of this firm thy.1 is =riffled Ity the. BOCC. Justification: An increase in Hillsborough Elementary capacity of 100 was completed prior to the start of the 2003-04 school year in accordance with the CIR However, due to continuing renovations within the school, the full capacity of 614 student seats was not achieved until the 200512006 school year. The above numbers reflect school capacity vvithout onsideration of state class size reductions in grades K-3. The revision for 2006-07 was due to a change in the method of capacity calculation to be more precise by using the actual number of classrooms at each grade level. Capacity Certifli ation; ? SupPintendent Date ... . ...... Membership Certification, Superintendent Date B C G_ WNrDaIe C C C nit 52 -599 (H), IN MW 585 �232 491 527 410 576 $18 50 1 41.8: 622 56, 8 616 Special Note, F(r the November 15,'.00'- bWqa F-r UIL IjOr aoocpEc(x inc Force rcvlcw anti 2W-, 11kinni!n and School QIrnmilkv. It(T tt. , I'hL -se c,.j-djjjas will ;er-,*4,,iln OTL Li LI until ell, i ged by S1) qtc &Iioel CIT, or (2) an arnndej vvision of this firm thy.1 is =riffled Ity the. BOCC. Justification: An increase in Hillsborough Elementary capacity of 100 was completed prior to the start of the 2003-04 school year in accordance with the CIR However, due to continuing renovations within the school, the full capacity of 614 student seats was not achieved until the 200512006 school year. The above numbers reflect school capacity vvithout onsideration of state class size reductions in grades K-3. The revision for 2006-07 was due to a change in the method of capacity calculation to be more precise by using the actual number of classrooms at each grade level. Capacity Certifli ation; ? SupPintendent Date ... . ...... Membership Certification, Superintendent Date B C G_ WNrDaIe C C C nit Section I School District: Orange County Schools SAPFO CAPS Year. November 15, 2007 - November 14, 2008 "apacity and Membership Submittal Date: November 15, 2007 Attachment I.B. I (page 2 of 3) Special Note: For the Ntivmb• 1.5. J1102 baso year the board aceepW the sulwintendam-carzified capacities as P.VE Of (Ile SCIM) rr.-CilitieS 7a5k Force ru%*knv and 2003 Planncn; rind School Advisory Conmittee Rujs',rt. 1'he a cap2eiues will rem5ineffective uwil.ehiftgod Ly (1) ibe School CIP or C31 an amended version of this form hat is ceriffitX1 by lhtt. I1()(*(.". Justification; An increase in capacity was generated as a result of the completion of Gravelly Hill Middle School in Fall 2006. This school added an additional 700 middle school student seats. Capacity Certification-, '/r -2') -tom Superintendent Date Membership Certification: Id, Superintendent Date �Q Chat Date 13 8 eC h ir !!)� Date -"ap tut }.,,.A LIS 0 1 OWIT. Special Note: For the Ntivmb• 1.5. J1102 baso year the board aceepW the sulwintendam-carzified capacities as P.VE Of (Ile SCIM) rr.-CilitieS 7a5k Force ru%*knv and 2003 Planncn; rind School Advisory Conmittee Rujs',rt. 1'he a cap2eiues will rem5ineffective uwil.ehiftgod Ly (1) ibe School CIP or C31 an amended version of this form hat is ceriffitX1 by lhtt. I1()(*(.". Justification; An increase in capacity was generated as a result of the completion of Gravelly Hill Middle School in Fall 2006. This school added an additional 700 middle school student seats. Capacity Certification-, '/r -2') -tom Superintendent Date Membership Certification: Id, Superintendent Date �Q Chat Date 13 8 eC h ir !!)� Date Section I School District: Orange County Schools SAPFO CAPS Year. November 15, 2007 - Nomiftr 14, 2008 Capacity and Membership Submittal Date, November , 15, 2007 Attachment I.B. I (page 3 of 3) Special Note: Rr the Novomber U10I.WROULMMIX'S I OIK f,owe wview and 200 Pkmw= and Schaal Representative Technical Advisory Committee The3e capachics will --culain effective Oath changed by()) tWSChoal CIPor (2) an Eunended version of this (•T7n that is c=tificd by &.a BOCC Justification, Partnership Academy Alternative School (P.A.A.S.) is temporarily located at Fairview BaDtist Church which allows limited capacity for alternative school students. Upon completion of the permanent site for P.A.A.S. we anticipate approximately 40 student seats added to the high school capacity. Capacity Certification: Superintendent Date Memb"ship, C ification: e tt Superintendent Date Section I School District: Chapel Hill-Carrboro City Schools School Year; November 15, 2007 - November 14, 2009 Attachment I.B.2 (page I of 3) Spacial Note: For the November 1.5. 20DI basc year the btyxxt accepted ed cap'.6des is part of the Schuoll- 'acilitiaTask Force Tcvimv'znd 2003 Plma-= and Schoul Rc;)rVIenta:ivcTcchnical Advisory Coutiniucc Rorirt. These capituitit:9 will remain cf.-Octivo until uhmiled by ,11 The School CIP or (2) are mv.-oldo-I version Of this ftmn LIU11 is CMifiod by tire BOCC. Justification; 1. FPG square footage increased due to primary wing renovations The above numbers reflect school capacity without consideration of state class size reductions in grades K-3. Capacity Certification; Superintendent Date Membership Certification, I ..Y Za ' Superintendent Date Section I School DisiFict. Chapel HillmUtrrboro Cit,,L, Schools School Year". November 15, 2007 - November 14, 2008 Attachment I.B.2 (page 2 of 3) spacial Note: For ax November 15, 2002 base year the hozrd z;;;;.p,ed the 5ttrc:TntLmdent-cerltLte,.l C-Apac,11c; P-1 rare of UW xajouj ray.-juics , cs-m Force rcviawar.d2D33PiUti)ct,& and SchnoI R.-p.t:svLllPli%,cTc4bniczL Ad,,,isL:z-vC1omjW-iT1RC.)r.aL by (1) die. Schcol CIP or (2) zaawnended vm. jon or this forTn L�jpt is cetrified by the BOCC. Justification: 1. Square footage at Culbreth Increased due to auditorium expansion Capacity Certification". Superintendent Date Membership Certification* 1Superintendent Date Section 1. School District. Chipel Hill-Canboro City Schuols School Ve—ai. November 172007 - November 14, 2003 1,51 Attachment I.B.2 (page 3 of 3) SPOCIal Note: FnT the November ti-, 20]12 ha:e you the board iccc:)It!Lit%t:SuPerititcr.dcnt-c=tir2cd capacities as part af LhtSehcol Facilities Task Fn.ce review and 2003 Phnnm and School Rcpresmative Technical Advisory Committee Repi-t. I'llese capacities will ramairt effective und] changed by fl) the School CT or (2) an amended vmiolt of this form that is =dficd by ehe SOCC. Justification; Carrboro High School opened August 25, 2007 with a design capacity of 800 Capacity ,Certi I 't , n: Superintendent Date .......... Membership CetVfi ation; Superintendent Date Section I School District: Orange County Schools SAPFO CAPS Year: November 14, 2008 - November 13, 2009 Capacity and Membership Submittal Date: November 14, 2008 2 Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report, These capacities will remain effective until changed by (1) the School C1P or (2) an amended version of this form that is certified by the BOCC. 2. November 15th falls on a weekend in 2008 and 2009. Therefore, membership numbers provided shall be from the Friday before. Justification: 1.Elementary school capacities reflect 1:21 class size ratio in grades K -3 Capacity Certification: "�� a Ol� i OR L) Superintendent Date Membership Certification: Q� t a Ot'yo�oa Superintendent Date Attachment I.B.3 (page 1 o 3) J i -r • ��3 11 Section I School District: Orange County Schools SAPF4 CAPS Year: November 14, 2008 -November 13, 2009 Capacity and Membership Submittal Date: November 14,200S 2 Attachment I.B.3 (page 2 of 3) Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (1) the School CIP or (2) an amended version of this form that Is certified by the HOCC. 2. November 15th falls on a weekend in 2008 and 2009. Therefore, membership numbers provided shall be from the Friday befbm Justification: Capacity C� Certification: �. � t l/,'�m+��,, otj26jo4 Superintendent Date Membership Certification: -6 Qry� Ad., Ol Atl-i Superintendent Date "90CC Chair Date 31 12 Section I School District: Orange County Schools SAPFO CAPS Year: November 14, 2008 -November 13, 2009 Capacity and Membership Submittal Date: November 14, 2008 s Attachment I.B.3 (page 3 of 3) Special Hotels): 1. For the November 15, 2002 base year the board accepted the superintendent - certified capacities as part or the school reentries Task Force review and 2003 Planners and School Representative Technical Advisory Committee Report. These capacities will remain effective until changed by (1) the School CIF or (2) an amended version of this form that is certified by the BOCC. 2. November 15th falls on a weekend in 2008 and 2009. Therefore, membership numbers provided shall be firm the Friday before. Justification: 1. The capacity increase reflects the relocation and new construction for Partnership. Capacity Certification: oll2nloq Su Inter ent Date Membership Certification: 01 /A/OR Superintendent Date 31 v� 13 Section I School is r e : C: ape t -Can' oro C ity ; c pots SAPFO CAPS Year. November 14, 2008 - Novem rer 13. _009 Capacity and Membership Submittal bate: November 14.2005' Attachment I.B.4 (page 1of3) Special Note(s): 1. For Elie Nuvember I S. N!42 base year the beard umplcd the superintcndcnt•ccniiicd capmdtics as pan ofibe 5chnool Fnciliries T%A Force review end 200 Plarmers and School Representative Technical Advisor, Gamminec Rcpoa T1':e3c crpacilics will rennin cl'cctive until changed ht t,3) the Schaal CIV or (2) art amended version uRhis fion t< ". at is cenifed hi the BO 'C. 2. Mwemhcr 15th falls ,m a %veAcnd in 21103 and 2009 Therefore, rcmfr_rshtr numbers provided shall be frum the Frida} bdfure. Justification: 1.Elementary school capacities reflect 1:21 class size ratio in grades K -3 Capaciitty� jCertification. r y Superintendent Date Membership Certification: 7_01- Superintendent Date BdCC Chair Date BGCC Chair Date 14 Section I :5chool VIsfrich-4 ape tit -C:arr oro City Schools gAp7j5 CAPS ear: Novem er 1-4.2008 - NovCt:t Ter 13, IMP (Capacity and Membership Submittal Date: November 14.2008 i Speeiai Note(s): I. Fur the Nnvenbrr 15.2002 base t•+ a.* the hacrd accreted the supertr ennera- cerinoa capacnws us pu Task Pnrcc rewesv and 2!' %Ji l'icn:xr6 r:nc Sehn:d Rrp:rsrnta :i+c T'rchrical hde!sory Cammat �• Hrpor, Tha;a a�prriucs. uaI remain rl:rcti:r until ehan3ed'.ry i 1 } tr:c Scher+1 C1P o: i'_i an aatcrdcd sr ;;icn nrthii Earn: list is ccmiicd bt Elie [tCx_C ?. No+•en:bcrl4dt:bls on a+crrket,din'_IX15 and ?UUr9.'rherorurr.n:cnthers *ip numn:n p: aeidrd sh:dl b, liam The Frday before.. Justification: Capacity Certification: Superintendent Date Membership Certification: Superintendent Date r' BOCC Chair Da•.e J OCC Chair Date Attachment I.B.4 (page 2 of 3) 15 Section I School is rie : C ape Hitl.carrbora City Schools Year- : ovemn cr I .3008 - tvovem ier 1 ?, 21HP Capacity and Membership Submittal Date: November 14, 2_008' 241,111 1;15 1;515 1 5i� R 0 h01! a Speclal Note(s): I For the NIVCMb-'T tz.2O0? bur}rur the b ord rccopied the SU pcnnlcndcm- errphrd CupacIUes us part. urthe ScliuC,I FBcihtjc9 Mask Force rceimand'_U4? Ylunne:s end School Roprewntntiee Technical Advisnry Committee t cpu:t Ttn:sr eapackics will remain cllbatitc until changed hy Mille } the scnnnl CH, u: {^ I un untended s•ersmn of this lbrm that is certified by dtr DOCC. '. Narumbe: t5ih lulls un a u�^e >:cnd in 2i1gH and 1CN4 Thr;r6cre, nrembarship nembecs prar,ded snail be iium the Friday beiuze. Justification: Capacity Certification: 2fC`�� / C7eP Superintendent Date Membership Certification: Superintendent Date Attachment I.B.4 (page 3 of 3) -7 f /� JI G�r�.•�.. � yam, +-�. �z- z3�o� BOCC Chair Date - _ t BOCC Chair "—" Date 16 Section I 1. 2. 3. C. Membership Date Responsible Entity for Suggesting Change — Change can be effectuated only by amendment to Memorandum of Understanding (MOU) by all School APFO partners. The Planning Directors, .School Representatives, Technical Advisory Committee (SAPFOTAC) may advise if a change in date would improve the reporting or timeliness of the report. Definition - The date at which student membership is calculated. This date is updated each year and also serves as the basis for projections along with the history from previous years. "For purposes of this Memorandum, the term "school membership" means the actual number of students attending school as of November 15 of each year. The figure is determined by considering the number of students enrolled (i.e. registered, regardless of whether a student is no longer attending school) and making adjustments for withdrawals, dropouts, deaths, retentions and promotions. Students who are merely absent from class on the date membership is determined as a result of sickness or some other temporary reason are included in school membership figures. Each year the School District shall transmit its school membership to the parties to this agreement no later than five (5) school days after November 15. Standard for: Chapel Hill Carrboro School District November 15 of each year Analysis of Existing Conditions Standard for: Orange County School District November 15 of each year This will be analyzed in the future years to determine if it is an exemplary date. This date may sometimes occur on a weekend (as it did this year) and is not a typical date for membership census and recordation. An earlier date such as the "40`x= day" membership may be suggested in future years so data can be analyzed earlier to assist in school CIP needs assessment. S. Recommendation - No change at this Recommendation - No change at this time time 17 Section H II. 1. 3 9 5. 0 r� r I+ACILITIES ORDINANCE SYSTEM Capital Investment Plan (CIP) Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Board of County Commissioners (BOCC) after review of the CIP requests from the School Districts. Action regarding CIP programs usually occurs during the BOCC budget Public Hearing process in the winter and spring of each year. The development of the CIP considers the conditions noted in the SAPFOTAC report released in the same CIP development year including LOS (level of service), capacity, and membership projections. Definition — The process and resultant program to determine school needs and provide funding for new school facilities through a variety of funding mechanisms. Standard for: Chapel Hill Carrboro School District Not Applicable Analysis of Existing Conditions Standard for: Orange County School District Not Applicable The MOU outlines a system of implementing the SAPFO, including issuing Certificates of Adequate Public Schools (CAPS) to new development if capacity is available. The Requests for CAPS will be evaluated using the most recently adopted Capital Investment Plan. A new Capital Investment Plan is currently under development for approval prior to June 30, 2009. Recommendation — Not subject to staff review WIV Section II 1. 3. 0 B. Student Projection Methodology Responsible Entity for Suggesting Change — This section is reviewed and recommended by the Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) to the BOCC for change, if necessary. Definition — The method(s) by which student memberships are calculated for future years to determine total membership at each combined school level (Elementary, Middle and High School) which take into consideration historical membership totals at a specific time (November 15) in the school year. These methods are also known as `models'. Standard for: Chapel Hill Carrboro School District Standard for: Orange County School District Presently, the average of five models are being used: namely 3, 5, and 10 year history /cohort survival methods, Orange County Planning Department Linear Wave and Tischler Linear methods. Attachment II.B.1 includes a description of each model. Analysis of Existing Conditions Performance of the models is monitored each year. The value of a projection model is in its prediction of school level capacities at least three years in advance of capacity shortfalls so the annual Capital Investment Plan (CIP) updates can respond proactively with siting, design, and construction. Attachment II.B.1 includes a description of each model. Attachment H.B.3 shows the performance of the models for the 2008 -9 school year from the prior year projection. 5. Recommendation — Seven (7) years of projection results are now available. Analysis on the accuracy of the results is showing that some models have better results in one district while others have better results in the other district. The historic growth rate is recorded by the models but projected future growth is more difficult to accurately quantify. In all areas of the county, proposed growth is not included in the SAPFO projection system until actual students begin enrollment. The system is updated in November of each year, becoming part of the historical projection base. This is especially pertinent in. the Orange County School District which serves students living within the Orange County portion of the City of Mebane which had had little historic enrollment impact. The significant proposed residential growth occurring within Mebane's jurisdiction has yet to be fully entered into the historically based projection methods. 19 Section II w z 0 O CL CL X 22 IM Z a uj M I Attachment II.B. I KC w 'E 0 75 A -6 46 Ja tes Lu Lu a. ff -aE 5 a tm;a 21 9 - g yea. l.: .1 E A *?H! in ia 2 —g ru o 8 J. it I pr ea IF c >* IT & I 7r z u :E E � Q ,f&.F Ll -9 w L, Lm oE sc, O Ea 8 .0 al ii C� Lm t N Rt L" ti G LL it :E w - w m 9 IVA 41 o M'! 19 Q IS -q E- .5,; H R - - B1 o O- c b :Fj :a = ws 4=9 ts 19 E E At aY ]5- m Cl. LU 0 13 LU :2 0 0 x A5 a, el CL CL 12 0 0 m cD KC Section II Attachment H.B. 2 (page 1 of 4) Orange County School District School Membership 2007 -2008 School Year (November 15, 2007) H means High L means Low * includes hospital school 21 11/15/06 Actual Projected 11/15/07 Change between actual 2006 -07 2007 -08 Actual 2007 -08 Nov 2006- Nov 2007 Elementary 3072 3158 +86 Model Proiection is T j 3130 L28 OCP 3119 L39 10C 3120 L38 5C 3144 L14 3C 3137 L21 AVG 3130 L28 11/1512007 Middle 1576 1637 +61 Model Projection is T 1606 L31 OCP 1612 L25 10C 1585 L52 5C 1605 L32 3C 1597 L40 AVG 1601 L36 11/15/2007 High 2184 2201 +17 Model Projection is T 2226 H25 OCP 2247 H46 10C 2138 L63 5C 2167 L34 3C 2146 L55 AVG 2185 L16 11/15/2007 Totals Elementary 3072 3158 Middle 1576 1637 High 2184 2201 6832 6996 +164 ModelProjection is T 6962 L34 OCP 6978 L18 10C 6843 L153 5C 6916 L80 3C 6880 L116 AVG 6916 L80 H means High L means Low * includes hospital school 21 Attachment II.B. 2 Section II (page 2 of 4) Orange County School District School Membership 2007-2008 School Year (November 15, 2007) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCH LER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5-YEAR COHORT (5C) 3-YEAR COHORT (K) Elementary School Level • Projections were all low (from 14 to 39) when compared to the actual November 15, 2007 membership. The average projection was 28 students lower than actual membership. • The membership actually increased by 86 members between November 15, 2006 and November 15, 2007. Middle School Level • Projections were all low (from 25 to 52). The average projection was 36 students lower than the actual membership. • The membership actually increased by 61 members between November 15, 2006 and November 15, 2007. High School Level • Projections were mixed (high and low) ranging from being low by 63 students to being high by 46 students. The average projection was 16 students lower than the actual membership. • The membership actually increased by 17 members between November 15, 2006 and November 15, 2007. TOTAL • The total of all school level projections were low (from 18 to 153). The average projection was 80 students low. • The membership increased in total by 164 students, which is the sum of +86 at Elementary, +61 at Middle and +17 at High. 22 Section II Attachment II.B. 2 (page 3 of 4) Chapel Hill /Carrboro School District School Membership 2007 -2008 School Year (November 15, 2007) H means High L means Low * excludes hospital scho, 23 11115/06 11/15/07 Actual Projected Actual Change between actual 2006 -07 2007 -08 2007 -08 Nov 2006- Nov 2007 Elementary 4980 5173 +193 Model Projection is T 5103 L70 OCP 5079 L94 10C 5233 H60 5C 5157 L16 3C 5138 L35 AVG 5142 L31 11/15/2007 Middle 2592 2622 +30 Model Projection is T 2656 H34 OCP 2670 H48 10C 2605 L17 5C 2588 L34 3C 2593 L29 AVG 2622 exact 11/1512007 High 3520 3635 +115 Model Projection is T 3606 L29 OCP 3613 L22 10C 3589 L46 5C 3616 L19 3C 3570 L65 AVG 3599 L36 11/15/2007, Totals Elementar 4980 5173 Middle 2592 2622 High 3520 3635 11092 11430 +338 Model Projection is T 11365 L65 OCP 11362 L68 10C 11427 L3 5C 11361 L69 3C 11301 L129 AVG 11363 L67 H means High L means Low * excludes hospital scho, 23 Attachment II.B. 2 Section II (page 4 of 4) Chapel Hill/Carrboro School District School Membership 2007-2008 School Year (November 15, 2007) Statistical Findings PROJECTION TYPE A BBREVIA TIONS 'TISCHLER' LINEAR (T) 10 -YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level • Projections were mostly low (by 16 to 94 students) with one high projection (by 60 students) when compared to the actual November 15, 2007 enrollment. The average projection was 31 students lower than the actual membership. ® The membership actually increased by 193 members between November 15, 2006 and November 15, 2007. Middle School Level Projections were mixed (high and low) ranging from a low of 34 to a high of 48. The average projection was exactly what the actual membership is. The membership actually increased by 30 members between November 15, 2006 and November 15, 2007. High School Level Projections were all low (by 19 to 65 students). The average projection was 36 students low. The total membership actually increased by 115 members between November 15, 2006 and November 15, 2007. TOTAL The total of all school level projections were all low by between 3 and 129 students. The average projection was low by 67 students. The membership increased in total by 338 students, which is the sum of +193 at Elementary, +30 at Middle, and +115 at High. N9 Section 11 Attachment H.B.3 (page 1 of 4) Orange County School District School Membership 2008-2009 School Year (November 14, 2008) H means High L means Low PAI 11/15/07 2008 Report Actual Projection for 11/14108 Change between actual 2007-08 2008-09 Actual 2008-09 Nov 2007- Nov 2008 Elementary 3158 3165 • +7 Model Projection is T 3219 H54 OCP 3244 H79 10C 3247 H82 5C 3259 H94 3C 3257 H92 AVG 3245 H80 11/14/2008 Middle 1637 1601 (36) Model Projection is T 1669 H68 OCP 1644 H43 10C 1580 L21 5C 1598 L3 3C 1596 L5 AVG 1617 H16 11/14/2008 High 7 22 7o7l 2242 +41 Model Projection is T 2244 H2 OCP 2258 H16 10C 2193 L49 5C 2205 L37 3C 2217 L25 AVG 2223 L19 11/14/2008 Totals Elementary 3158 3165 Middle 1637 1601 High 2201 2242 6996 7008 +12 Model Projection is T 7132 H124 OCP 7146 H138 10C 7020 H12 5C 7062 H54 3C 7070 H62 AVG I 7086 H78 H means High L means Low PAI Attachment 113.3 Section II (page 2 of 4) Orange County School District School Membership 2008-2009 School Year (November 14, 2008) Statistical Findings PROJECTION TYPE ABBREVIATIONS `TISCHLER' LINEAR (T) 10 YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5-YEAR COHORT (5C) 3-YEAR COHORT (3C) Elementary School Level • Projections were all high (from 54 to 94) when compared to the actual November 14, 2008 membership. The average projection was 80 students higher than actual membership. • The membership actually increased by 7 members between November 15, 2007 and November 14, 2008. Middle School Level • Projections were mixed (low and high) ranging from being low by 21 students to being 68 students high. The average projection was 16 students higher than the actual membership. • The membership actually decreased by 36 members between November 15, 2007 and November 14, 2008. High School Level • Projections were mixed (low and high) ranging from being low by 49 students to being high by 16 students. The average projection was 19 students lower than the actual membership. • The membership actually increased by 41 members between November 15, 2007 and November 14, 2008. FOY "I • The total of all school level projections were high (from 12 to 138). The average projection was 78 students high. • The membership increased in total by 12 students, which is the sum of +7 at Elementary, (36) at Middle and +41 at High. PT 81 Attachment IELB.3 Section H (page 3 of 4) Chapel Hill/Carrboro School District School Membership 2008-2009 School Year (November 14, 2008) H means High L means Low 27 11/15/07 2008 Report 11114/08 Actual Projection for Actual Change between actual 2007-08 2008-09 2008-09 Nov 2007- Nov 2008 Elementary 5173 5302 +129 Model PMkOqRj§j T 5305 H3 OCP 5317 H15 10C 5367 H65 5C 5295 U 3C 5299 L3 AVG 5317 H15 11/14/2008 Middle 2622 2697 +75 Model Proi Ae clion is T 2689 L8 OCP 2676 L21 10C 2692 L5 5C 2676 L21 3C 2687 L10 AVG 2684 L13 11/14/2008 High 3635 3630 (5) Model PmLqction is T 3728 H98 OCP 3692 H62 10C 3684 H54 5C 3684 H54 3C 3688 H58 AVG 3695 H65 11/14/2008 Totals Elementary 5173 5302 Middle 2622 2697 High 3635 3630 11430 11629 +199 Model Proection is T 11722 H93 OCP 11685 H56 10C 11743 H114 5C 11655 H26 3C 11674 H45 AVG I 11696 H67 H means High L means Low 27 Attachment 1I.B.3 Section II (page 4 of 4) Chapel Hill/Carrboro School District School Membership 2008-2009 School Year (November 14, 2008) Statistical Findings PROJECTION TYPE A BBREVIA TIONS 'TISCHLER' LINEAR (T) 10 YEAR COHORT (10C) ORANGE COUNTY PLANNING (OCP) 5-YEAR COHORT (5C) -3-YEAR COHORT (3C) Elementary School Level • Projections were mixed (low and high) ranging from a low of 7 students to a high of 65 students when compared to the actual November 14, 2008 membership numbers. The average projection was 15 students higher than the actual membership. • The membership actually increased by 129 members between November 15, 2007 and November 14, 2008. Middle School Level • Projections were all low, by 5 to 21 students. The average projection was 13 students lower than the actual membership. • The membership actually increased by 75 members between November 15, 2007 and November 14, 2008. High School Level • Projections were all high, by 54 to 98 students. The average projection was 65 students high. • The total membership actually decreased by 5 members between November 15, 2007 and November 14, 2008. TOTAL • The total of all school level projections were high, by between 26 and 114 students. The average projection was high by 67 students. • The membership increased in total by 199 students, which is the sum of +129 at Elementary, +75 at Middle, and (5) at High. 04-11 Section II 1. 0) 3. C. Student Projections Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) and referred to the BOCC for annual report certifications. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. Definition — The result of the average of the five student projection models represented by 10 year numerical membership projections by school level (Elementary, Middle, and High) for each school district (Chapel Hill/Carrboro School District and Orange County School District). Standard for: Chapel Hill Carrboro School District Standard for: Orange County School District The 5 model average discussed in Section 113 The 5 model average discussed in Section II.B (Student Projection Methodology) See Attachment II.C.4 4. Analysis of Existing Conditions (Student Projection Methodology) See Attachment II.C.3 The membership figures and percentage growth on the attachments show continued growth in both systems. Variability by school level and between the School Districts is also noted. Year -by -year percent growth is shown on the attached table as well as the projected LOS. The projections models were updated using current (November 15) memberships. Ten years of student membership were projected thereafter. 29 Section II Chapel Hill Carrboro School District Elementary The previous year (2007) projection for November 2008 at this level was overestimated by 15 students. The actual growth was +129. Over the previous seven (7) years, this level has shown varying increases in growth. From 2001 until 2003, growth steadily increased; however, in 2004, the increase suddenly fell to an increase of only 3 additional students. In years since 2004, student membership has increased by over 100 students per year. Projections done this year include the student membership from Morris Grove Elementary which opened in August 2008. The projections show the need for Elementary School #11 in 2010 -11. A site has been identified for Elementary School #11 and efforts are underway to identify construction funding. In 2007, State Statutes were amended so that effective the 2009 -2010 school year, children entering kindergarten must be five years old by August 31st of the year starting school, versus the current statewide policy date of October 16th. For the 2009 -2010 school year, this will result in a 45 week enrollment period as opposed to the typical 52 week birthday enrollment period, thereby creating a potential for a reduction in the number of children entering kindergarten in 2009. The 7 weeks lost in 2009 -2010 will be picked up in 2010 -2011, resulting in a 59 week enrollment period, and the children not entering kindergarten in 2009 due to the policy change will accordingly be added to the rolls in 2010. The enrollment period will return to 52 weeks in the years following, and the membership numbers should return to projected levels. Middle The previous year (2007) projection for November 2008 for this level was underestimated by 13 students. The actual membership increased by 75. Over the previous seven (7) years, growth decreased precipitously from 214 to 68 to 4, to —52 and then has seen modest increases of +12, +20,+30 and +75 since 2004. This school level shows a projected need for Middle School #5 in 2013 -14, which is the same year projected in last year's projections. 30 Section II High School The previous year (2007) projection for November 2008 for this level was overestimated by 65 students. The actual membership decreased by -5. Over the previous seven (7) years, change has varied from a high of 199 students to this year's loss of 5 students. Actual real estate market conditions can suppress historical and mathematical trends, which is likely the case in all three school levels within the school system. This year's projection projects a need for additional capacity in 2016 -17, which is one year later than the need projected last year. Additional High School capacity is expected to be achieved by expanding Carrboro High School from 800 students to 1,200 students, as was included in the construction plans for the high school. Orange County School District Elementary The previous year (2007) projection for November 2008 at this level was overestimated by 80 students. The actual membership increased by 7 students. Over the previous seven (7) years, this level has experienced erratic enrollment which changed from -185 to +8 to +44 to +71 to — 10 to +66 to +86 and +7 students a year. This created a historical base of negative growth which was captured by the various mathematical models to produce moderate growth projections. In the Orange County school system, historic growth is more closely related to new residential development than in the Chapel Hill- Carrboro School District, which has a sizeable number of new families in older, regentrified housing stock. Therefore, development activity should be monitored off -line as a harbinger to student growth on a more equal level to historically based mathematical models. The need for an additional Elementary School is not anticipated in the 10- year projection period. However, staff is closely monitoring new sizeable residential projects in the Orange County portion of Mebane and Hillsborough. In addition, OCS is placing a heavy emphasis on Pre -K programming which may also impact capacity at district elementary schools. In 2007, State Statutes were amended so that effective the 2009 -2010 school year, children entering kindergarten must be five years old by August 31 st of the year starting school, versus the current statewide policy date of October 16th. For the 2009 -2010 school year, this will result 31 Section H in a 45 week enrollment period as opposed to the typical 52 week birthday enrollment period, thereby creating a potential for a reduction in the number of children entering kindergarten in 2009. The 7 weeks lost in 2009 -2010 will be picked up in 2010 -2011, resulting in a 59 week enrollment period, and the children not entering kindergarten in 2009 due to the policy change will accordingly be added to the rolls in 2010. The enrollment period will return to 52 weeks in the years following, and the membership numbers should return to projected levels. Middle The previous year (2007) projection for November 2008 for this level was overestimated by 16 students. The actual membership decreased by 36. Over the previous seven (7) years, growth has varied widely and included an unexpected decrease of 78 students in 2004 -05 with smaller decreases each year until 2007 -08 and again decreasing this year. However, certain models did reflect the negative growth ( -185) at the elementary school level in 2001 -2002 as they progress into the middle school cohorts. The district's third Middle School, Gravelly Hill Middle School, opened in October 2006. The need for an additional Middle School is not anticipated in the 10- year projection period. However, staff is closely monitoring new sizeable residential projects in the Orange County portion of Mebane and Hillsborough. High School The previous year (2007) projections for November 2008 for this level underestimated by 19 students. The actual membership increased by 41. Over the previous seven (7) years, growth was relatively constant Even though 4 -year historic growth at the high school level is moderate and recognizable, future projections are more moderate because of the slowing of growth at the elementary and middle school levels. The need for an additional High School is not anticipated in the 10 -year projection period. However, staff is closely monitoring new sizeable residential projects in the Orange County portion of Mebane and Hillsborough. Additional Information for Orange County School District The City of Mebane lies partially within Orange County and students within the Orange County portion of Mebane attend Orange County schools. However, the City of Mebane is not a party to 32 Section II the SAPFO agreement and therefore does not issue CAPS (Certificate of Adequate Public Schools). In previous years, development activity within the Orange County portion of Mebane was minimal. However, development activity and platting of new subdivisions has been steadily increasing over the past three years. . Increased coordination with the City of Mebane regarding development issues may be necessary in the future. OCS currently has capacity to serve additional growth, but it is possible that rampant development in the Orange County portion of Mebane could quickly encumber available capacity. 5. Recommendation — Use statistics as noted in 3 above 33 Section II 111 oil f| ■ E 8 R R \� k� i a 0 ass IG 99 R |�f �d �2 Attachment 11I.C. 1 (007-08) |k � �) BE Is (�§ I (�| � §� U 34 Section II u u Y 9 29 \k�� V M. 2#; .9 a 7S !: E O=. Ru ,2 f p M I-E go 2 L J -F , rg Ga Affachment IEI.C.2 (007-08) z R, \?g air UH s\ so -g- R $ \/ 'U 2. Hu Pik 35 Section II a a E I Diu Attachment H.C.3 (2008-2009) 36 0127/2009 OCS Student Projections (1) (4) Elementary School Year 2000-01 2001 -02 2002 -03 2003-04 2004-05 2005-06 2006 -07 2007 -08 2008-09 2009.10 2010.11 2011.12 2012 -13 2013.14 2014 -15 2015.16 2014.15 2016.17 2017.18 2018.19 Actual 3,078 2,893 1 2,901 1 2,945 1 3,016 1 3,006 1 3,072 1 3,158: 3,165 2,201 - 3,308 3,385 3,432 3,467 3,501 3,536 2,404 3.571 3,607 3,642 Tischler al ,. ,.,. ..,•... ,.. ,.. ,_ ,__.._, •,_. �,e,,,, _,..,� 166 _,,.....,� ,,, 8..,__, 3,234 3,221 3,200 3,206 3,196 a. _3 211 :._ ...,... . , ... ........... , ....:.... 66 ._......,......_. _,,...x._.. i_ .. „...,... ,_,...,46..._.... _._.,_,44 . ,...... „._,._71. _,� .. _ . 10 ... ,__ .. ,....... . _.80.. .... 7, ... OC Planning 3,278 - 3,195 3,202 3,186 . �r,._ .., 3 234.. .�.. .32 3,335 3,241 3,246 3,227 " . "• .:.3 287 �. <..,..._53 .._. - 3,392 3,290 3,298 3,273 ., ,., ::., �.�, 3 337 _ ....,..._ _,.50 3,450 3,303 3,305 3,273 , a, ,. 3 360 , ,_..,.- , ,.33 3,507 3,336 3,338 3,306 , .. of . "'3 398; ... <. 8,..., 3,564 3,369 3,371 3,339 I-.�8 , _. - � 4865 3,621 3.403 3,425 3,373 , ,3 479 - ., , 3,679 3,437 3,439 3,406 3,736 3,475 3,473 3,440 10 Year Growth 5 Year Growth 3 Year Growth Avers e, :. <_ � _ ,_ AnnuaLChan e, ",- Increase: Decrease 'An'Actual &:P,ro ectedMembershi . - _,...., �. -:," a_. Capacity - 100 %Level of Service :3820 :3820 `.3820 3,820 3820 3,920 3922 3,922 3922 :3694 3,694 3,694 3,694 -3694 '3694 3,694 422' 3,694 :3694 '3694 Number of Students Actual and Projected, Over Under 100% LOS 742 927 919 875 804 914 850 ` 764 757 483 460 407 357 334 296 258 '2533 215 180 141 105% Level of Service 4,011 4,011 4,011 4011 4011 4,116 4118 4, 118 4,118 3,879 3879 3,879 3,879 -3879 3,879 3,879 295 .$879 3,879 3879 Number of Students Actual and Projected, Over Under 105% LOS 933 1;,118) (1,110) (1,066) 995 (1.110) 1 046 960 ' 953 J6671 645 J592), 542 519 481 443 2,786 400 365 326 Actual - % Level of Service 80.6%] 75.7%, 75.9% 77.1% 79.0% 76.7% 78.3 % 2 83 87.5% 89.0% 90.3% 90.9% 92.0% 93.0% 585 ) 94.2% 95.1% 96.2% Average - %LevelofService . , ,.,. -... .,,, .. ° .,.. :c6.01/° - "' "' 0.28/° " �.. " x.1:52% . ^:'2.41/° ...,.,:, " ..: , ... -0.33 : , ;3. /° .,... ,.,. .. ,... 86.9% , , '- , . , , Annual:StudentGrowth Rate (3)' :, " , :. � � ._..; . „ ., :.;. 1.47/° .:: ,. ",..._ _., ..,..0.70% , .: 1.64/ ..1.53/° ,, , .1.0.68% : +. :. 3 _,,.1.1 � .... 2 _.11 h _ _; "1.25 °° / • ,,,_„ ;:.7.M./d, .1.13% additional 100 new seats @ Nlllsbomugh �ementary Indicates first year that district surpasses Schools APFO recommended Level of Service I'I It is Important to note that this reflects the November 15, 2008 dale of membership as outlined in by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. m The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS, Original projections used in prior years projection models Included the "Linear Extrapolation Method" for CHCCS. rn Annual growth rate calculated using actual membership for years 2000.01 through 2008 -09 and average membership for years 2009 -10 through 2018 -19 I <t Class sizes for grades K -3 =1:23 for school years 2000 through 2008 -09. In accordance with 2005 School Collaboration Work Group direction, with planned opening of CHCCS Elementary #10 in school year 2008 -09, K -3 class sizes for school years after 2008 -09 reflect 1:21 as directed by past State legislative action. This results In OCS elementary capacity reduction (district wide) of 239 seats (decreasing from 4,118 [105% LOS @ 1:23 class size] to 3,879 [105% LOS (d 1:21 class size]). OCS Student Projections(1) m0lcales nrst year mat oistnct surpasses ounoos mrry re -111 -1 reeu Levei u, oarvrca I'I it is Important to note that this reflects the November 15, 2008 date of membership as outlined In by the Schools Adequate Public Facilities Ordinance. it does not Include CHCCS students attending the Hospital School. m The Taschler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Odginai projections used in prior years projection models Included the "Linear Extrapolation Method" for CHCCS. o> Annual growth rate calculated using actual membership for years 2000.01 through 2006 -09 and average membership for years 2009 -10 through 2018 -19 OCS Student Projections (1) High School Year 2000-01 2001 -02 2002 -03 2003.04 2004.05 2005-06 12006 -07 2007 -D8 2006 -09 2009.10 2010.11 2011 -12 2012.13 2013.14 2014.15 2016.16 2016 -17 2017 -18 2018.19 Actual 1 1,672 1.753 1.828 1,887 2.057 2,124 1 2,184 2,201 - 2,242 2,284 2,324 2,364 2,404 2,444 2,484 2,524 2,564 2,604 Tischler IZI 2,245 2 272 2,175 2,196 OC Planning 2,294 2,160 2,189 2,114 2,318 2,191 2,233 2,124 2,371 2,189 2,247 2,101 2,425 2,267 2,334 2,160 2,481 2,286 2,354 2,157 2,538 2,292 2,363 2,155 2,596 2,355 2,427 2,206 2,656 2.348 2,411 2,198 2,717 2,381 2,440 2,230 10 Year Growth 5 Year Growth 3 Year Growth ,..: Annual Chan e:- :Increase: Decrease 9m :Actuate &.P.ro ected:Membershi :�i ,.,,, ..�: ., , , ., �,,,.. ....... ,,, ,;,; , , .,.. ,.. . ................ 2,159 D. ,._ „> ,,; , s„ ._,,..:; „ -:..: _... „, .. , . _..,,.: , ,:.. ._ , . :: . _..... . ,. ,:. ,.r ,.... ,. . ,. _....„ ,__.. , _. ...... _6.. ,...,.._., 6D..,. _<...., .,,_17.. _..w ,_ __,.41 _. .....:... ....3.92 ,.. ,._..�_81 .. _....... -„ _,75 .._. , _...59 .. , .170. ,.__... 7. _.....,_ �, ..I2 , .... „.........:.30, _ , .,. „._, ., _.. 16 ., .,,..�.�., 64 „ 26 "; 422' .`:. _, �,.2 `435 :; , 2 474, Capacity - 100% Level ofService 1,518 1,518 8 2,618 2518 2,618 2,518 2,533 2,633 °2533 : 2,533 2,533 '2533 -2533 '2533 -2533 -2533 2,533 ''2533 Number of Students Actual and Projected, Over Under 100% LOS 154 235 690 631 461 394 334 332 291 ` 323 325 295 279 215 ` 189 167 111 98 59 110% Level of Service 1 670 70 2,770 2,770 2,770 2,770 2,770 2,786 86 2,786 2,786 2,786 2,786 2,786 2,786 2,786 2,786 2,786 2,786 Number of Students Actual and Projected, Over Under 110% LOS 2 83 942 883 713 646 586 585 ) 15781 1548) 532 468 442 (420 365 351 312 Actual- % Level of Service .1% 115.5% 72.6% 74.9% 81.7% 84.4% 86.7% 86.9% 87.2 % 88.4 % 89.0% 91.5%1 92.6% 93.4% 95.6% 96.1%1 97.7% Avem e - %Level of Service AnnualStudentjGrowthRate(3) ". ' ': - ' -- -. `- - .::4.84% ... ° -, :x.,4.28/° e "..3.23/° .: ° - . -9.01% - .:,.,. ..::.3.26/° =;...2.82% „ ,. 0.78/° ,.1.86/° 0.0% 87.2 % ::,. _..... 44 %...: .:. '.. ,._e -0.07h ,,_:., ,,: .. ..1.35/0 _. ., :::.0.73 %... ,., : .,,3.82/° '. ,.:, ;, ,.,1.94% - - <.- 0.94 %_.. '..._..33 _2 /°., , -. :'.0:57°`, Y / cedar drip high opens with 1,000 seats In fall 2002 Partnership Academy Alternative School capadiy added Indicates first year that district surpasses Schools APFO recommended Level of Service I'1 It Is Important to note that this reflects the November 15, 2000 date of membership as outlined In by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. nt The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used In prior years projection models Included the "Linear Extrapolation Method" for CHCCS. nl Annual growth rate calculated using actual membership for years 20OD -01 through 2008.09 and average membership for years 2009 -10 through 2018 -19 a w• CHCCS Student Projections (1) (4) CICn116111Cn School Year 2000.01 2001.02 2002.03 2003.04 2004.05 1200&06 2006.07 2007.08 2008.09 2009.10 2010.11 2011 -12 2012.13 2013.14 2014.15 2015.16 2016.17 2016.17 2017.18 2018.19 Actual 4,444 4,474 4,551 4,692 4,695 4,879 4,980 5,173 5,302 5,497 5,614 5,730 5,847 5,964 6,081 4,272 6,197 6,314 6,431 Tischler t2) 5,380 5,400 5,466 5,392 5,390 -, °5408 ,.. , .. . ... .,,.. .,.n' . .,,. „. _e3 0 . s& °; _ , , . 9 OC Planning 5,503 5,654 5,512 5,497 5533 5,581 5,782 5,582 5,557 �` 5623 < � 5,657 5,881 5,640 5,609 5703 . 5,733 5,858 5,689 5,649 6755 ,. -.1... . .. 5,808 6,017 5,746 5,705 5848 5,882 6,078 5,803 5,763 t* 5921 .... .=. . .. ,. 5,956 6,138 5,861 5.820 - 6994 . . a.. T3 6,055 6,200 5,920 5.878 6073 ., ?. 6,155 6,262 5,979 5,937 6153` 10 Year Growth 5 Year Growth 3 Year Growth W U ,.: - .._, _ _. ? ,,. .... ..... Capacity - 100 %Level of Service LOS 4,302 4,490 4,211 4.302 4,302 4302 4921 4,921 4921 4,921 4,921 5244 44 544 5A44 5,244 5244 5" 544 ..:. .. .__.. ... ., .... .. n r . - N _. r ,:, ..,.148 :.,.i" . � 199.. 5" 5,244 5,244 Number of Students Actual and Projected, Over Under 100% LOS _... : .__. .,, 87 - � ' 142 172 249 229 226 42 59 252 '. ?58 162 289 379 459 511 604 677 '3035 750 829 909 Capacity -105% Level of Service LOS '8835 11617 4,517 - 5,167 5,167 5,167 5,167 6,167 5,6 06 5,506 b " 5.506 5,506 5,506 5,506 5,506 479 ' 5,506 5,606 '' 6,506 Number of Students, Actual and Projected, Over Under 105% LOS 83 43 34 47 472 288 187 6 204 0011111 26 1 17 197 249 1 342. 1 415 3,339 '. 488 567 647 Actual - %Level of Service 103.3% 104.0% 105.8% 95.3%1 95.4% 99.1%1 101.2% 105.1% 101.7% Number of Students, Actual and Projected, Over Under 110% LOS 105.5%1 107.2% 8% 1 109.7%1 111.5%1 112.9%1 176 114.3% 115.8% 117.3% Average - % Level of Service , . ._: :' ",0.68% ... ' 1.72 %.:: ,. - ,8.10% ° o � ",0106,5 ..< o - ;:8.92k . ".� ..2.07% ..;; _.e.:., .; .. o -:: ._.3.68/s � ..:z.49/o 103.1%1 ,. .: AnnuaiStudent Growth Rate(3) "' ., ' o "." "1.95h ,;,' €: .. _. 2.35% r:. .. ::;1.64/0 ., "i;. .. 1.43% : ,, .. "e _... ,...0.91 % -; 6 ",�" ` �._. 1. 1% ` 1.26%1 `° '° � ` ., „`1.23% - . ". E-E r 15, 2005 Certified Capacity Calculations, CHCCS projects Elementary #10 opening for school year 2008-09. In accordance Elementary #9 opens in fall 2003 with additional 619 seats opted School construction Standards, elementary school capadry totals 600 students. Indicates first year that district surpasses Schools APFO recommended Level of Service ots: Per 2005 egreomentofschool Collaboration Work croup, Grades K -3 class size reduced from 1:23 to 1 :z1 mentary #30 opens (to allow for prior Lagisladve Action re: reduced oleo size) in It is Important to note that this reflects the November 15, 2008 date of membership as ouNned in by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. iz! The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models Included the "Linear Extrapolation Method" for CHCCS. n/ Annual growth rate calculated using actual membership for years 2000 -01 through 2008 -09 and average membership for years 2009 -10 through 2018.19 I4i Class sizes for grades K -3 =1:23 for school years 2000 through 2007 -08. in accordance with 2005 School Collaboration Work Group direction, with planned opening of CHCCS Elementary#101n school year 200 &09, K -3 class sizes for school years 2008.09 through 2017 -18 reflect 1:21 as directed by past State legislative action. CHCCS Student Projections (1) Capacity -100 / Level of Service ` 2,1081 2,840 1 2,8401 +2 840 2,840 ' ` 2,840 1 2,8401 2,840 1 2,840 ` 2,840 1 2,840 1 2,840 ' 2,840 1 2,8401 - 2,840 1 2,840 1 2,840 1 2,840 1 2,840 Number of Students, Actual and Projected, Over (Under) 100% LOS `218 300 232 228 280 268 '248 218 143 (82)1 `14 `. 45 ' 120 219 283 879 -018 X458 107% Level of Service 2 256 3 039 3 039 3,0391 3 039 3,039 3,039 3,039 3,039 3,039 3 039 3 039 3 039 3 039 3 139 21 039 3 039 3 039 3 039 - -n rnasx 1- 1e0o1 1 1AAni 1eanl 1-1171 .1 nta 9 11 12a11 121,411 1154il 17911 29 1 841 1371 180 1 220 1 259 116.1% Indicates first year that district surpasses Schools APFO recommended Level of Service lit it Is Important to note that this reflects the November 15, 2008 date of membership as oul fined In by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. al The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used in prior years projection models Included the "Linear Extrapolation Method" for CHCCS. i'I Annual growth rate calculated using actual membership for years 2000 -01 through 2008.09 and average membership for years 2009 -10 through 2018.19 CHCCS Student Projections (1) nnyu School Year 2000.01 2001.02 2002.03 2003.04 2004 -05 2005-06 2006.07 2007.08 2008.09 2009.10 2010-11 2011.12 2012 -13 2013-14 2014.15 2015.16 2016.17 2017.18 2018.19 Actual 2,815 2,963 3,162 3,330 3,422 3,514 3,520 3,635 3,630 3,862 3,798 3,719 3,662 3,944 4,026 4,108 4,190 4,272 4,354 4A36 4,518 Tischler xzl 31760 3,739 3,664 3,638 3,663 -." x`3697 OC Planning 3,860 3,849 3,777 3,964 3,918 3,838 4.048 4.011 3,898 4,132 4,184 4,031 4,217 4.326 4,115 4,302 4,490 4,211 4,388 4,687 4,318 4,474 4,814 4,375 10 Year Growth 5 Year Growth 3 Year Growth 3,718 3752 3,853 's �° 3 3,904 3930 3,957 4004 4,082 X4124 4,155 4 17= 4,257 4323 4.350 .: 443 6 4,396 - r.' Avera a „.< °� ' °` ° >' • -- = -rw. _. . .. °.;;:, ...,. „.; _.:, -: bershl -< . . . .. . .. e, increase Decrease In Actual: &?Proected Mem ....., , .. ... . ....: ..:. .. .__.. ... ., .... .. n r . - N _. r ,:, ..,.148 :.,.i" . � 199.. ,- .. ". .. ... .. ,: ,. ,..+..,,168 ,. °..... -:. , .,., „...,_ 92 ,..,_. .... .. , ,. .�.:.., _. 92 .. ... „_. ,...., .. , , 8 , -., , , ,.._„ ;...P3,8353 _... : .__. .,, 87 - � ' ° ._,. ....,. ,...._55. _ -� ',: ,. ..., ,'.. _. , ........109 .. :.., ., _, ,,_.. __... .....,... _ . __89 .; -. ..,_ _ _. _...74 -.;93= „_ .,_.,,119 .....,. Ca acit - 100 %Level of Service '3035 '3035 ' -> 3035 ' 3035 3035 '3035 8035 ' +3835 '8835 "3835 3,835 "8,835 ` 3,835 :8835 ' 3,836 3835 3,835 Number of Students, Actual and Projected, Over Under 100% LOS 220 72 - 127 295 387 479 485 200 205 ` 138 83 26 95 169 `289 382 ' '488 ` 601 '. 660 110% Level of Service 3,339 3,339 3,339 3,339 3,339 3,339 3,339 4,219 4)", 4,219 4,219 4,219 4,219 4,219 4,219 4,219 4,219 4,219 4,219 Number of Students, Actual and Projected, Over Under 110% LOS 524 376 17 9 83 176 162 584 (589 - 522 467 358 289 214 95 2 104 217 297 Actual - %Level of Service 92.8% 97.6% 104.2% 109.7% 112.8% 115.8% 116.0% 94.8% 94.7% 97.8 % 100.7% 102.5% 104.4% 107.5% 110.0% 112.7% 115.7% 117.7% Avera e- %Level of Service `'."6.28% :- `8.72 % =. 5.31% :2.76% ` -2.69% "r '0.17% _` ,- ,,, 3.27% . ,,... -' -0.14% 4% Annuai Student Growttr':itate(3) ? "' .. '" _ �` ` "_ '-"' ":1.84° '1.49% ... . -. e"2.90%1:- .x.1.80% _.1.69% , 0 .:2.98,6 ,. ]- 2.26 %. ° °` 2!51% Indicates first year that district surpasses Schools APFO recommended Level of Service I') It Is Important to note that this reflects the November 15, 2008 date of membership as outlined In by the Schools Adequate Public Facilities Ordinance. It does not Include CHCCS students attending the Hospital School. iz) The Tischler Model provides for the "Linear Method" of projections for both CHCCS and OCS. Original projections used In prior years projection models Included the "Linear Extrapolation Method" for CHCCS. �I Annual growth rate calculated using actual membership for years 2000 -01 through 2008.09 and average membership for years 2009.10 through 2018 -19 high school #3 opens In fail 2001 with 600 additional seats Q a �i1 Section II w s o Attachment JI.C.4 (2008-2009) 37 Section II A Student Growth Rate 1. Responsible Entity for Suggesting Change — The updating of this section will be conducted by the Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) each year and referred to the BOCC for annual report certification. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. 2. Definition — The annual percentage growth rate calculated from the projections resulting from the average of the five models represented by 10 year numerical membership projections by school level for each school district. This does not represent the year -by- year growth rate that may be positive or negative but rather the average of the annual growth rates over ten (10) years. 3. Standard for: Chapel Hill Carrboro School District See Attachment II.D.2 4. Analysis of Existing Conditions The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Average Annual Growth Rate over ten years: Standard for: Orange County School District See Attachment II.D.2 Analysis of Existing Conditions The membership figures and percentage growth on the attachments show continued growth at each school level within the system. Average Annual Growth Rate over ten years: Year Projection Made: 2004 2005 2006 2007 2008 Year Projection Made: 2004 2005 2006 2007 2008 Elementary 1.79% 1.95% 2.03% 1.85% 1.5% Elementary 1.68% 1.6% 1.49% 1.84% 1.16% Middle 1.91% 2.41% 2.35% 2.58% 2.03% Middle 1.5% 1.18% 1.42% 1.78% 1.44% High 2.04% 1 1.95% 1 2.04% 1 2.31% 12.21% High 1.21% 0.92% 1 0.98% 1 1.49% 1 1.0% 5. Recommendation Use statistics as noted. Recommendation Use statistics as noted W. 7 Section II I xpp Lei .0 u Attachment II.D. 1 (2007-2008) is O I 39 Section II o� N O N • 1 • `J i • Attachment H.D.2 (2008 -2009) 6 �Q zQ bo �U b Nu W �a 'J DO .G E[C Section H 1. 2. 3. E. Student / Housing Generation Rate Responsible Entity for Suggesting Change — The updating of this section will be conducted by Planning Directors, School Representatives, Technical Advisory Committee (SAPFOTAC) and referred to the BOCC for certification. Projections will be distributed to SAPFO partners for review and comments to the BOCC prior to certification. Definition — A projected number of students that are generated from two different types of housing, "single - family" and "other ". Single - family also includes double -wide or greater manufactured and modular homes. "Other" includes multifamily and single - wide mobile homes. The standards were created during the Tischler and Associates School Impact Fee Report of February 2001. Standard for: Chapel Hill Carrboro School District See Attachment II.E.1 Standard for: Orange County School District See Attachment II.E.1 41 Section H 4. Analysis of Existing Conditions Orange County entered into a contract with TischlerBise, Inc. in 2007 to update the student generation rate analysis and impact fee levels. In December 2008, the BOCC adopted revised impact fee levels based on the consultant's work. Additionally, the BOCC directed staff to follow the process outlined in the SAPFO MOUs to update student generation rates as they pertain to SAPFO processes. The current adopted standards are shown in Attachment II.E.1. The recent student generation rates from the 2007 TischlerBise report are shown on Attachment II.E.2. Also, note that students are generated from new housing as well as from existing housing where new families have moved in. The CAPS system estimates new development impacts and associated student generation but it is important to understand that student increases are a composite of both of these factors. This effect can be dramatic and can vary greatly between areas and districts where either new housing is dominant or new families move into a large inventory of existing housing stock. 5. Recommendation — Adopt updated TischlerBise 2007 Student Generation Rates The SAPFOTAC discussed the most recent student generation rates included in the 2007 TischlerBise report. They recommend the BOCC and other governing boards accept the new, most current rates and adopt them as the standard for SAPFO and the CAPS system. In addition, the SAPFOTAC recommends the definition be revised to include all of the housing types included for both CHCCS and OCS, as shown on Attachment II.E.2. The SAPFOTAC intends to take these changes through the process defined in the MOUs in 2009. M Section II Attachment II.E.l e ra • ! ! f r• • i_ Attachment II.E.l b y� U of �a d d � � W N E u N � O O � ,Y N e ! ! r• i_ b y� U of �a d d � � W N E u N � O O � ,Y N Section III 0 0 ll� V (D U) sum IAttachment H.E.2 I 0 a) 04 00 04 CR a C') O C14 CO N Cf) C) X 1- 0) r LO V- 117 I- V- to W C) U) 0 0 0 0 C:) C,4 (D "D C,) p, LO to CO 00 102 0 0. (D co CO co (D co (3) to 4- E C:) C:) 9 0 fu- C) 00 CO CD E 0 cv Ca E 3: 0 g (D E Ca E 'm E E U- a —(no r :03 LL E Ca 0 IAttachment H.E.2 I O O 0 44 04 00 04 N Cf) C) 0 0 C:) C,4 O O C) CD 0. (D co CO co (D co (3) to 4- E C:) C:) 0 fu- E 0 E Ca E 'm r- LL LL E Ca 0 O O 0 44 Section HI III. FLOWCHART OF SCHOOLS ADEQUATE PUBLIC FACILITIES ORDINANCE PROCESS Abstract: The Schools Adequate Public Facilities Ordinance process has two distinct components: A. Capital Investment Plan (CIP) (Process 1) Timeframe: In November of each year, Student Membership and Building Capacity is transmitted from the school districts to the Orange County Board of Commissioners for consideration and approval and used in the following years CIP (e.g. November 15, 2004 membership numbers used to develop a CIP to be considered for adoption in June, 2005). Process Framework SAPFOTAC projects future student membership from historical data, current membership and hypothetical growth rates from established methodologies. 2. School Districts and BOCC compare projections to existing capacity and proposed Capital Investment Plan. 3. SAPFOTAC forwards data and projections to all Schools APFO partners. 4. School Districts develop Capital Investment Plan Needs Assessment during this process 5. The Capital Investment Plan work sessions and Public Hearings are conducted by the BOCC in the spring of each year. 6. The adoption of CIP that sets forth monies and timeframe for school construction (future capacity) by BOCC. G" i i O U J 44 4.4 " 4-J O Qn Cd U �Cf) U� I1 H V] V ® U l •� �O P4 M rn rA Cl O Cd U � 4 Attachment 1H.A.� o �� 8 0 o Cd o o � o Cd Cd a Cd a 5 Cp CC', o 4-4 O v d i Cd x U N *p y 0 bA 'b O O Cd O m rn P1 O x a�i U N o � cod a 0M U H V] V ® U l •� �O P4 M rn rA Cl O Cd U � 4 Attachment 1H.A.� o �� 8 0 o Cd o o � o Cd Cd a Cd a 5 Cp CC', o 4-4 O v d i Cd x U N *p y 0 bA 'b O O Cd O m rn P1 O x a�i U N Section III B. Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) Update (Process 2) Timeframe: The CAPS system is updated approximately November 15 of each year when the school districts report actual membership and `pre- certified' capacity, whether it is CIP associated or prior `joint action' agreement. `Joint action' determinations of changes in capacity due to State rules or other non - construction related items are anticipated to be done prior to the November 15 capacity and membership reporting date. This update may reflect the Board of County Commissioners action on the earlier year Capital Investment Plan (CIP) as it affects capacity and addition of new actual fall membership. The Schools Adequate Public Facilities Ordinance Certificate of Adequate Public Schools (CAPS) stays in effect until the following year — (e.g.: November 15, 2005 to November 14, 2006). New development is originally logged for a certain year. As the CAPS system is updated, each CAPS projection year is `absorbed' by the actual estimate of a given year. Later year CAPS projections of the same development remain in the future year CAPS system accordingly. For example, if a 50 -lot subdivision is issued a CAPS, 15 lots may be assigned to "Year 1," 10 lots to "Year 2," 10 lots to "Year 3," 10 lots to "Year 4," and 5 lots to "Year 5." When "Year 1" is updated, the students generated from the 15 lots are absorbed by the actual estimate. The students generated in "Years 2, 3, 4, and 5" are held in the CAPS system and added to the appropriate year when the CAPS system is updated. As was discussed in Section II.C, The City of Mebane is not a party to the SAPFO and does not issue CAPS. However, residential development within the Orange County portion of Mebane has increased dramatically in the last two years and over 1,000 residential lots are currently undeveloped. Increasing development within this area of the county has the potential to encumber a significant portion of the available capacity within the Orange County School District. 47 Section III Please note that the two processes (CIP and CAPS) are on separate but parallel tracks. However, the CIP does create a crossover of capacity information between the two processes. For example, the Schools APFO system for both school districts that will be established / initiated certified each year in November and is based on prior year created and / or planned CIP capacity and current school year membership. The SAPFOTAC report including new current year membership and projections are to be used for upcoming CIP development as noted in Process 1. CIP Process I (for CIP 2009 — 2019) November 2008 — June 2009 (using 2009 SAPFOTAC Report) Schools APFO CAPS Process 2 (for Schools APFO System 2008 — 2009) November 2008 - November 2009 u i 9 0 U t/ -N V Le r•v 00 O O N d� �bA O 0 O N N H •U 4a N 00 0 0 N tn .O v� 'Z' N cn U 0 poq 5. o V � b p � C o 0 cd 4; � U Cd U � � F� N ca rn co Z � o� tn � U O M o Cs3 Attachment IH.B.l a� W a� P4 o ,-El a> � o � o a, O a A O cd a3 o cod U ti "' U Id b a 4-j En 0 00 C's U 'd ElEn Cd o ai N .mar .r N�+ N N + a--' � O C4 �N � O N � U �a H Q N� Al V U U Attachment IH.B.l a� W a� P4 o ,-El a> � o � o a, O a A O cd a3 o cod U ti "' U Id b a 4-j En 0 00 C's U 'd ElEn Cd o ai N .mar .r N�+ � O � v b V ® v � " c Cd �j U o s o a� t�j to -t a b b 18 L� U a 2 on Al 0 ��bn� J. 4 1 ^p,Hc O o�aa O v >,U cd4 o wi �16 Attachment IH.B.l a� W a� P4 o ,-El a> � o � o a, O a A O cd a3 o cod U ti "' U Id b a 4-j En 0 00 C's U 'd ElEn Cd o ai N .mar .r I ) 50