Loading...
HomeMy WebLinkAbout2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center~: ~-~.~. YI ~:4 TM Coulter~Jewell Thames, PA 111 WEST MAIN STREET DURHAM, NORTH CAROLINA 27701 p919.682.0368 f919.688.5648 2'1 it ^ ~ { 0 f f? B F ii ? u! c LETTER OF AGREEMENT made this 9`h day of November, 2007 To The OWNER AND LEAD DESIGNER Orange County PO Box-8181 Hillsborough, NC 27278 By The ENGINEERING CONSULTANT Coulter Jewell Thames, P.A. 111 West Main Street Durham, North Carolina 27701 ~/~ ~2/3~2po~ ~ -CI For Civil Engineering Consulting Services To assist Orange County with the design of an on-site sanitary sewer treatment system to serve the Northern Human Services Center located north of Hillsborough on NC 86. Description This proposal is for Civil Engineering services related to the design and drafting of various components of a sanitary sewer treatment system to serve the Northern Human Services Center. Orange County has developed a conceptual and process design for the septic system. The major components of the new sewer system includes a grinder sewage lift station and force main to pump sewage to the new treatment facility to be located on the east side of NC 86, a sewer treatment facility, an effluent lift station, and nitrification fields. This proposal is for Coulter Jewell Thames to design specific pumping and piping components of the overall system and to provide drafting and other assistance for other portions of the project performed by Orange County. Design work performed by Coulter Jewell Thames P.A. will include engineering drawings and technical specifications for assembly by Orange County into the Contract Documents. Coulter Jewell Thames will assemble or assist with assembly of the bid package and contract documents as directed by Orange County. It is understood that this "Agreement" holds harmless Coulter Jewell Thames, P.A. of any responsibility relative to the process and treatment of waterwater being performed by the on-site sanitary sewer treatment facility that will serve the Northern Human Services Center. Process design and associated kinetics and the quality of treatment of the wastewater for the Northern Human Services Center will be the sole responsibility of Orange County. SCOPE OF BASIC SERVICES: 1. Grinder Lift Station 1.01 Design of a new grinder lift station in the reaz of the Northern Human Services Center to pump sewage to the east side of NC 86. If space does not allow construction of a new lift station, design will include conversion of the existing effluent pump tank to the new grinder lift station. 1.02 Design of a new force main to cross NC 86 and that will discharge at the head of the treatment facility on the east side of NC 86. 1.03 Design of yard piping to connect the new grinder lift station to the existing collection lines and grease traps that allows for two existing septic tanks to be converted to grease traps. l .04 Electrical design for power feed to new lift station and design of the lift station instrumentation and control systems. No provisions will be made for emergency back-up power supply per direction from Orange County. 2. Effluent Lift Station 2.01 Design of a new effluent lift station to be located on the east side of NC 86 to pump effluent from the end of the treatment facility to the nitrification fields. The effluent lift station will be a triplex station with each pump delivering to a separate field. The wet well will be a precast concrete vault. 2.02 Design of force mains to the nitrification fields. 2.03 Design of splitter boxes at the head of each nitrification field. 2.04 Electrical design for power feed to new lift station and design of the lift station instrumentation and control systems. No provisions will be made for back-up power supply per direction from Orange County. 3. Drafting Assistance for Other Portions of Project 3.01 Provide drafting assistance to Orange County to support their design efforts for the remaining portions of the Project. Drafting and assistance will be provided to Orange County as directed by the Orange County Engineer. 4. Site Plans 4.01. Prepare site plan drawings and applications for improvements on the east and west sides of NC 86 for review and approval by the Orange County Planning Department as directed by the Orange County Engineer. 4.02 Meet with the Orange County Planning Department as required for review and approval of the site plans. 4.03 Make revisions as required to the site plan drawings. 5. Project Manual 5.01 Assist the Orange County Engineer with the preparation of a project manual by developeing contract documents and assembling bid packages as directed. 6. Additional Services not included in Basic Scope of Services, which can be performed at the direction of the Owner 6.01 Permitting of the septic system. All permitting will be done by the Owner. 6.02 Bidding phase services 6.03 Construction observation, as-built drawings, or construction administration. 6.04 Re-designs authorized by the Owner after plans have been accepted by the Owner. 6.05 Re-designs due to unknown or unanticipated field problems including, but not limited to unsuitable soil and undiscovered utilities. 6.06 Laboratory testing of materials, borings, and specialized geological studies 6.07 Assistance in negotiating for land and easement rights. 6.08 Construction stake-out of any site features or details 6.09 Permit Application Fees, Site Plan Fees, Re-review Fees 6.10 Environmental assessments other than Wetlands Delineation 6.1.1 Wetlands/Stream Disturbance Permitting 6.12 Surveying The Engineering Consultant will not be responsible for or have control or charge of construction means, methods, techniques sequences or procedures or for safety precautions and programs in connection with the work, and will not be responsible for the contractors failure to carry out the work in accordance with the contract documents. The Engineering Consultant will not be responsible for or have control or charge over the acts or omissions of the contractor, subcontractors or any other agents or employees or any other persons performing any of the work. It will be the responsibility of the contractor to verify the depth and location of all underground utilities prior to starting construction. Should any underground utility not be located as shown on the drawings, the contractor will notify the Engineering Consultant immediately before starting any construction for a resolution of the discrepancy. The Engineering Consultant will be saved harmless from any damaged utility during construction with the cost for repairing any underground utility borne by the contractor. OWNER RESPONSIBILITIES: The Owner will appoint a representative through which all communications with the Engineering Consultant will take place. The Engineering Consultant will be allowed access to the site at all times. The Owner will be responsible for payment of any and all permit and application fees. The Owner will keep the Engineering Consultant apprised of all relevant information that could affect the work. The Owner will also be responsible for any fees charged by utility locating services. The Owner shall also provide the Engineering Consultant with a sealed professional survey of the sites. The Owner will be responsible for providing the Engineering Consultant with flow requirements for both pump station sites. The Owner will be responsible for designing all aspects of the sewer system not outlined to be designed by the Engineering Consultant. The Owner will be responsible for permitting the sewer system through Orange County Environmental Health and the State. The Owner will be responsible for all bidding, construction administration, and construction observation. All design parameters will be provided by Orange County. COMPENSATION: Compensation for basic services as outlined in the above scope of work will be provided for the stipulated sums listed below plus reimbursable expenses as listed in the attached schedule. Additional Services will be performed as requested according to the hourly rate schedule. 1. Grinder Lift Station -------------------------------------------------- $ 15,000.00 2. Effluent Lift Station ------------------------------------------------- $ 17,500.00 3. Drafting Assistance ------------------------------ Hourly, estimate $ 15,000.00 4. Site Plans ------------------------------------------ Hourly estimate $ 15,000.00 5. Project Manual ----------------------------------- Hourly estimate $ 12,000.00 To tal Estimated Cost ----_________________________________ $ 74,500.00 (Includes estimate for hourly services for Items 3, 4, and 5) Standard Hourly Rates Licensed Professional Engineer ................................................................................ $ 120.00/hour Licensed Professional Landscape Architect ............................................................. $ 120.00/hour Licensed Professional Consultant ............................................................................. $ 120.00/hour Survey Field Crew .................................................................................................... $ 120.00/hour Engineer-in-Training ................................................................................................ $ 85.00/hour AutoCAD Technician ............................................................................................... $ 70.00/hour Secretarial ................................................................................................................. $ 30.00/hour Standard Reimbursable Expenses Blueprints $1.50/sheet Mylar Sepias $10.00/sheet Photocopies $0.10 /page Plotting $10.00/sheet Postage, Express Mail cost Long Distance Phone cost Film and Photo processing cost BILLING AND PAYMENT: shall bill the Owner monthly for the percentage of each phase completed since the previous billing period. Respectfully tendered this 9~' day of November, 2007 For The Consultant COULTER JEWELL THAMES, P.A. i t2~!~~. Daniel A. Jew,zll, RLA, ~ASLA President ATTEST t ven P. Bailey, PE V President For The Owner ORANGE COUNTY Orange S aA ~s Date: ATTEST D na S. Baker, Clerk Date: ~ ~ d v ~~ ~~~ ~ t~ ~ PROJECT ~dA~ \ ~ ~, ~d AL NORTHERN COMMUNIT'~ PARK PHASE I AT THE NORTHERN HUMAN SERVICES CENTER CEDAR GROVE ORANGE COUNTY, NORTH CAROLINA - PROJECT NO. 2G4 MAY 10, 2007. r :~~ TM~~- S COULTER JEWELL 'THAMES, PA 111 West Main Street, Durham NC 27701 Ph: 919-682-0368 :~ ~nge County NORTHERN COMMUNITY PARK MAY ?007 fN WITNESS WHEREOF, said Contractor and Owner, being duly authorized, have caused these presents to be signed in their names as of the day and year first above written. ATTEST: ~ Orange County, a North Carolina municipality Name: ~:~ Title: Clerk to (SEAL) TATE OF ~,~' s COUNTY OF .` ~~r~!^2~', E°£:*,ti6Z~£# ~p 2¢:i' w..,_:"<1 .avv~.-zn::•~ii, I , a Notary Public of ~~~ County, State of ' ti.; do hereby certify that - Gt~G personally came before me this day and acknowledged that he/she is the Chair to the Board of the C unty Commissioners, a North Carolina municipality, and that, by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its Ghair to the Board, sealed with its seal, and attested by himself/herself as its Chair. ,~1 ( Witness my hand and official seal, this the ~ day of ts~q}2t3 ~ `~ Notary Public ~ Mfr ~"' My Commission Expires: ~/G~ ' /~ ''~ [OFFICIAL SEAL] • AGREEMENT CONTRACT 00500-5 ~~ Orange County Orange r,,,...~ NORTHERN COMMUNITY PARK ~ MAY 2007 [OR: Contractor's Signature, if a corporation] R: a ~IIRG-~tiytA/ corporation ATTEST: , ` ~-_ i By: C?~~ck~ vw+~~Secretary Name: (SEAL) Title: _ STATE OF ~.~ 1 t COUNTY OF ~~~~~ _ ~_ a Notary Public of Cou ty, tale of_..--- do hereby certify that ~ personally cam a ore me this d and acknowledged that hels4~ is rt~a-~~ Secretary f CC ~ a _ corporation, and that, by authority duly given d as the act Q~ the corporation, the regoing instrument was signed in its name by its ;, ~,~.~.. C~.C~z1 President, sealed with its corporate seat, and attested by himselffel€ as its ;4.~.t~~-r.~s~. Secretary. ((,,~~"" Witness my hand and official seal, this the I~U`~~ day of ~ , 20~~ My Commission Expires: ~ ~' [OFFICIAL SEAt_] IMPORTANT NOTE: If the Contractor is a Corporation, the legal name of the Corporation shall be set forth above, together with the signature of the officer or officers authorized to sign Contracts on behalf of the Corporation. if the signature is by an agent other than an authorized officer of the Corporation, a Resolution must be attached hereto. The signature of the Contractor shall also be acknowledged before a Notary Public or other person authorized by law to execute such acknowledgment. a~RF.FMp:NT CONTRACT 00500-7 ~,' yep • ORANGE COUNTY BOARD OF COMMISSIONERS ACTION AGENDA ITEM ABSTRACT Meeting Date: December 3, 2007 Action Agenda Item No. (a - d SUBJECT: Amendment -Additional Services - to Professional Services Agreement for Design of Northern Human Services Center to Include Work on Septic System DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Proposal from Coulter Jewel Thames Paul Thames, 919-245-2303 Pam Jones, 919-245-2650 . PURPOSE: To consider authorizing a change order for the design work associated with the Northern Park to include completion of the design of the septic system that will support the Park and the adjacent Northern Human Services Center. • BACKGROUND: The se tics stem ro'ect at the Northern Human Services Center has P Y p 1 been in process for several years, pending property acquisition to expand the system, regulatory approvals from the State and County and completion of the design. Although the County Engineer has prepared a conceptual and process design for the Northern Human Services Center septic system, oversight of the construction of the recently completed Buckhorn sewer and the work toward planning construction of the system that will serve the downtown Efland area have prevented the completion of the specifications and drawings for the Northern Human Services Center system in a timely manner. Since the septic system will support both the Northern Park (the beginning of construction is imminent), as well as expanded usages of the Northern Human Services Center, the need to complete the design construction documents, final permitting and construction of the septic system is critical. Coulter Jewell Thames (no relation to the County Engineer Paul Thames) is designer for the Northern Park Project. The.design work being proposed is consistent with work the firm would normally perform on the park project and it is therefore recommended that the design of the septic system be added as a change order to the existing contract for park design. The specific work that would be included in the change order, as detailed on the attached proposal, is summarized as follows: • Design of Grinder Lift Station • Design of the Effluent Lift Station • Drafting assistance to support the County's design efforts for the remaining portions of the project. • Prepare final site plan • Assist in the preparation of the project operation & Maintenance manual for the system Coulter Jewell Thames estimated completion time needed for the drafting/design work and submittal for final permit approval is four months, for permit approval is two months, and for bidding and construction is six months. The County will require Coulter Jewell Thames to provide bi-monthly updates regarding the status of this project in order to stay abreast of the progress and to place the County in a position to provide assistance should the project be delayed during the permitting process. a FINANCIAL IMPACT: The Board is asked to approve a change order for this work not to exceed $74,500. Approximately $27,000 of that amount is attributable to work on the site plan and the project Operation & Maintenance manual, both of which may be accommodated through the County Engineer's office with assistance from the Environmental Health Division of the Orange County Health Department. The consultant will provide an updated construction cost as part of the work. Project funds from the County's 2004 Net Debt Reduction Bonds fund the construction of the system. Although the work would be accomplished via a change order to the Northern Park Project design contract with Coulter Jewell Thames, the design and construction costs for the system would be charged to the septic system project account. RECOMMENDATION(S): The Manager recommends that the Board approve a change order for additional services in the amount not to exceed $74,500 for the Northern Park design project to include the drafting/design of the new wastewater treatment system as outlined above; and • authorize the Chair to sign on behalf of the Board. •