Loading...
HomeMy WebLinkAbout2008 Abstract - Housing- Housing Rehabilitation Contracts AwardsORANGE COUNTY BOARD OF COMMISSIONERS • ACTION AGENDA ITEM ABSTRACT Meeting Date: August 19, 2008 Action Age a Item No. ~- SUBJECT• Housing Rehabilitation Contract Awards DEPARTMENT: Housing/Comm. Development PUBLIC HEARING: (Y/N) No ATTACHMENT(S): INFORMATION CONTACT: Bid Results; Work Specifications Tara L. Fikes, 245-2490 PURPOSE: To award housing rehabilitation contracts for the Orange County CDBG Scattered Site Housing Rehabilitation Program. BACKGROUND: The Housing and Community Development Department solicited bids from qualified housing rehabilitation contractors participating in the County's Housing Rehabilitation Program for the general repair portion of the work specifications. Bids were also solicited from • lead based paint abatement contractors for items containing lead based paint as required by federal regulation. The informal bidding process is governed by the North Carolina General Statues §143-131 and does not require a minimum number of bids. Additionally, present program procedures provide that housing rehabilitation contracts be awarded to the lowest responsible bidder. Additionally, all contractors participating in the County's Rehabilitation Program are required to utilize current deconstruction and material recycling methods during the repair process. Bids were solicited from participating contractors for the housing repair work for the three properties and the required lead abatement work for the Starlite Drive property. Bid results are attached. FINANCIAL IMPACT: Funds are provided by a CDBG Scattered Site Housing Rehabilitation grant awarded by the N.C. Department of Commerce and the HOME Investment Partnership Program. RECOMMENDATION(S): The Manager recommends that the Board award the following housing rehabilitation contracts: Dwellin4 Unit Bid Amount Contractor 225 W. Orange St., Hillsborough $43,425 Triple J Construction Co. 109 Starlite Dr., Carrboro $47,745 Triple J Construction Co. $ 1,580 Eastern Environmental 1709 Rusch Rd., Chapel Hill $43,970 William Long Construction 2 RESULTS OF BID OPENING OWNERs_Eliza Torain APPLICATION NUMBER: CDBG-SS 2007_ ADDRESS: 225 W. Orange Street COST ESTIMATE:_$41,900 Hillsborough, NC 27278 PERCENTAGE OF BID OVER UNDER COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY BID AMOUNT 1. Harmony Homes LLC $49,905 2. THD Construction Co. $49,571.85 3. Triple J Construction Co. $47,745 4. Remaley Construction Co. $50,055 5. 6. BID OPENED BY: Jim Hutcherson TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: July 16, 2008 WITNESSED BY: Roxanne Reynolds ****************************************************************** Lowest Acceptable Bid: $47,745.00 Negotiated Amouat: N/A Contractor: Triple J Construction Co. NAME _1808 Pinecrest Street; Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUMBER CO1~II~N'PS Submitted by: Bid Approval Date _ Proceed Order Issued Jim Hutcherson Date 07-16-08 7 •i •i 3 i• i• RESULTS OF BID OPENING OWNER: Martrina Morrow APPLICATION NUMBER: CDBG-SS 2007_ ADDRESS:_109 Starlite Dr. COST ESTIMATE:_$45,425 Carrboro, NC 27510 PERCENTAGE OF BID OVER 5% UNDER COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED COMPANY BID AMOUNT 1. Harmony Homes LLC $49,905 2. THD Construction Co. $49,571.85 3. Triple J Construction Co. $47,745 4. Remaley Construction Co. $50,055 5. 6. BID OPENED BY: Jim Hutcherson TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: July 16, 2008 WITNESSED BY: Roxanne Reynolds ****************************************************************** Lowest Acceptable Bid: $47,745.00 Negotiated Amount: N/A Contractor: Triple J Construction Co. NAME _1808 Pinecrest Street; Burlington, NC 27215 ADDRESS 336-227-6125 TELEPHONE NUMBER GONII~]'TS Submitted by: Bid Approval Date _ Proceed Order Issued Jim Hutcherson Date_07-16-08 4 RESIILTS OF BID OPENING OWNER: Martrina Morrow APPLICATION NUI~ER: CDBG-SS 2007_ ADDRESS: 109 Starlite Dr. COST gSTIMp,TE:_$1,850 Carrboro, NC .27510 PERCENTAGE OF BID OVER UNDER 14~ COST ESTIMATE CHECK ONB:JOB BID X JOB NEGOTIATED COMPANY BID AMOUNT 1. RGO $1,778 2. Eastern Environmental $!,580 3. 4. 5. 6. BID OPENED BY: David Saconn TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: July 23, 2008 WITNESSED BY: Jim Hutcherson ****************************************************************** Lowest Acceptable Hid: $1,580.00 Negotiated Amount: N/A Contractor: Eastern Environmental NAME 25224 US Hwy 17 North, Hampstead, NC 28443 ADDRESS 910-329-1129 TELEPHONE NU1~3ER CONII~RENTS Submitted by: Bid Approval Date _ Proceed Order Issued Jim Hutcherson Date 07-23-08 •i • 5 i• RESIILTS OF BID OPENING ADDRESS:_1709 Rusch Rd. COST ESTIMATE: _$45,650 Chapel Hill, NC 27516 PERCENTAGE OF BID OVER UNDER 4~ COST ESTIMATE CHECK ONE:JOB BID X JOB NEGOTIATED OWNER: Dorothy Baldwin APPLICATION NUMBER: CDBG-SS 2007 • 1. 2. 3. 4. 5. 6. COMPANY William Long Construction Harmony Homes Construction Triple J Construction Co. Diamond Builders BID AMOUNT $43,970 $56,902 $58,555 $61,744 BID OPENED BY: David Saconn TIME OF BID OPENING: 3:00 PM DATE OF BID OPENING: February 29, 2008 WITNESSED BY: Sharkita Torain ****************************************************************** Lowest Acceptable Bid: $43,970.00 Negotiated Amount: N/A Contractor: William Long Construction NAME _3761 Phillips Chapel Rd., Haw River, NC 27258_ ADDRESS 336-376-0170 TELEPHONE NUMBER CObIl~1TS Submitted by: Bid Approval Date _ Proceed Order Issued Date_02-28-08 David Saconn • DATE: Apr115~ 2408. BI' La`r'd Sac~nn ~eiab Spaeialst I~TOTE TO CONTRAG'T'C~R C4NTRACT~R SH4LJLD REFER TO TIIE BASIC SPECIFICATIONS, PROPERTY REIiABILITATI~AT STAIrIDARD~, CENfERAL CONDTI`IONS,,I~TORTH CAROLII~TA BUILDING CODES MA~TUAI., AND tDRAISICrE C4LTNT~ 1~I][~T1iVICIiV HOfiTSINC CODE 17I?CLII'TS, IT IS NOT THE INTENT ~DF THE Vt~RITI?R TIC? DIItECT A]~Y`` CO1dTRACTQR: T© A_. SPECIFIC SUPPLIER OF MATERIALS {~AI,LED FOR. IN 'THIS WORK. ~VRI'TE-LTP ONLY TO SPECK' A 'TYPE:: THAT- \?VOULI): BE ACCEP'T'ABLE T4 THE:. HOMEO~~NER AnID ORANCrE CQT7NTY FiQUSIt*1G REHABILITATIC?N' PRC1GRAiVT. 1~am~ ElizaToTan ;Address: 2~~ W. ()range-St. .. City; Hillsborough, N.~ ~7~'18 Phone: 73~-853 . Date: April 15 2~Q8' ROOF & GUTTER 1; Remove the shingles and felt, paper to the sheathing: Prepare sheathing for a nevi shiiigle.YOO£ Check roof sheathing; for. exposed:naiLti and loose° decking,. Install 1 SIb felt paper, wh"t~'eve starter,, new vent boots ai#d new chiinne~ flashing. Note: Reinoue the old heater vent frmiri the rear section and Batch roof CJse a hand-held grinder to cut a groove I'or the new chimney flashing: Install step and. counter flashing; Install 25 year shingles. Note: White eve starter shalt be, install along all: eves and gables. Carefully temuve the satellite dish. ~. Install a shingle°type ridgevent Remove a three ~3) inch section fmm the ridge. Ridge vent ~ start approximately 18" from gables.: 3, Remove the alurnnunt fascia oti both side of the unit. Install '74' of new matching aluminumn coil: stock vn tl1e fascia, Replace 12f# of`damaged aluminum on the rear gable. Refer to Rehabilitation. specialist fox location. Contractor to use proper roil-stock and -aluminum nails. 4. Install. a missing seetiQn:Ala soffit on the front porch overhang. l~t~te.~glfifit material to match as close as possil~l 5. Install seamless aluminum gutters and downspouts an the umt. Note: Gutters fa be properly installed. 'The downspouts located: on the front: (facing W. tira~iige St.) shall terminate into solid Brainy tile: Nate; The solid drain the shall be'irtstaIIed in: the same ditch as the foundation drain tile. EXTERIOR: 1. Pressure-v~+ash the eztenor of tfie unit. l+Tote;, The pressurre washing. to be done after alI exterior work is. complete:: Contractor to use.-the proper vin~+l sidutg gre-treat cleaner tc~ remove diet and mldepv, ~, Fili the cracked ma~rtar joints on the right rear foundation v4rall, Contractor may use masoJiry caulk filler. Finish to match existing wall. Name; E°li~aToran Page~2'. Address: 5 V4': Orange fit. City: I~tllsl~rough, N.~~ 27278 phQrie: 732-8~+i Date:,April 15, 2UQ8 F~TERIQR ~, Install new drain file on the side foundation wail; Refer to;Rehabilitation Specialist for location: The ditch to be a nunimum of 2A~"wide.-Install slotted drain tle-.with sock: and stone: Note: Install a minimum of 8" of stone ova the drain tile. The. d~airt file to extend around die concrete porch and down the side tci provide positive drainage away frt>m the faundation wall. Crontractor to use proper fittings; The: ~A file discharge shall terminate not lass than 'TO feet from'the foundation wa1L Note: The drain-.tile shall lie slotted when against the foundation wall Install slctitted drain hle againstwall and solid in y for discharge,.. 4, Clean ~ivnt f+nurtdation ~vali with ufafier ht~se and brush to remove ail dirt and debris. Apply two coats ofcement-:based foundation coating:. (Thoroseal. 8~ Acryl GQ) Note.'Rehabilitaton Specialist.to inspect work before drain file and ston+a is installed. S; Add one:(l~ tandem load (`12) yards of soli around the foundation. Refer to`Rehablitatinn Specialist fc~rlocati'on of soil.'Slope soil away from foundation wall, Seed and straw-the. ejcpQSed area.. . fi 7. Install a storm door on the back door: ~ kitchen areal The new storm door to be vyhite aluminum conlpletc with closer;.; locking handle, sweep and: screen. Storm door to open, close arid..latch properly: - Carefully remove. the vinyl sdingon: fhe right sidle gable to belo~r the windows. Re~ail the loose ~srood siding that is pushing the vinyl away from thewall. Reinstall vinyl siding properly: _ 8. Itppa~ six ~~ demaged sections of vinyl siding: (;holes :and cracks Install n~v matching valor siding. Cansnlt Rehabilitation Specialist about color match. • • V Name: Eliza.Torain ~adn~s: 225 w; mange 5t. City: Hillsbarougli, At.C; 2727.8 Fhone: 732-8543 Date, April 153 2008 STORA~I WINI3UWS. 1. Irxstaii a 1 x 3 woad fi ame around #h~ misting windows:. Remove. or trim the-existing vinyl sid~ing,,tQ. accommodate the wood frame. Install yeilov~r pine; cedar +~r furtrim. Prime new wood with an oil based primer,. Caner lx~ trim with white atumimum cckil to match Page 3 bsixing trirrt. Note All joints, to bewater.--tight anal aluminum to be bent properly. Alum~innrn far leader section shall extend a min;mum of 4" behind siding .Install whits double tracks 1 over 1 Larson storm windows: Apply all necessary caulk to provide water-tight fit. 2 Install never white vinyl shutters: on the' four `(4) windt~wsi D40RS: 1. Install alumiinucn thresholds with rubber. inserts for' both doors. • Trim-bottom of doors to clone t%ghtly against::-tile thresholds.: . Prime and paint bottom of doors after door is properly fit to threshold;: 2. Install new jamb type weather stripping oz~ both doors. Note: Refer to fZ.ehabilitation Specialist for proper type oi~vveather stripping; (lVietal strip with vinyl insert) ELECTRICAL': l;. Install a new 200 atop. service' panel, mast and,meter base and proper grounding; Price to .include all new switches, receptacles, covers;, arc fault breakers and hard wired smoke detectors. Make all electrical conmectons per code.. _ 2. Install two new exterior Tight: fixt~ues at ba#li doors. Light fixture allowance is $ 3~;(?~ per. fix' true, Make. all electrical connections,. Install vinyl. mounting. blocks to mount e~ctnrior factures. IVlountir~g' blocks to have recessed':section for coimeetflns and surface snap. ring. . 3. Preperiy wire the existing exterar motion light fixture on the side gable to code,lVloi~on light to be controlled by a wail switch in the. hallapproxmatelq six feet limn the floor. • !0 tame; .Eliza Torain :Address 225 ~, ~'Srange St. pity: Iiillsbarough N:C. 27278 Phones 732 SS43 'bate: April I5, 2408; ~: Install twa lights in the crawlspace Fiactures to be spaced t4 eve. adequate light :in tfie cra:~vlspace. The lights 'to be controlled by a switch within 3 ft:of the cravKlspace boor opening, 5: Install a combination ceiling light fi~fur+ea~exhaust fan ih the bathinam controlled by a wall switch. Duet the'fan tQ the egterior through the boxing using 4".metal duct. The fari to be completewith back draft; damper,l!dote: The ezhaust fan shall: be a minimum. of 5f Mahe all el~clrical and mechanical connections per c.ode. _ ,.. 6: Install a new vatuty light. fixture. The future to be controlled by a wall switch. The fracture allowance is $ 3Q;OU. Consult owner fqr finish,. Make all 'electrical connections: '~, Install anew ceiling light fixture in bedroom # 3. The fixture all©wance is ~ 3D.00 Pei 4:xture. Reinstall the ceiling fans in ffie .: kitchen, dining room and both.bedreorns. i 8. Install a Ipb CFM exhaust fart in the kitchen ceiling. liistall the axhaust fan over the oven, 8efer to Rehabifitatiaii specialist far location. The exhaust fan to be controlled by a wall switch. Tent theexhaust to outside air into'boxing. Ail.work to meet code: 9. Install a ceiling fan with light`kit. in the liking room ce~`ing. Install: a ~rcuit controlled by a wall switcH to control the fan. Install ~i 4" fail. Owner to approve type and finish of nevi- fan. T-.fan allowance. is $ I D(l.U+~. Install app~ved "hox and matte all connections per code; 14. Install a GFI circuit and receptacle irithe bathroom per code, 11, Install a 2"d CrFI circuit and receptacle to the left of the kitchen sink.. l2, Install four approved. fan outlet boxes on all existing fans.. • • • • i~ Name: Eliza,Torain Address: W. C?ran$e fit: qty: Hillsborough; N.C, 27228 Phone: 7~2=854 '.Date: April;l5,, 20118. Page s I1~SIfLA,TIpN; 1. Install ~ 19 floor nsa.~tion in the cra~vispacel~Iote: All insulation to .be properly instilled and inspected by (?tange County Inspection Dep# 2~ Rernove all :debris: from the crawlspace and prepare crawlspace for 6=mil poly.. Level all high areas: of soil and fill in low sectflns against lovt~er side wall. Install.6-roil poly in the crawlspace. 3 Install R=13 insulation in the elcterior ba#liroc~m wall. MECHANICAL: 1. Install a new gas pack FIUAC syst+~n::Mechanical system'to be sued in accordance with ASp[1tAE~Manual "T' specifications and: dwctworl~ design to be in accorriancewith `IiRAFlManual."D" specifications. Idew heaftau system shall be,a coxriplete operational system. All.°worl~ to pass .current Mechanical Codes. Price to include flcior registers, gas piping, thennastat ductwork and- permit.. N©'TE: Mechanical. Contractor shall ~uxnish paperwork to certify meeting tl~e above requirements. Note'. Gas roam heater in living room to :remain in unit 2. Remove the vent :less ..gas wall beater ur the hallway, Remove all gas piping in the :hallway. Cap. 0#1; gas lines''n crawlspace; PLTJI~!IBING: 1. Install new PVC' drain lines to all fixtures. New drain lines to meet. currenfiplumbingrode. Install all necessary cleanouts and gents per code. A permit is required and work to be inspected by Zige County It~peeton I'~epY. ~. I~rstall a Sewer cleanout within. 3 feet of the foundation wall. Work to pass plumbing inspection. 3~ Insulate all supply lines'n the crawlspace with %Z''pipe insulation.: Note: New pipe insulation to be installed properly: All corners to be- cot on a ~Sa/o angle and #apecl. ~a Nam~,e Eliza Terrain address: 22~ VV. C)range'St. City:. Hillsix~rc~ugh, N_:~ X7278 Phone: 732.::5543 Diate: April I5, 2005'. 4.. Install ~ frost pmo~ water spigot on fife bacl~ of tt~e unk Make all plumb'mg;connections> 5. install a nev mangle lever f3~ucet with sprayer in the kitchen: Note: The faucet to >7e aDelta orpre-approved equal. install new dram lineassembly/~-traps sup{~1y Lines :and cut-offs. 6: Install a dew handicap commode, supply line and cut-ofd Nate: Thy new commode to be a I~oliler, crane or Amencari Standard or pre-appmvstt equal. Supplyaew wax seat and bolts. Note. Remove all threaded nipples'-to cutoffs. Install copper or pez fittings.. 7: Install a. single lever combination tublshawer valve: The- valve tt~ be a Delta or pre-approved equal. 8. Install a'hand held shovve~ with twsi (2j:wall clips,: Install one clip at regular shower head height and the seconid clip approximately • X40" from the. bottom. tub surface. '9, Reinstall the e~tisting wail.. mount sink; install a new single lever faucet Sink faucet to be a Delta or pre-appmvedequal.,Instail. nevt~ drain line assemllYlP-trap,supply lines ante cut-offs. I~Tote. Remove any threaded iupples in wa11 to cut-off. s. Install coppery ar pex fittings:: 10. Install a new trip. lever/drain lineup-trap assembly! for the: tab. Make all plumbing «~nnections to code:. 11. Install a PAC wall panels in the shv~ver. Install three wall panels tsi properly ftt sower walls. !Caulk all corners and base with l0U°,~o tubfshower silicone caulk. Farrel base and corners to bewater tight;. 12. install a main, water cut-0ff within 3 #t t~f the crawlspace door: opening; Install a lever type water cut-off naive. 13: Install a water pressurerreducing valve or regulator on the supply- linepetcode.: 14, Install °an expansion tank for'-'the water heater per code: • - X13 Pa~~ Name Eliza Torain .Address; Z25 qV. Grange St. pity: I3illslzorough; N C. "2238 Phone.- 732-ti543' Date. April l:~`, 2008. I~TCHEN / D~NING~ R04M & HAT,L i .: Remove. all cabinets, sink and countertop in fhe kitchen. 2> Install new base: and wall cabinets; Ov~+ner to choose 1~nish- (.white or ~oa1c firrish) The cabinets shall have hardwood finnts and a factory finish, All'-hardware to be self-closing hinges-with matching pulls or knobs, All exposed ages to be flush with factory f nish. . 3. Install a rolled back formica counter top. Dote: Owner'to -choose color/fixrisht: Wli#e„ almond etcj Note: 'V~a11 end of "countertop to baclt splash installed. All edges to: be finished. 4: Prepare the floor for vinyl. Install3/8" BC plywood in the kitchen/" dining morn floo#; Install'~~" lauan plywood: on the hall: floor.: Note: AU plywood and vinyl to:be. properly installed. ~' The vinyl to cost not less than $1.00 sq, yard. Install new metal. trim where~vinyl mee#s hardwood or carpet. -- ~. ~ Install nevyr wood shoe molding at all cabinet and wall areas. Prime the shoe molding u~-i#h an oil based primer. ~~I1 all nail "holes and prepare for paint. BATHROOM: 1. Reznave the following items in the bathroom; Commode,; sink, door urrit, ~rindvw and wall covering and file-m the framing N(}TEt Do not "damage tab and wail mount sink. 2. Frame tho window opening wiih 2x~ franiin~ Install sheathing: on the ercteror.. Fur opening to existing woad siding and install fanfold insulation and vinyl sitting. Contractor to match color as close.as possible. Note. ff new vinyl siding is not a close match, The Ownex, Coltrac#or and Rehabilitation Specialist will . meet to~review the work, determine a course of action and,..f necessar3r, a cost for any additional work, . 3, insta112z8 fraxniing for`: two (2j grab bars 1n shower areal: Consult owner for location. 0 Name; Eliza°T'orain p~e'$ Address 22:5: W. t~arige St City:;Hills~oreuglt, I~I.C. 27278` Phone. 732-8543. T3ate: Apra 1:S, 24Q8 4. Install two. i'~'~ stainless steel grab bars in the shower area. I1ote Grab bars shall be screwed into framing atul lie secure. Install stainless steel screws :Install one 36 inch grab bar and one:. 3{l inch grab bar: 5, Refinrne the door opening to receive a 32"'wide doox ~ 341:" Install a 37 %'` header with j aclc studs.. Note: Price to include sheehvck work oa Hallway aide: Install a 32" interior door unit. The-door to swing agains# the back wall of the bathroorri. Tlie new door to open, dose and lock properly. Install a privacy lockset. Prime the: door unit v~ritli an ml based primer-. . 6, Prepare the walls and celing:for 1VIlt sheetrock. Locate ,framing in ceiling. Install mold resistant wall board in the tnblshower area., Install 1V11t sheetir~ck Qn, the walls and ceiling. Finish the sheetrock " smooth„ Nate: Nail Boles acid seams should nat be visible, Prirtie ttie walls and ceiling with a new construction primer: 7: Prepare the floor far vinyl, Itastall. Y," lawn plywood and a ne3v vinyl :flocn: The vinyl to cc~st'not less than $ 14,00' sq yard. Install a metal strip at door seam, Apply acaulk-bead where the vinyl meets the tub. Floor area- 5' ~ 5'.S" 8. Install wood molded baseboard and slue molding in bathroom, Fill alt bails lades anc~ prime with an oil based primer: 9,; Install; a ftvepiece- accessory kit. Tlie lat to nclude'twc~ twenty- four inch towel bars; soap dish,. tumbler holder and paper hfllder, All hardwar+~ to be secure in wall.: fl. Install a. recessed medicine cabinet above. the sink.. Finish to mach vanity: 11. Install a 24 inch wall rSliinet beside the door and above the sink. Refer to Rehabilitation Specialist fore location. Finish to be white. Cabinet to have hardwood frcc~rit and factor3+ finish: . IS Name: Eliza`Taran Page 9 Address; 2?S. W. ()range fit, City: Hillsborough, N.C: 2778 Phone: ~3~-8543 I?ate: April 15, ~0t38 Bl~DRO(~M # 1 z 1. Prepare the floor for vinyl. Install ~'-~' lauan p1yw4Ad .and a near vinyl Haar.. The vinyl to cost not less-than $1# 00 ~ yard Install a meta stripi at bedroom -door seam. Note:.New vinyl to extend into closet- Install near -wood shoe Tnolding. Prime the shae~ molding: with an ail:. based primer. BEDRt~UiVI ~ Z: 1; Install anew interior bedroom door unit.`Install a priuacy Iockset. Prime the door ucut with a~ oil based primex: Isoor unif to match. . existing doors as close as possible. BEDRDOM # 3 _ 1. Prepz~re the floor for vinyl. Install'la' lauan plywood and a new vinyl floor: The vinyl t~o cast. not less than $;14.00. sq> Yard. Install a metal strip at bedraaaoi door wain ~ot~ Neer vinyl to extend into closet. install. new wood. shoe molding. Prime the shoe molding; with an oil based prime. ~, Install a new interior closet door unit: Install a passage lockse Prime the door unit with an Qi based primer. Door. unit to match existing doors as elos+s as prassible SSE~TR4~K CEILINGS; 1. Prepare the livuig:mom,. ki#ahen and hail ceilings for %:" sheetroel~. Nt~te The-contractor to locate ceding joists and pop caulk lines fur far sheexrock installation. Install sheetrocl~ using 2= Ys' sheetrock screws. Finish sheetroclc smot~t~. Nate: No seams or nails ts~ be visible. ~ - ~. Install 3" wood' crown molding in ~T T. rooms. Note: ~l,lengtlts less than 16' to be installed in one secrian. All: comers and jointsto be'installed by a trained finish caipenter. Fi11 all nafl holes with painters putty: Prime the xiew down irrolding-with an oill~ased primer. _ _ • 16 Natne; Eliza'Torain Page 1Q Address: ?2~ W. Orange St. . pity: ~llsbarough,l~i C, X727 Phone: 732~r~43. Date: ApriX l5, 20Q8 'INTERIQR,.PAITIlYG 1. Remove the v~all ~ap~r from fifie kitchen and hallway. Fr$pare. rho er if necessary wars': for paint. Contractor mar use a paper Stapp 2. Prepare ALL walls, ceilings and trim. including doors; fcir paint Repair all damaged amts in sheetmck. bill all holes fill sheets©ck filler. Saind all rough areas with sand paper and prime. All doors to close and latish before paint. Pa'mt the walls. avid ceiliwg with flat latex paint. Paint all trim and doors with semi gloss latex paint. Note: The bathroom and kitchenwalls and trim t~ be painted with semi-gloss iate~c paint,- Allpaint to coven-completely; TERMITE TREATIVZENT: 1. Provide a teante inspection and treatment #o all foundation wails and pzears:.A Feat ~ontrrol ((111tYaCtC~' must perform this work.: . work is cc~m lets. Al]; spraycng mustbe done after all grade . p Nate: Tlie concrete pofches must be drilled for groper termii treatment. Contractor to pro~rde proof of inspection and treatritent to ReliaUiltat~n Specialist. l1tCISC~LLANE0U8: 1. Install two, twenty four inchevent:wells on-the fzont foundation wall. Refer to Rehabilitatism Specialist-:for Iocaton,;; _ 2. install an enclosed box/chase for the exhaust fan in the latclien: Attach the: framing to the wall and ceiling :Install 2xZ .and 2x4: framing. Install Y~" sheetrock and finish smv+ath. Prime with anew construction. Total t • i• 2? ~r 17 ~~ . 90Q SCE :FEET STREET 2~5~' W. Orange. S#. HiUsborougl, N.~. 27Z~8. ~~~ HOUSING REHA$IL.ITATI{3N PROGRAM SPECIFICATIONS LE~,U li]EI~3ION FOR ~itr~'III$ I~0370 AT 1U~ Starlite Drive,; Carrboro ~~ DATE: s~asros By: Jim Iiutchersc~n . Housing Re~a>~litatio~n Sgecali'sk NOTE TO O(>NTRACTOR CQNTRACTOR SHOULD R~`F~. 'TO THE BA~iC SPECIFICATIONS, PROPERTY ~EHA$II.ITATION ~TAI~IDARDS, GENERAL CQNDITIONS, NORTH. CAROLINA, BU,IL.Z~ING CODES I~IANUAL, AND ORANGE COUNTS' MITIINiLJh~ H~IISING CODE: I~O+Ci.IMENTS LT IS NOT THE INTENT- OF TIDE WRiT~R TO DIRECT ANY COI~TRACTaR TO A SPEOIFI~ SUPPLIER OI MATERIAI.;S CALLED FOR. IIY THIS 'WORK WRiT'E-LIP ()1~I.Y TO SPECIFY ~. TYPE THAT ~V'OULI? BE ACCEPTABLE TO THE H4MEO~i+IER AMID ORANGE CQiJ HOUS]NCir REHABiLTI'ATION PROGRAM. .. _: 1R Name: Viartrina Morrow Page 2 of t~ddress:lCl9 Starlite Drive City: Carrboro done # 96&098 Date: 5/15/08 'This set' of work spieeifit~tot~s ondines work' iteri~ `that wets found ~ contain lead: in concentrations abo!~e acceptable levels- es set in the U. S., Departnaen~ of i=lousing: and I .Development (HI1D)<standards: It is recommendedthat: -any lead hazarii remediation work. be conducted by veers who are certified by the state to',pei~ferm lead aljatext.ent work. Lead hazard re~edxata~n work must be peforihed in cori~rplance with the regatati~ns issued by the Scieretary e~f Housing aad Urban Developmenf set forth in 24 CFR Part 35, et ai and all. applicable rules :and any ntheas issued' thereunder, and: ail applicable Federal, State anti local rules anti regulations, regarding notification, evaluation and reduction of Lead-teased paint hazards in residential. structures tindergouig F~demlty-assisted constivction or rehabilitation and require the elimination.. of tead~liased paint; hazards. Every cnzitractor or subcontractor,, nciutling painting, ,pursuant to which such Ftc~ierall~--~assstt~i canstruttion or Y ... . .. ~ rehab~tation ~s performed; shall include appropriate provisions complying w1~ regents for notification, evaluation and reduction of lead .'based paint hazards. The corttractor shall be allowed to .include' in the cost of the project the allowable.. fee for one (1} complete clearance inspection of the remediatioz~ work, performed. The cost of ally additional clearance; insptachons which: may be ii+ecessat~- will be born directly by the • contractor, Contractor iriust subritit a c+apy of trainia8 certification with their bid. • A%e ?yt~izaa 1~Iorrc~v #+,cldress; lQ9Starlite~Drwe Cy ~arrborc~ P#-one 9Gg-9098 Date: S/1~/{)$ ~../ Page 3 of S r , l~iote: 1'ribr to conducting I,~ad-Based Pint ~bat~ment a~- all per~onnet associated. with the 'pt'fljec# should re+~ev~ and fullq understand the regnirementa of ELI, applic~le loci, sate, and ~e~iernl regalatiuaa #hat may apply to the works; All work is be~ done ie accordsace 'with the lead-based Paint Inspection/Risk Assessment Report conducted by En~+irmiraental Testing 'Setwiees, Inc.-and dated Aprfl Z9, 2~$. I. VVOIZI~SITE PI~PA.RATI4N A. GROUT]D CDNTA~T 1. Before ext+~rloz coYlatruetion, construct a work site periu~eter curb of 2x~ timbers ten ~i 0) feet fivm the house exterior. Create an outer ._ bamer of flags andlor plastu~ tape three (3) -feet on center and twentlr t~b~ feet from the worl~site. Post proper signage in the' work area. All warning signs must renu~ posted until clearance is°passe 2, During; the peria~ci of work on all exterior.. aomponen#s attach one layer of 6-mi1 polyethylene to the building exterior' with forting strips,.. extending the ~lOj feet past the work site. wrap, the plastic under the perimeter ~c4's. Change the plastic dai'1y. $. B: PRE CLF1~T 1. Pre-clean the: urterior of. the unt..ncluding clean and HEP~4 ~vacuuut all: horizwattal surfaces,. fa inciude< oli floors, w~dowaills, troughs,: baseboards and casing. ~ G. CLEARAN~>3 EXANIINATIC?N ~, After completion: of all work that disturbed LBP and any :other lead: hazard reduction ac~vities, a qualified person shall perfi~rm a clearance examination... Lead. remediaton work is not. consdeaed ecimplete until a positive clearance result is achieved, • a~ ~am~ ~~ ~-ra~w rabQe ~ ~f~. • Address: l og ~tarlite Drive City:- C,arrlioro ~'-done'#: 968-098 bate: 5115!08 II. ABA~'~tT 9~ORK.. A. FItQNT PORCH 1, Pmvide temporary support for front porch roof currently supported by one existing motel +colunn. Remove existing column support f'roni fzbnt p+~rcrh. NOT`i~„ After removal work is complete, if further damage is diseo~+ered tho Owner, ContraetUr and Rehabilitation Specialist will meet to review the.. work, determine a course of action and: if necessar~r, a cost for. any addfiionai. work. Supply- .and: install. one :new: pressure treated: ~~ wood column support at. same iQCation, pn~perIy secured d anchored, complete.. I~+taterials to match. . existing as close as practical. ~` S. II~T'I'ERIOR. 1. Remove: existing window mini ~l'mds from Moth windows in Bedroom #3, surfaces intact and ready leave remaining exposed wall and window. opening.:. • for insiail~on o~new windows. Olean all wsndnw sills in aI1 momsr TOTAL PRIDE C7 ...T._ aa~s ---- k.~.._ _... 1g,g ~"1') 12''1 g'~`_ . ~: g~3 ___ ~ _ _ 4~a 4`1 <4~2 ~'1~8 1,9 7.8 3,g 4~4 4.2 -- --- -~ 4n ~. c~v _ -,r--- `CV. ~~ ~, ~. N :~ rr ~. N C~: ~. 30`71. g+~ _...~.~_ g~3 4~'3 _~': LIVING AREA. 1191.sq ft Not to Scale • • t.. '~ P' u~ &~ OR;AI~+GE CO~.~JTY ` i3(~lUSiIYG I~HAB~LTTATIZ~N ~'RQ~rB~-IVI SP-ECIFi~G~TIflNS Ci>NERAL C~NSTRX7CTION FOR.. M~orrov~ AT 109 Starlite 1~rve, Carrbc~ra .DATE: S1i38 • a3 B~-: Jim ~Iut~erson Housing Rehabilitation Specialist NOTE. TO ~O"NTRACTQl r~ V ~.._, ~~' Pa~~e 2 iii 1 1. Chemically treat entire .:perimeter -of house: for termite and pest control. Cletnical nY to be done ~ a licensed termite or pest control company.. Contractor' to provide owner with written proof and v~Y of treatinen B. RQt)F & E'rUTI~IL .. x . 1. Remove existing comptisrtion shingle roof cover to sheathing. N~TEi . existing roof cover is removed,. if "further. damage is discovered the Owner, Contractor and: Rehabilitation Specialist will meet to revie~vv the work, determine a course ,of aetivn and, if necessary, a cost for any additional work: Supply and install new shingle-style ridge vent.. Replace metal rosin vent boots, metal dri flaslnng including all step flashing, g, p edge, etc.. All vents, flashing, and other:metal siufaces m blend with color of .roof.. Sea]. all pet-etrations through roof with waterproof material. Supply and install new a5 year minimum) composition shingle roof cover over I5# felt on house; complete; Style and color to be per Owner selectiont Includes remove and' dispose of TV antenna.. {ontractor to snppIy owner with writte~a. warranty for materials ,and Iabar. All v~+ork' to :code. - 2. Remove. existing gu#ters and downspouts. Supply and install new seamless white pre-paiute+d metal Ogee: style gut#ers on house and- storage room with at least oric .downspout for each gutter and one downspout° for. every 30' of gutter: Supply and install new gutter guatda ari all :gutters. Eatch grade level. downspout shall have a splash block.. to divot: water away -from horse. ~. C, PLI~MBING 1. Remove two (~) taped damaged sections of water. line inside I~ttchen; Base cabinet to le#t of sink. cabinet. Supply anti install new piping and proper' fittings to restore. to proper working order. Seal plumbing penetratioffi .inside. Kitchen cabinet. Remove: taped damaged section of drain line under kitchen sink. Supply and install new draut line aiod proper':fith'ngs to restore. try proper working order. 2, Supply aid. install new• anti;sphon device on _ right: side exterior hose faucet, complete. :vame ~Zartrina i~rlorrow • address lfl9 Starlite 1?rive City: Carrbort r_ Phone #: 96~--9Q98. ~~ :Page 3 of 1? Bates 5/15~t)8 `3: Removeexisting, sink and faucet from large vanit3+ including sink drain tali piece: Supply aiid install new white porcelain fuish sink, sink drain ~, Remove +existr~g sink and faucet.; from small vanity, Suppig and install new white porcelain-finish sink, faucet and new hot water riser line and restore tcs prober working order, complete, ~$ 6, Re-secure existing toilet to floor. Replace flow valve and flushing mechanism on toilet.and.restore to proper .working order, complete:. ~. D, ELECTRICAL; 1, Separate and add circuits tc~ alleviax~ overloaded circuits. HVAG,; i refrigertttur, microwave and -washing machine to fie each on s+~arate circuits. Includes new electrical to accommodate AIC condenser urrit located on right exterior of hQUSe:.Properl~t abandon and remove existing exposed wire rannng'fron~r stlipari'el to Dining area and remove associated: s~utet in Dining area,. Includes verify existing GFI Circuits and cutlets tip Kitchen and Bathroom. Includes verify two ~~) "direct-wired" smoke detectors in Halt. Includes install cover Manic on exposed breaker opening: on subpanel: All circuits to be clearlq identified on subpaael. ail work to code, 2 Replace four (4} damaged outlets in Dining Axes, two ~2) t~utlets on '. wall of Living Room; and one: (1) outlet in Hall and restore to pmper working order, Replace all switch and outlet cover plates;. approximatel~- forty (~Q) pieces, and restore to proper working ordea~. 3. Supply and install new' GFI outlet in Laundry. closet for laundry ~ipm '~. SuPP1Y aad install never arc fault iritenupter circuits on l3e~droorn circuits • ~ Name Nfartr..iVi4rrow address: t09 Starlite Drive City: EarrbQro, 3.. Phone #: 9~g~3+~8 Page ~F of 12 ~-/ Date:: 5~1 ~f08 ~. I~e~ove t~vo combination; wail lghtfinedcine cabinets above each :sink. in $adlroonx. R.epait wall. area; above a sic to accommodate installaxic~n q£ one new wall-mounted Light fixture and new. separate surl~aee mounted medicine cabinet centered over each sink. Supply and install one new wail mounted light fixture aver each sink and ~~ medicine cabinet, anal: connected to switches at existing rations, complete 5. 5uppl~r and install new ceiling light fiictnm in tub/shower room connected to switch ~at existing location. l~secime existing ceiling light/fen combo .fixtures in each of tl~ (3) Bedroom. lteglace missing. globe on :Hall: .ceiling l:gizt fixture. ~nPPl3':aitd install new ceiling light fide in; exterior Storage Ranm caz~nected tc~ switch at existing. location, Restore all to pl~3per''WOrlCill~, order, complete. ~: 7. Remo~re: six (6j existing ceiling light fixtures in Laundry closet,. large Hall elaset, and. three Bedroom closets.. Repair existing: electrical to accommodate: installation -of new fluorescent fixtures at game locations;: Supply and install el~trical 'to accommodate Dire new-wall, .switch,: inside large halt closet tq opeiraLC two new fixtures. in the closet: Supply .and: install say (~ new fluorescent ceiling light fixtures with protective covers at same locations. Laundry and Bedroom closet foctur`es to be connected: to switch at e:~i:~tirig locations: Hall closet fixtures to: be connected to -new s~vtth in closet. $. Supply and install nev-+ eleetric~I to accommodate installations of new "direct-weed" strioke deters in each oaf tl Bedrooitns. supply and stall new "direct-wire'" striai~e detectors, e4tnplete. 4. Supply and install new electrical. in tula/sl~sower room to accommodate installation of new ceiling: mounted exhaust fan vented m exterior. Supply and install new tnaistt~l'e-ra"tell eachaust fan,: et~mpiete. Separate fan switch to be Iocated adjacent to celingLight .switch. 10, Replace doorbell. button and restore doorbell:to proper. working order. 1 i, Remove existing front porch light fixture and remove existing rear `exterior motion detector light, fixture adjacent to .rear dQOr. Repair electrical to. .accommodate'. ailatan oli~ o+ae new single light motion detector l~tt fixtiire fur l~n porch: and one new double light motion detector light • • I~ISinC: ~T'tr1nA. A/IOTIOW ~~ddress: !09 Star3te Drive: City; C$ulioro -~t Phone ~: 968-9(f98 Date: 51.1~~8 .t.: ~µ.:s.. ,..+y ~~r Page ~ of 1 ~' 0~7 fixture adjat to rear. door. Supply ,and install ~w electrical tt~; accommodate installation of -one new exterior double light motion detecmr. Tight fixture oit right rear ct~mer of'~ .use and controlled withexstng rear door light switch. Supply and install: orie new single light motion detector light fiictuco for froirt ;parch, one new double light motaa detector light. fxtuue adjacent ~ rear= door,- `and one: new doable light motion detector'. light fi~cturc cin right rear comer a~ house, complete. All work to code.: `E. lvlECHAI~IT~AI 1.' Provide service acid repair of existing furnace ;unit to maintain proper woirlQng order sad aecamniodate installation, of new split system air conditioning urit:. Supply and install new split system air conditioning system, including new condenser Located at exterior, eondensaxe lines, t`hermastat complete: `Includes cleaning existing coil. All: work to aide:. ~' • ~, Replace ten (10) ceiling-mounted heater registers with new white pre finished beater registers of same -size and at same locations, complete. Includes sealing, duct boots where fihey penetrate the ceiling. 1<; IN~LJLA'TIt)N & WE~THERIZATTN .. 1, Supply and insta1161t~wn=in nsulaticm to achieve R 3d value `in entire attic of house, complete; Includes ;suppl~- and install baffles: at snfft vents to: pro~+ide proper air flow betweesi attic :acid vented saffiits. C'i. EX'1'Elt{3R I~OQRS 1. Rettiove existing finnt screen door; Remo~+e existing front door and door flame andprepane opening far installation a~fnew pre-hung exterior door:: Supply and install new pipe=hung white .:pre-primed, solid wood core, 6, panel metal insula#~ed exterior door, with aluminutlt threshold and.: weatherstripping,; ono wndc>ws~. Includes all hardwares levex~tyle keyed: lockset, deadbolt grid peepho%, corziplete: Where e~cterior woad frame, trim .mod sill are exgoaed, supply and insEall pia.-finished -white aluminum coil stock to coven exposed woad components, including wood spacers ozt existing campan+~nts to create. unifdrm surfaces: AU Bends 'and folds of coil.. stock #~ be: done with mictal brake equiptuent and exposed fin. fished edges m tie hemmed. lneludes replace interior trim to match existing; as close as pfactcal. Includes supply° and install new exterior latex enamel semi gloss paint. finish on door:... $~ i~lame: I4Iar6~na 3vlorrovw Page 5 of 12 ~ o~ o/ 55: ifl4 Starlite DY3S-E. '•-J' {;ltd!;` ~arr~o i~atet 5/15/8; ~. Supply and.:dtstall new ~rhite vinyl-clad storm doer on ilie front door, with.. alass/screen: coinbc~, including pneumatic closure -:and security leek; 3. Remmve existing rear screen: door. Remove. exsting° rear door. and door: fia~ne and prepare opening for installation of new pz+~-hungg exterior: door; Suppip and install new pTe-hung wIute pre-p~merl, salid wed core,. 6- 'panel metal insulated. exteriors diQOr, with aluminium threshold: and ePp (no windows). Includes all hardware; lever-st~rl+e keyed lockset, deadboit and peephole, complete: 'Where. exberiar wand frame, tri3n and sill are exposed, simply and install pre-finished white aluminum.. ct~il stack to cover exposer'wood components, including wood spacers an. existing: components `to create unifoim suc€aaces Ail :Vends and folds of coil stack to be done with, metal brake equipment and exposed finished edges to be hemmed.. Includes replace interior trim to match existing as close as practical.- Includes supply .and install new ,exterior latex etlarnei semi-gloss paint:: finish vn door. $, 4. Supply artd install. new white; vinyl-clad storm door on the rear door, with, giass/screen combo, including pneumatic closure and security lock.: ~. R;emo~re existig Storage Room door and.doar frame: Prepae opening for installation of :new pre-hang exterior doer Supply 'and install never pre'- hung white pre.: pain#ed, #Tat panel: metal insulated exterior doar with aluminum tll~eshold and weatherstripping: Includes all hardware, and keyed deadbolt eamplete. Where exterior wood frame, trim- and sill are exposed; supply and install. pre=finished white aluminum ecail stock to cover exposed wood components, including: wobtl spacers. on existing components to create unifsirm ~rfaces; Includes supply and install new • exterior latex enamel semi-glass ~raint f Wish on door. H. E~'I'BRIOR WINDOW'S. 1. Remove fourteen (14j ~ existing windows and: names m acccmnnodate installation af' new vinyl new construction windows: Remove existing interior window casing, stool; and trim..: Supply and install new double- hung, daai-pane vinyl: new construction windows with backs. and felt screens. New windows to ,have. erior trim and J-channel to. Integra' with new vinyl: siding. Suppler and install interior wood casing, stool and trim on each ~-'uid©vv opening, caulked and sealed. to interior of new windov~r: Sizes to match ...existing as close as is practical. • l~Tame 1Vlartrna ~or~ow • Address; 109 StarLte Drive - City Carrboro - s= Phone #; 968-4U98 Dates ~!1 ~I08~ L EXTERIOR SiDA*TCi AND `T'RIM ' -:+•" ten" ~-` ~Y . ~ Page ~ of l~ 02~ 1. Remove appmXmately 94 lineal feet of damaged bottom sidir3g board on the front wall,. rght'side walls, and rear walls and replace with pressure. treated wood. material, to provide substrate for new fan-~qld insulation and vinyl siding Remove approximatel~- three square. feet of `damaged siding.. adjacent. to top of rear Bedroom window azird replace with wood to Provide substrate fo new fan-fold insuiatian and. vinyl siding. Remove appmxmately six. square feet of siding: and substrate from rear wall. to. provide access to attic. to remove al~doned I~VAC unit. Remove abandoned HVA~ unit form attic: Repaid epening. to provide. substrate for new fan :fold insulation and vinyl siding, Remove existing wall-mounted. A/C unit 'in Dining area. Repair'waU'.framing anti interior sheetmck'ta' match existing as close as practical and'to provide substrate for new fan- fold.insulation and vinyl siding. 2. ;dean.. existing vented soffit' screens 'to restore to proper working arder~. Clean :and properly prep existing soffits, roof t~verhangs, fascia and rake. trim to: accommodate installation of nevr pre=finished. white aluminum -co~1 stock. Supply :and install. new ~~ pressure treated wood overlay on t existing rakd trim to accommodate installation of new aluminum coil stock: and new vinyl :siding:: I~laintan existing exposed vented soffit screens and supply :and install. navy pre-finished white aluminum:: coil stock to cover re~naipirg exposed wood components of soffit; supply aril install pre- :.. fnushed white aluminum coil stock an existing' fascia, on rake trim overlay` and on roof overizangs. Includes wood spacers on existing eomlxments to create uniform finished surfaces. All bends and folds of ~e4 stuck to be . done. with metal brake: equipment and exposed finished edges to be hemmed. All wcirk cotuplete: 3. Fully prepare existing siding on exterior of house tc~ ,a~ccommcxlate. installation of new fan-fold insulation and new vinyl siding. Fully prepare: existing front pc~mh soffit to accommodate installation of new-vinyl sofl'itt: Supply and install new fait: fold :insulation and navy vinyl. siding over existing siding„ and new vinyl .soffit over existing: -'front porch soffit,. including all necessary.transtons, mounting blcsrks for exterior fixtures,.. j- cltanael, and trim, complete: Includes; remove existing; shutters and supply and install two (2~ new vinyl shutters on Kitchen wuidow and two. ~~~ new vinyl :shutters: on front Bedioom window, complete. Color and: style per Owner selection. Existing phone and cable tines to remain accessible. Page $ of l? ~ ~~ i'`lame; ~ Morrow Address; ()~ Stariite Drive City: Carrboro •~~ Phone #: 968-9{l98 Date: 5!1 S/68' 1. Remove. existing inferior closet 11i-fold dflors and hardware an lar Hall closet and: Bedroom #2 closet. Remove re~naL-~~ bf-fold door ha:~dvvarte lit Laundry closet and Seem #~ closet.- Repair existing, door ~oper iri these locations to :accommodate installation of 'new closet doors: Supply and • install new frpanel hi-fold closet doors oriel, hardware. in l.:a.~lndry :closet, Bedroom :#Z closet, and Bedmom #~ closet, including doorlmobs, complete, Supply and install new 6-panel sliding closet idoors and l~aidv~are is large Hall closet, complete: Repair existing closet bi-fold.. .: doors in Bedroom #1 to restore to proper working- order. ~. Remove nine (9) existing; Interior passage doorknob sets. Repair existing. doors and door frames to accommodate installation of new passage doorknob sets. Supply and install.. nine (9j nevi brass firiash lever=style interior passage door locksets; at sortie locations, complete. I.ocatians are Entry closet, .small Mall closet; Bedroom #l door,. font {~} Bathroom doors, Bedroom #2 door,. and Bedroom #3 door.., Supple and install baseboard-mounted door'bumpers° for fi~ont door; Bedroom #l door: tluee Batlnvom doors, Bedroom #2 doaiT and Bedroom.#3 door: $: l~. P~iTERIOI~ FAINT 1 Fully prepare interior: pairf~d :surfaces to rreceive new paint: Includes patch and repair: of. sheetrock holes and surface cracks, sand.. and prep. interior: doois, anal prairie all new or "rnw" Yna#erials. Includes repair: of sheetrock ori;Entry walls edjacent to ant door and I~ini~ng area, renraova wallpaper residue on Hall wall and small. Bathroom vanity room, and prep and seal stained areas on ceilings in Living Room, Bedroom #l, Bedroom #2 closet and Bedroom #3. Paint walls and ceilings an Entry; Dining,. Living Room, Hail, and throe Bedrooms with inleriar flat. latex finish paint and restore to .., P~P~' worlang order Paint: wa11s and ceilings itt K,~tehen, Laundry closet, and three roc~~s of Bathroom and with in~teitiot latex enamel ~-gloss finish. paint. Paint '.trim; casing;.. baseboard, shoe mold and doors with interior latex enamel semi-gloss. finish paint.. Painf~ -used: in Kitchen,. Bathroom and .atmdrY closet ta' include a mildicide additive.. Restore painted surfaces: tcs proper working; order. Does not include painting or staining loan paneling. Does; Writ include painting inside Entry closet,.. Hall closets and Bedroom closets. ~Tew i~aaterials to match ~cistirig as close as practical: Protect personal possessaox~: wxh appropriate temporar~r coverings and enclosures. Ci~lor per Owner selection. Name: .~rartrina Morrow Page ~ of • address; l Q9 Starlite Drirrc Carrbaro :~~ Phone #: 36&038 Date: SYl5fQ8 ~. l~LOOK +COi~E l.. Remove existuig vinyl floor cover in Entry, entry closet, I~aundty close,, Kitchen, Dining, Hall, two -lail closets :and three roans: of Bathroom to. expc3se concrete floor slab.. ~temove baseboard.: and shoe- mold in E~'3!` and right .side wall in Dining. Remove :shoe mold in sil three moms of Batlrnom. Prepare existing slab and baseboard:-for .smooth uistallation of nevv vinyl $oor cover: Supply and install ae~v painted 'wood baseboard.: -where existing. was- removed including. replace missing baseboard in I,atamdry closet. Supply and instalk new vinyl floor cover 'per Owner selection, new painted shoe mold where exsting;was removed or missir-g new stained shoe mold in Kitchen, and.- revsr metal transition strips, coiupiete. New materials to match existing as clt~se as practical.. $' 2; Remove existing; carpet anti. pad to expose concrete :floor siali in three Bedrooms including Bedroom closets: Prepare existing slab and.. baseboard. for smooth installation of new wail-to-wail pad and carpet: Supply and ir-stall new pad and t;arrpet per t~wner ;selection at same. locations; including inside Bedroom closets, complete. New materials to match existing as close as practical. • Ivi GENERAL REPAIRS . 1. Supply .and. install new address numbers on'exterior of house near front: door and visible fronn `the street; $~. 2: Supply and install new 2X1 ~ wcivd framing #n create a "dam" in a#ic ar©und attic stair opening m contain insulation. Repair disappearing. stairs to close properly and re-se+~ure insulation. panel hn stairs. N. SITE IMPR.4VEIVIENTS 1. Re-grade mil on -right- :side of house i© slope away fxom house approximately $ .feet and to slope tovvand front of property. Ii} INTERIOR ~Ql A. KTTGfIEN . 1, Protect existing cabinets; co~tertops and `apPlanc~s from dust and debris:. Reinnve trim from old- ceiling repair. .Prepare ceiling to accommodate sheetrock overlay including adjust existing, electrical, ceiling lightffaA fixture H'S~A~ regstier to new ;ceiling level Suppl~- and install. new ~" moisture resistant sheetrock and taping to blend: and match existing: • and have smooth tr~sition tci existing walls.: Supply and install new 31 _.~ ... I~Tarrie. tYlartrina~ 1V.lorrow Page '1"i~ of l ~ ~~' Address:. i ~9 Starlite Drive `~-/ Ci~r Carrboro ~~ Phone ~z 968-9098 Date; ~Jl ~/fl$ paint grade wood- crown: mold. on ceilinglwall. joints,:. sealed. and baelcprimed. ~upplY and install' new... stained wocid crown mold on eelingfyvall cabinet joints. 2. Remove, clean. and`zepaix existing bt~se cabinet doors;: grid clean sod repair: associated cabinet frames, Replace existing floor inside sink. base cabine# Replace base cabinet door hinges to match: existing as eloso as practical.. Replace all base and wall cabinet door and drawer handles and install door closure clips. Re-install exastirig cabirict doom. dean ana re-caulk countectoplwall joints with smooth uniform finiish. New color to matel Ming as close as practical;; All work complete:: $_ B. DINING AREA 1. Remove whole houses fan.. Install Fratiriing and sheetrock to 'repair remaining opening to match adjacent ceiling: including ta~ie and. blend. sheetrock, Textpte repair surface to snatch adjacent ceiling texture. New materials to match exstinsg.as close-as practical. ~. Remove triers on Ktchet!/Dining pass-through opening: Re-secare. existing wall ,paneling in Dining Area. supply and 'install. new trim on. pass-thmugh.opening, new outside corner trim and new inside corner trim: and.restore paneling to proper worleing,nrder: ~. BA'THI~.OQIvi 1, Protect. existing cabinets,, counterta~ps and fixture from dust and debris:. Prepare. ceilings in three rooms of Bathroom to accommodate sheetrock overlay .including remove existing ceiling light fixture-and adjust existing el+sctrcal and I~AG register to new ceilirig.leveL Supply and install nevtr "moisture resistant'. sheetrock and taping to blend and. match existing and nave smooth transition to existing wails. Supply and install new paint-grade v~ac~d crovim mold oa eeilinglwall joints, sealedd and backprimed. All new materials,;, 'finish surfaces and finishes. to -match existing as close as practical.. . $ 2. Prroperly repair,. clean. and. prep existing fiberglass tub/shower -unit- .for resurfacing, Properly resurface existing tublst~ower. rout nth smooth, unitnrm finish bonded m existing unit.: New- color to match existing; as close as practeaL $~ • ~f.+,wl, f .tY .. ~ ~~. • Name ~aa Morrow, Adm. 1 ~9 Starlite Drive.. City; Cartboro ~- Phone # 9t58-998 Dater Jll Sf88 ~. Remove,: clean- and repair existing repair associstet caliinet fraine~ match existing as close as, practical. ~a~ l I of l2; ~~'~ ) Vanity Cablllet dOars, clean alld Replace base cabinet door.es to Replace alI cabinet door aad drawer handles and install door closure clips.. Re-install existing cabinet d©ors. Clean and re~.ulh countertop/wail joints. with. smooth unf©rw finish. New color t4 march e~sting' as close as pracxical_ Supply sod install. enclosed cabinet'shelviag inside right side of small' vanity cabinet, stained.: and.. finished to matcli:existing cabinet'as close as practical, and accessible through:. right'sde vanity door Ali vv©rk complete. 3. Remove existing"toiletgaper holder and repair exposed: wall areas. Supply and:... install new toilet paper holder, fihree (3), towel bars, and. one; ne~v surface-mounted three-door medicine cabinet over each vanity centered over each sink. Supply and 'instalt three new metal grab bars. with one: grab bar at-each end of tui3Jshower and one grab bat on left side of fiAilet all properly anchored in, solid substrate. Locations tti be designated by owner as close as groper anchoring will allow. $; • TOTAL PRICE 4 F ~~ ~~ ~' ~~ O ~ ~~, ~~ ~5 ' ;~ .,~~ ~~,• . . ~: :~: `. , ,. E~~ /~ • • ORANGE COUNTY HOUSII~TG RF.~T/~RIIITATIflAT PI~pGRAM` SPECIFICATIONS `FOR DOROT BALD'WIN AT 1.709 RUSCH'_RD. PHONE:.~5~;1~ 967 23t5Q UlITE: Janua~y2 ~UffB BY: David Saconn Rehab Sp~ialisf' NOTE T© CONTRACTOR CQNTItACTOR 'SIIOULD REFER Tla TIDE BASIC SPEC~ICATIONS,; PROPERTY REHABILITATIOI~d STANDARDS, I3ENERAL GONDITIOATS NORTH CAROLIl+dA BITILDING CODES MANUAY~, AND oRANGE Coc~NTY 1~iII~TI1viTrM xQVSIIdG CQDE DC~CU:I~ENTS. IT IS~NOT'THE INTENT OF THE ~VRTTTER TQ DIRECT ANY CONTRACTOR TO A SPECIFIC. SLIPPLIEI~t OF' MATERIALS CALLED. FOR IN TITS W1pRK WRITE-UP ONLY TO SPECIFY` A TYPE THAT WC3ULD BE ACIEPTABLE TQ THE HQMEOWI~ER AND ORANGE COUN~`~' Hf)L,ISIlrTG REHABILITATION PROGRAM. _. C7 3~ ATanle; ]~orvthy Baldwin. Addr~ess:1'7os Rusch Rd>. City: ~ Hil1, N.C: 2`1516 Phone: 967:~36A Date: January ~, 29U8 .............. EXTERIOR` 1. intact, art. Asbestos R~tnoval Compahy to: rertwve the asbestos siding, front: both sides of the unit. ~ 432 sq ~j. Asbestos Contractor to properly dispose of the asbestos at an; approved landfill br site. Asbestos contractor to provide VSTaste Shipment ~,ecord of disposal:.. 2. Reiriove ttie masonite siding and trim from the front and back of the unit. ltetriove all exposed nails and prepare walls for vinyl siding: 3. Remove all existing lx8 fascia and saint around the uni#. Install new lx$ fascia. New trim to'be # 1 grade yellow pine, cedar or fur Prime the new trim with an oil based: prier: Install new trim:wth galvanized nails. 4. Prepare the over Bangs far vinyl soffit Install aril necessary framing tQ secure all soffitand J-chanieL 5~ Prepare the e~cter"tor walls and boning; for vinyl siding and . aluminum. trim. Install double five (I~.-S~ vinyl siding and €an fold insulatiod on the exterior walls. Install white alumihuni coil stock on the fascia acid vended 'vinnyl soffit on the over-hangs; Install ail. necessary tritri, J-chatxnel,flaslung anc~, starker etc. Re£er t4 plan for fascia trun hover the front at~d back doorframes with aluminum coil stock. NOTEi All trim to be properly installed. Install proper trimllight facture boxes ~ vinyl :) for all enterior fixtures. Niue: Ttefei` to general Specificatians.foc Rehabilitation for vinyl: siding and aluminum :true. 6. Install a new pressure treated rxawlspace door and frame: Install a ~x4 frame acid ~{' plywood door Install doorstop, galvan~ed.-1}inges attd locking hasp. l~ew 'doter to ogee, close: and Iatch properly. '~. Install st new 36 inch; 6~ane1 metal insulated door unit an the front. Install a keyed IocitseJ and deadbolt keyed alike: New door to ePen close and lock properly. Install new thatching casing on the,. interior. Prune the casi~ with an oil passed: primer. • • 3~ DTairie. Dorothy Baldwin Page 2 ~dd~ss: r~c~ R,~hga: qty ~hapel.I~ill, N.G: 2~fi1Cr Phonies ~7-2~b(~ .Date:: January Z, ZOOS .EXTERIOR: 8. Install a new 3b nch,.vyhite aluminum stoan door. Storm door to he full.. view:. Storms door to be .complete-with Iever handle, screen, closer and vinyl sweep, Note: New storm door 1z~ open, Nose lock properly.. New stem-doortabs afpremium qualit3c Install Larsa'n argre-approved equal. a~~» i. Re-frame #e wiiiidow openings in all;bed~ooms to receive a 3~" x ~4" windo~e;. (Egress Code) Note: The " ` g headers to remain.. Re-frame a fetal a~sa7t (6) window openings. 2 Install nevK donbie-hung vinyl c©nshuction windows with nailing flange. Sates . 7- 32" x `54 ; 2- 3~"x..38", 2- ~(1" ~c 54" and one picture windovi-,;48" x 5:~4". lris~li a t~tal.af elsyeu (11) ~+ndovYS and gone (1~ picture wiriclaw: Install jamb extensions, new matcl~ing.casing, window stool and,apmn. Prime, all new trim-with an oil based 1~' Paint new trim with semi-glass latex paint. All paynt to co~+er coaupletely. 3, Reinstall all existing vinyl shutters. GUTTEi~S1DRt~INTILE. 1,. Install white 1lumn„r-; gutters an+cl' Q~er-siz+e~l. dc~wns~outs oni all fascias including°the back parch, l~l'e~- gnttets to be seamless; Install solid draintile to-all downspouts. The drain ails on the drive- wa~± side shall teiYninate not less than 1(1 feet from the foundation. NOTE; Contractor to consult with Rehabilitation Specialist about lcscation of downspouts. ~. Install aluminum gutters guards on aU gut6ers. Note: Gutter guards to be installed prs~periy. • I+I'ame;Dornth~ Baldwin Page 3 Ands: 1749 Busch Rd. pity: chapel , N C. 2'1316 P1mne: 967-2360 Date: 7anuarSr 3, ~Oi~B FQUND~lTi4N'4~V©RK 1. Apply a fiber-bonding fo~mdation~ coating tv ,all exterior-black ~w~lls. Homeowner to choose° white car gray color: Fill all large cracks with masom~r filer before appl3-ing fiber stucco to walls. Apply a. minimum. of two (~) coats. Stucco tc> cover `ompletely. .;:the foundationwall shall be' Note: A11 cracks teat extend through coated on`both~sides of'the foundation wall.'The coating;shall extend , a mriianu~ri of ~4" past b©th sides of crack. (; Oft section) 2. Place tvvo (~) tandem loads (~4 yids) of soil around the foundation.. Refer to Rehabilitation Specialist for location-Driveway side, fiant, left front side: Slope st~il awa~- from unit and level. smo©th. Install pine needles along the front. Seed and straw all exposed:. soil, fine needles td cover completely. 3. Install two {2) large vent wells on the driveway side. Attach the vent v~-ells to the fourida#ionwith masonry screws. 4. Carefully°rmove the existing.. foundation vents. Install automatic foundation. vents around the unit. Notes Install foundation-vents .. _:. . before thefctundaton'coating is applied. 5. Install drams file cn the right foundation wall, (Driveway side Dig to th,~ footing or ~e bvt#om of tfie block foundation: Ditch to be a minimum of ~4"wide. Apply u?vo coats of fou~datton water proof ng, stone, ~ndscape fabric or drain the sock. l+Iote The drain file shall be solid pipe w)eu itteaches the oorner. The gutter d4'wnspout may connect to drain file and discharge `in front yard, ELECTRICAL: 1. Rewire th~e'liouseto code., Install a 2U() ainp'service panel, meter bash, GFI receptacles, arc-fault breakers, hard.-wired smoke detectors. Install: near switches;, receptacles and pla1~ covers. Note; All work to meet the current Eieetrical Code. Note: Remove all accessible-old wine. • • Name:. Dthy Bgidwin address' i~QQ Busch Rd. pity: Gtiapel Ffil1,:.N.C. ~751.b. Phflne: 9b'1-~3b+ Dater January 2; 200$ ELECTRICAL': 2, Install underground electric service tc~ the unit: Contract with Dube Power ~ set new pole in front right ccamer and install undergruun, d service. Psge 4 No#e: Be~or~ digging cont$~t L-~Q(1-63~-4949 tai. hive #ite property located. After nspectir~n backfill ditch and seed and straw area. 3. - install t~v© (2, service lights. in the crawlspaee.'The light fixtures tca be spaced` to larovide adequate light in the crawlspace. The light fixtures to be controlled by a switch within 3 feet of the crawispace door opening. t 4. Install nev~c interior and exterior light fixtures. Install new ceiling light. fixtures. in the living room, kitchen, hall, bathroom and center front bedz~am. Note: The light fixture allowance is $' ~5.©D peer fixture., Install. a total; of sevetr(7) light fixtures Make all electrical connections. S. Install a ~ctambiriatitixi ceilmg fan witit;light kit iii both the frant'.left and .. rear left bedroQins. Install a 42" ceiling fain; The ceiling-fan allowance is: 75,1)0 per fixture. Make a~. electrical connections; The fans to be cnntroiled by a wall. switch. Note" Owner to choose finish- white or star fail blades. fi; Install a cpmbinatiou exhaust fanflght on a bathroom ceiling,. Ttie bathroom: exhaust fanlight to beat 1e~st 5U cfm. The fixture to be controlled by a wall switch. Vent the exhaust to outsvde air. Work to pass inspectiod. 7. Install a unity light fixture ~abctve the medicine cabinef. the fixture to be controlled by a wall switch The lightfixture allowance is $ 25.D4, 'Make all electrical connections. 8. Install a light fixture ovei the kitchen sink.. Install a new circuit and fixture. The light fixture to be controlled. by a wall svrritch with two feet. of the sink. The. fixture allovvarice is $ 2~b0. Note: The new light fixture to provide light down Toward sink area: 9. Removeold riser from'roof andpatch with match"utg shingles. Name: Dorothy )~aldwin Address; 1709 Rusch Kd: City: C~apel,H11, N C. 27511: Phoae• 967-2~6t? Date: Januarp 3; 208 Page 5 • PLUMBI~I~t 1. Retrtave all accessible iron drain lines, from th+e unit. Install: schedule 4fl PVC drain lines to code: Install all new vents and cleanaut cade.'Install a cleanaut wthnt 3feet ofthe: foundation wau, Nate: ;Plumbing consists of one bathroom, washing. machine bob and kitchen sink:: 2: Remove all existing water supply lines and'threaded nipples to fixtures.. Install new copper;or pex supply lines, cut-offs and PT~C drain lines rto all fuctux~:s. 3 Reinstall the wall mount sink and install a new single lever faucet. The new faucet: tea be a Delta orpre-approved equal. Install a new PVC drainline! assembly/p trap, R+Iake all plumbing connectians: ~: Install a new Handicap conunode. The commode s~:all be a Kohler,; Crane,, Americaa Standard arprc-approved equal. Install a new wax seal. and commode balls: Make all plumbing connections: 5. Install a new tali. with slip resistant bottom.: The tub sHall be a one piece seamless steel with porcelain enamel Knish. Install a new trip-level, drain lineJp-trap cotmection. 6 Install a combination tab/shower single lever faucet valve: THe faucet to lie a Delta or pre`appr©ved equal. 7. Install ahand-held shower with two wall clips. Install one clip at regular shower Height and the ether approximately 4fl" from the -tub bo~onni. $. Install solid PAC wall panels in the shower:.. Properly secure the panels to the shower walls: Caulk all corners with 1fl0' silicone caulk: The walls to be water tight. Caulk wall panels at tub lip: 9. Install a rie?w ~asHing machine box in the latchen. Iviake ail supply lute Sad drain line connections: to cede. lfl.: Install a new single lever faucet with sprayer an the kitchen sink:: Tlie faucet to be a Delta:orpre-approved erlual. • • 4i Name: Dorothy Baid~vin Page Address.17U9 .Kirsch td. City: Chapel Hill, N C, 2'716 Phone: 9b~~33dQ Date.; January 2, ZUt18 P~;i11VIBTNG 1 l,. Install an expansion tanl~-,for the water heatex-per cade, 2. Install a water gressut~e reducing xalue or regulator on the supply .:line peer code. 13, Install amain water shutoffvaT~e.withn 3 feet of the cravvlspace door opening: 14 Install pipe insulation on all supply lines in th+e crawlspace. Notes Insulatigrt to be properly. installed. X11 z~ernera to be cut of ~5e~o angle and shall fit properly. MECHANICi~L `l . Remove all supply>ductwork to- the main trunk line.. Install insulate flee duct m .all rooms: Contractor to apply mastic at ail connection. s to seal ductwork properly. ll~iechanical contractor to support and strap all ductwork per mechanical code. Nvte: New duetw©rk.to be inspected by Chapel Hdl Irispectbn Dept. 2~ T,Tsing proper duct tape, rae-tape a;Ii exisfing duct insulation can the trunk line: ,Apply mastic. to ail joints to proper seal ductwork. INSUI.~TION': 1. Replace approximately two (2) rolls o~ R:19 faced insulation in the cragrlspace. Secure,all loose insulation with extra tiger teeth. 2, Install,R 1~ insulation in the exterior wall o~:the bathrooms, 3. Add blvvvn insulation in-the attic to achieve: an R 3$ rating. Insulation canhaet©r fo prv~de paperv~-ork of R-~raiue and number of bags insulation for the .insulation inspection.: Install ins~ation baffles per code;; • Natie: l~oroth~r Baldwin Page ~~a. ~~i~ Busch R~,, city: Chapel »u, rt.~. 27515 Phone: = x35o Date: January 2 21108 KITCHEN / HAI~LW:i~Y 1: Repair the gagging ceiling tiles on the kitchen ceiling. Lase 1 ~1.~" screws with one inch fender washers to screw tiles back to firing. Remove bed molding in kitchen and hallway: Locate framing on entire ceiling/ Using achalk-box pop lines across roozri for she~roc>s installation. 2. Install y ' sheetrock on the kitchen and hall ceiling Finish sheetmck smooth. Note:- Refer the :Rehabilitation Specifications for new sheetrock installation, I.'rime'the ceiling with a new construction primer: 3. Remove the base cabinets, counter fvp and wall cabinets in the kitchen. 4. remove the top layer +~f vinyl flooring and sub-#loor in fil~~e kitchen. Note: Rehalnlitation Specialist to inspect floor at kitchen. sink area. If fuifiher damaged e~cists in this 1s~eation; the Cantracfor, Owner and' Rehabilitation Specialistwilt;access damage, deterrniue a course 6f action and change order for post of additional work. 5: ~ the floor for vinyl `Install 318-" BC plywood (finish grsdej on floor -arid ~ new vinyl floor: Note: Pn~perly nail the new plywood, Install plywood using nails ar staples appri~ved for flooring. Install 'a neu vinyl floo. Tte vinyl' to cost nit less tlian' $14.00 sq yard . Install metal trim at door and Kati opening, Install shoe molding at all wall and cabinet amass, I~rime and palm the shoe molding with an oil. based primer end pant- with semi-glass latex paint:. 6 Install new base cabinets, wails cabinets and rolled=back formica:. counter-tops in the, kitchen Itef~er tt1 plan. Install approximately I~' of basecabinet and 14' wall cabinet. Note: New.cabinets shall have hardwood fronts and a factory finish: Nevv cabinets and counter--tops t4 be installed property .Owner to choose finish white or oak: finish, 7'. Install a 12" x 12" dropped soffit for all wall cabinets, Install framing,; sheetrock and finish ;sheetroci~ smooth. • Name` Dorothy Baldwin Page,g Address: i'7U9 Rusch Rd. pity: Chapel I3ilI, N ~:. X75.16 Phone: 9~?-Z~fst? Date: January 2, 2~Og IfiITCHEI~T ! HALI[.VVAY 8. Prepare fibs kitchen. walls, ceiling aad;trim fir paint. dean the walls: with a mild cleaner. Remove-all loose paint .Sand and feather all rough edges. Prepare existing sheetrock walls with fiIler: Fi11 alb hales with:latex; caulk:. Pri%tte the wails arid,"trim with a kilt type: primer.:: Paint the ceiling'witix flat latex'paint, lsaint the walla and trim with: semi-glass latex paint. All paint'shall covercomplotely. LAVING ROOM: 1: Remove fine bed molding. Install %z" sheetrociC on the c,~ilirig. Note: Before sheetrocle is installed located framing far proper nailing.. F'uush. the. sheetrock srnaath. Prime ceiling with-anew sheetrock primer. Prepare the.. walla and trim fQr paint. Feathdr sand all rough edges on trim befiote primer is applied. Prime the wa11s acrd trim with a kilz :type oil • primer. Paint the mails and ceiling with flat latex paint.. Paint fife trim, and dears with semi-gloss latexpaint, All paint to cover carnpietely. BATHItUOM' 1- Remove all: plumbing fixtures,; windgw, wall acid ceiling covering.: to the flaming: ~,. Frame the wiindovsr :opeiang wtfi ~ai4 'framing. Install mafehiag wail sheathing on the exterior, 3. Repair the damaged sub-floor around -the oammode #Iange and'. tub ams. Remove approximately 1: slYeet ~ 32 sq #t) of damaged sheathing.: Replace with matching pressure treated. plywood:: Note: Install aIl.necessary blociang:around the ct~mmade flange :and tub drain: 4 Add two (Z) pressure treated floor joists to :the bathroom. floor: Install all necessary bhocking at walls and tub for sub ~laor nailing., Properly nail thenew Hoar joists at center girder and outer band.. NQTE; If further damage is discovered, the Qwner Gontraetor anrl. Rehabilitation Specialist: will meet fo review the work, dcterinine a course of. action and; if ne~sary, a cost far anY additionah work. `TT Name: Doroth ` Baldwin Page 9 • Y Address: 1.09 Ruscl~ Rd.. City; Chapel »l, N C;. 27516 Phone; X67-2~ Date:-January 2,, 2IXa8 BA"THR~OM Prepare the floor for ~-rryl. stall 3I8" BG plywood and n neyr vinyl. floor.. The vinyl to cost not less #han ~ I4.Op sq. yard. Install metal trim where: the vinyl meets the. hall floor N©te: New pnderlayinent to l~ pt~~pesly insta~ied and nailed. ` 6, Install never 4'~4'':mold~ed baseboard and shoe molding; Prime the new molding with an oil based primer. 7. Prepare the walls; and ceiling f©r MR sheetcocl~. lJh~e: Install mold. i~sisiant wall covering; in the tub/shower area Install'Jz' waIl heard and fuish sinboth. Note: All shedrock.filler to be;properly finished and sanded,. Appq a new coxtstructon primer to the walls and ceiling: 8. Install a five piece :accessory icitt The lat to include two,,twenty--: . four inch towel bars, soap dish,, tumbler holder and paper: holder. Note; Install all .necessary fi axnu~g in wail to secure hardware. 9. Install a surface moun# medicine cabinet above the sink 10 Prepare all surfaces for paint; Fill all nail holes and caulk all n8cessary :seams:. in trim. Paint the walls, ceiling and trim with: sent-gloss lat+e~c paint; X11 pant to suer compl+~tely; 11. move the door unit: in the bathr~m. Ite-frame opening to receive a ,32" 6-panel 1. ~/8" interior door pro-hurig unit:. Install a new 37 inch header and filler studs,' New door #o open; elos~s and lack pmperlys Install a privacy°lockset and dac2r bumper. Door to swing in alongright wall-a# kitchen Priu~e all:bare. Wood with an oil primer.: . 12; Install twe ~2) 24" stainless steel l %4" grab bars in the tub/ shower area. Install ail neeessjuy blocking to secure the grab bars. Consul# homeowner for grab bar location. 0 • P e' 10 Name: Dorothy Baldwin Address:17Q9 Rusch.Rd. Cifl-: t~apel Hi:11; N C , 27515 Phone: 96~ 2360. Date: January 2, 2008 BEI?3tOUM3 # 1, # ~ & # 3 1, Remove the bed molding around the cuing. ~cate framing and caulk lines across ceiling. Install %s" sheetrock using t '/,r"*2" screws or sheetrock nails. Note: All. screws and nails to be driven into solid framing. Finish shee'trock smoa#h and prime v~-th a latex c~nshvcton primer,.. 2. Install three (3~ inch crown molding; in the bedrooms. Note: All lengths less thou l6' shall be install in-:one section. ,A11 corners and. joints to fit properly. Prime new crown molding: wit}% an oil based primer,- 3. Prepare the walls, ceiling and trim for paint. Fill. any holes and damaged-:areas on the walls with sheefxock filler. Caulk: all seams amd craei~ with latex caulk. Clean walls as necessary to provide properbpnd,.Paint the walls and ceiling with flat latex paint. Paint the trim and doors with semi-glass latex paint. AII, paint shall cover completely. ItTote: Trim all doors to close arillatchbefore painting. F,I,Q©I~ SYSTEM REPAIR: ~. Install five ~~~ pressure treated floor joists under the living room floor- Double the existing joists using matching sized lumber: Nail the.new joist to the existing joist,. ~. Install two: (2) pressure ttea#ed dropped girders along the: ~t#re span of the floor system. Center the. dropped girder ;/z span between the.; front and:rear section. Install a triple 2x8 dropped girder. Install adjustable metal post jacks 84" OC. The pest jacks must rest on solid mascinry approved by the Oran$e Count3' Inspection Dept:.. Level floor using :string lines and raise. floor with post jacks. Do not raise .floor more :than ~/~"per day to avoid cracking wall covering. _ 3. Install a galvanized metal termite shield on the exterior foundation walls. In 12 fe+~# sections, j ack the floor system approximately 3/l ~'° and slide the termite shield in from_the exterior. NOTE: Work to be performed: before vinyl siding is installed`,: • blame: Dorothy Baldwin Page Ll • Address: 1704 Rusch Rd. City Chapel Hill, N.G. 2'516 Phone:- 9b7=2360.. Bate: January ~; ?.AO& TERMITE II~ISPECTIUN & TREATMENT: 1. Provide a°pest cantr©1 inspection report and chemically treat the entire foundation wall and.: piers and: the exterior foundation walls, Chemical treatment to'be done by a,'lcerrsed termite or pest control company. `NbYe: Contractor to provide owner with written :proof and waranty of treatment..: SEPTIC TAB: I. Contact a mortified Septic contractor to pump the septic tank and install a riser on the tank: I~lote; The septic tank is appm~cimatellr 18" - 24".t~+elow grade; Riser to pass environmental code. WELL ~4BANDOIVMENT I . Abandon the well per Grange County Health Department specifications: The Orange County Health Department must be notif ed arrd staff must be on site during well abandonment. ,All work M pass Health Department procedures far well abanilomnent. Remove pressure tank from the crawispace and leave on site forthe homeowner Cap off` electrical with wire nuts and electrical tags.: Note:' A Registered Well Cotttractor'must perform-this work. MISCEILANEOUSa 1 Install a dt~yer vent and 22U electrical drye~i' ontet in the kitchen Located beside the washing machine box. Install: a approved dryer vent and vinyl exhaust::covex on the exterior.: I~Tote: install cover during°vinyl. siding installati+~a, 2. Remove the bnrsh~#rees limbs in the back Y~• Approximately 3r4 tandem .loads of brash to be removed. Iiau1 to local landfill, 3; Install 3"' crown molding in the. kitchen, hallway :and living room. Dote: X11 lengths less than sixteen feet (l6')=shall be installed in one section. All joints and corners in ne~v trim .to be installed properly. Prime the new trim with an; oil based }wither • • Naine~ Ik~rothy Baldwin Page l~. Address- I7Q9 Rusch Rd. City; Chapel Hill:N,C..27~1b Phone: 957 :23~fl Date: January ~, 2008 1VIISCELT~Ar1E0US 4. Prepare the front porch" guardrails end. Handrails for paint: Replace all ed pickers and re-nail. all aDSe lumber;: Prime porch'rals with. en oilbonding primer. Paint the porch rails with semi:-gloss latex pai1rt. All paint to cover completely 5. Install white PVC. posts caps on all 4x~ posts on the front`porch, Note: Owner `to approve style of PVC cap. "Install. caps using ~ ~UUs/Q white silicone caullr Cs; Contact. a propane gas company to relocate the propane tank. Note: The e~cisting propane tank is beside. the septic tank:, The propane tank to be moved ~ feet towards the liacl< yard. Install a neva ,has line from the tank to the furnace. l~lotet. Install the septic riser before: #ie gas lino is ":insfalled: Total Labor & Material. • 1=RC~I~iT • 24 #t 10 ft Dorothy Baldwin j 7U9 Rat Rc!`. Chapel Hill,. N.C, ~75"(G HEATED Sl"21=T'- 91 •