Loading...
HomeMy WebLinkAboutAgenda - 05-04-1999 - 6eORANGE COUNTY BOARD OF COMMISSIONERS Action Agenda Item No. ~ - ~ ACTION AGENDA ITEM ABSTRACT Meeting Date: May 4, 1999 SUBJECT: Contract for Archeological Survey of the St. Mary's Road Corridor DEPARTMENT: Environment and Resource Conservation PUBLIC HEARING: (Y/1~ {:.;.~ ~'•: ATTACHMENT(S): Proposed Contract and Project Proposal INFORMATION CONTACT: Donald R. Belk, Land Use & Preservation Planner TELEPHONE NUMBERS: - - ezt. 2594 Hillsborough 732-8181 Chapel Hill 968-4501 Durham 688-7331 Mebane 227-2031 PURPOSE: To approve a contract with L. F. Stine to conduct the accheological survey of the St. Mary's Road Corridor. BACKGROUND: In May, 1998, the BOCC accepted a $4,000 grant from the NC Division of Archives and History to begin a preservation planning study of the St. Mary's Road Corridor. The grant funds will be matched by $6,000 in County funds and $2,000 in-kind services. The first phase of the planning study will consist of a historic architectural survey and an archeological survey of the Corridor. In February, 1999, the BOCC approved a Request for Proposals for the archeological survey, which was distributed to a list of qualified consultants certified by the State Historic Preservation Office. Two proposals were received. After review and discussion of the proposals at their Mazch 24 meeting, the Historic Preservation Commission selected Linda F. Stine, Ph.D., an azcheologist from Julian, NC. The attached contract will employ Dr. Stine to conduct a survey of the archeological resources along the corridor. This survey, coupled with a historical azchitecture survey to be performed by GAI Consultants, Inc., will be part of an eventual Preservation Plan for the St. Mary's Road Corridor. FINANCIAL IMPACT: None. Funding for the contract ($6,476) is provided by the aforementioned grant and a cash match in the FY 1998-99 Environment and Resource Conservation Department budget. RECOMMENDATION: Administration Recommendation. The Manager recommends approval of the contract and recommends that the Board authorize the Manager to sign the contract on behalf of Orange County. N. CAROLINA OSA TEL~919-715-2671 Rpr 26'99 155$ ~, 2 PROJECT DE~CR~QN AND CQNTRAC`T f+or . AItCIiAEOLOGICAL I1WE3TIGATIQI~.QF TJd~ BAIIV'T MARY'S ROAD CORRIDOR P~mded h'Y a National Park 3vlvice Stirwy sad Plasmiag Grant std dto . Orange Cauniy Environtrsomt and Rasootne Consavatiort Dkparament 'Plus F'rojcc;t Uescriptian and Contract art heroin ~t+eed to by Oraatge County an behalf of its F.nvirrniment and Resource Cons~vatBotr Dept hereurat:~er larown as the Cnaateo; Dr. Linda F. Stine, horoitraf~er known as dtie Paocapal Itrv~igabor (PI); and, the Division of Archives and History, hcreina~er known as the Dlvisian. Dan HeDc of the Orange Co~mty Environment and kesourcc Conservation Dcpartmeat; shall eGlvr q tlto Local Coordinator far t'ha project. DokXCs A. hall, Office of State Archaeeaogy, shs~ Ierve as tea Divlsioq'e Prajcct Specialist for the project. The p~rojec;l will be conducted aceor~ m Stye aed Federal laws, standards and prncedurtis, and will be sub,~ct to the review, supercvidon, advice and final acceptance by the T~iviaion. This project description and oosrtract and ~ specify the services and goods provided by die PI, standards to be followal, star sav~icoe and gloocle provided by the Grantee and tfie livision. SEC".7'tON 1. PROJECT OBJECTIYEB: The objective of this project is to invost~te the atchaovb~ca~l properties within the Saint Mary's 12oad Condor ae a part of the ov~erail objo~tiv!o to develop s Preservation Plan for fhC Corridor. The archaeological ccmrpcmcnt co~ret~od try ttvs oeedract win be aecoglpWhed by three tasks: 1. A thar~ugh background study of tiro tawwtt srt[raosl sites, k~caiyans of staaciiug structures, historic docuincplary rosvureos and miodatr ~~ eotnres pertahting to the 1~Jcet environs. 2. Creation of an archaeological contatt fear the 3aiat.Muy'a Road Corridor through irrtegrattion of tfie results of an archaeologicat site ~ background infornnatian rcxulting fxvm Task I. 3. Devetc~anent of a research design attd stAps of work for thdn+c archaaologicai studies in the Saint Mary's Road Con Wor. This wdl serMO ar a component of the Orange Crnurty Preservation flan sad direct ~we+e archaeobgical iavarti~tlons m the area. _. .I ... ~.;.. ~: 3 SECTION 2. SERVICES AND GOODS PROVIDED BY THE PI: The PI will conduct the investigations in accordance with the objectives and work stages defined in Section 1 (see also Appendix A. Project Abstract). All work will be consistent with the Secretary of the Department of the Interior's standards and guidelines for archaeological projects. In addition, the PI shall insure that any personnel employed for field or laboratory supervisors must meet the professional qualifications criteria set forth by the National Park Service, Department of the Interior, in 36 CFR Part 66 (Federal Register 42(19), 1977). The PI shall prepare and submit reports to the Division in accordance with the following: {1) Interim Resort. On or before July 1, 1999, the PI shall prepare and submit to the Local Coordinator and Division abrief -Interim -report on the grant activities to date. The report shall note any significant results or findings of the project, specific problems encountered during the work recommendations or requests for any amendments to the terms of this agreement, and the projected schedule for project completion if different from that defined by this agreement. (2) Dratf Final Report. On or before August 15, 1999, the PI shall prepare and submit to the Local Coordinator and Division a complete double-spaced draft report summarizing the analyses and results. The report shall include but not be limited to the following: (a) Abstract: containing sununary information on the objectives and results of the project. (b) Introduction: inchuding sponsorship of the project, the fimdmg sources (with specific reference to the U.S. Department of the Interior, the North Carolina Division of Archives and History, and the Orange County Environment and Resource Conservation D.epartment), project personnel, and project objectives. {c) Bac ound: including a discussion of the background research conducted on the archaeological and historical context of the project, as appropriate. This section should also contain references to any professional or local consultations contributing to the background research. (d) Archaeological context development: including discussions of factors considered in determining potential site locations and descriptions of pertinent prehistoric and historic landscapes as well as associated themes, sites and landscape features. (e) Field methods: including discussions of the reconnaissance survey methods, procedures and results. (f) Project results: including a research design for future archaeological investigation as well as a regional context which can be used in dete*m~n~ng the potential National Register eligibility of as yet unrecorded archaeological resources. (g) Conclusions, evaluations, and recommendations: including a scope of work far future archaeological survey and testing within the Saint Mary's Road Corridor. 4 (h} Maps, charts and data tables: as necessazy and appropriate. Detailed surveyed azea maps should be included in the report (e.g., U.S.G.S Topograplc Map sections). However, since the report may be distributed to the general public, detailed site locational maps should not be included in the Final Project Report. The digital map of suspected and confirmed azchaeological site and landscape feature locations along the comdor should be submitted as a separate product. [Note: All archaeological site references in the final report and data tables must employ official State Archaeological Site number designations. Under this grant, the PI may obtain State Archaeological Site numbers far newly recorded sites prior to submission of site forms by sending a detailed location map (e.g., U.S.G.S. Topographic Map) for each site to the Office of State Archaeology. See also sections 2{4) and 4 below.] (3) Final Report. Following submission of the draft final report by the PI, the Division shall have 20 days to review the report and communicate all necessary or recommended changes to the PI prior to preparation of the final project report. On or before September 22, 1999, the PI shall submit five copies of the final report to the Division, at least vne of which must be unbound. Three of the copies will be forwarded to the National Park Service by the Division. [Note: The Final Project Report must be single-spaced and filly paginated.] The Division retains all editorial, reproduction, publication, and distribution rights to the project report. However, the Division shall not restrict the use of the project information by the Grantee as long as any subsequent use of the report, documentation or results of the project include appropriate recognition of the funding sources for the project. [See also Appendix C. Appendix for Subgrant Agreements] (4) Archaeological Site Forms: Upon completion of the project, the PI shall submit to the Division copies of completed North Carolina Archaeological Site foams for each site recorded during the project. In addition, the PI shall submit updates for previously recorded sites investigated during the project. Site forms should be submitted separate from and not included in the final report. SECTION 3. SERVICES TO BE PROVIDED BY THE GRANTEE: The Grantee shall provide local administration and accounting of the grant and shall make available to the PI copies of its relevant digital data files for use by the University of North Carolina at Greensboro geography students for preparation of the digital map. SECTION 4. SERVICES TO BE PROVIDED BY THE DIVISION: The Division shall make available to the PI any and all information currently available in its files which may be pertinent to the effective completion of the project. The Division shall also provide blank archaeological site forms for all sites identified during the project. SECTION 5: PROPERTY ACCESS: It shall be the responsibility of the PI to acquire all necessary approvals for entering upon and conducting the azchaeological investigations on private lands. In the case of publically-owned lands, appropriate permits must be acquired prior to the investigations. SECTION 6. CURATORIAL RESPONSIBILITIES: All artifacts, documents or other materials generated by this project remain the property of the State of North Cazolina, except in the case of materials recovered from private lands and not otherwise donated by the rightful owner, and shall be curated by the Office of State Archaeology in accordance with accepted curatorial standards and guidelines. SECTION 7. TIME SCHEDULE: The project shall begin on or after the date of this contract and terminate no later than September 30, 1999. SECTION 8. PROJECT BUDGET AND ACCOUNTING PROCEDURES: The Project Budget and Time-Product-Payment Schedule (Appendix B) is to be followed throughout the course of the project. Each time reimbursements are requested from the Division by the Grantee project expenditures should be documented with canceled (or certified) checks and invoices, and attached to a cover letter addressed to: Ms. Linda Edmisten, Grants-in-Aid Administrator, 109 East Jones Street, Raleigh, NC 27601-2807. Further details on reimbursement, administration of grant funds, audit requirements, and financial documentation aze found in the Grantee Handbook for Federal Preservation Fund Grant Projects, which is incorporated by reference. SECTION 9. PERSONAL INCOME AND SELF-EMPLOYMENT TAX RESPONSIBILITIES OF THE PI: It is understood that this is a contract for the professional services of the PI, not an employee of the Division, and that payment for services constitutes a fee which excludes all employment taxes and related benefits. The Grantee will be responsible for filing appropriate IRS income statements (FORM 1099) for the PI. 6 SECTION 10. TERNIINATION OF CONTRACT: Termination by Grantee of PI's Contract for Cause. If the PI fails to fulfill in a timely and proper manner his/her obligations under this contract', or if the PI violates any of the stipulations of this contract, the Grantee, with the concurrence of the Division, shall have the right to terminate the contract for cause by giving written notice to the Contractor specifying the reasons for and effective date of termination. In such event, the PI shall cease work immediately upon receipt of such notice. The PI shall be entitled to receive just and equitable compensation for any satisfactory work completed prior to termination. Enforcement Remedies by Division for PI Nonperformance If the PI fails to fulfill in a timely and proper manner, his or her obligation under this contract, or violates any of the provisions of this contract, the Division may enforce the remedies for grantee or subgrantee compliance pursuant to section 43 of the Code of Federal Regulations (43 CFR 12.43, 12.44), incorporated by refercnce in this contract. SECTION 11. CHANGES IN PROJECT DESCRIPTION/CONTRACT: The Grantee should contact grants administrator Linda Edmisten by telephone if any changes are anticipated. If the change is minor, the grants administrator will advise the Grantee to proceed and to describe the change in the final financial report. If the change is major, the Grantee will be required to use the procedwe outlined in the Grantee Handbook for Federal Historic Preservation Fund Grant Projects. Only minor changes may be made in the scope or budget without the approval of the Division. 1~Iinor changes are those changes that involve 5% or less of the project cost and that: do not alter the basic scope of the project; do not substitute unapproved materials or methods; do not add or delete work items. All other changes will be deemed to be major changes. Costs of major changes made without prior Division approval may be disallowed and the entire grant allocation of the project may be canceled. Major changes are to be approved in writing by the Division before changes are made. SECTION 12. NONDISCRIIVIINATION ASSURANCES: In consideration of the signing of this Project Description and Contract for the performance of work and furnishing of labor and materials as set forth herein, the parties hereto for themselves, their agents, officials, and employees or servants agree not to discriminate in any manner on the basis of age, handicap, sex, race, color, creed, sexual orientation,. or national origin with reference to the subject matter of this Contract. 5 SECTION 13. OTHER STIPULATIONS: The attached "Appendi<Y for Subgrant Agreements" is hereby incorporated by reference and contains stipulations regarding procurement; retention of records; changes in scope; prohibition of lobbying; non-federal audit; publications; suspension or termination of subgrant; standards for final products; equal opportunity; and other requirements. We the undersigned, hatiing read, understood, and agreed to the terms of this project description and contract, so a~,Y our signatures this day of , 1999. Grantee: John M. Link, Jr. Orange County Manager Linda F. Stine, Ph.D. Principal Imestig ator Division of Archives and History: David Brook, Deputy State Historic Preservafiion Officer 6 APPENDIX A ARCHAEOLOGICAL INVESTIGATION OF SAINT MARY'S ROAD PROPOSAL 04/09/1999 09:14 9196443002 OR. CTY. PLAt~IING 9 Proposal for Developing an Archaeological Context for the 3t. Mary's Road ~ Corridor, Orange County, North Carolina Llnda Franca Stine, Ph.D. March 22, 1999 Orange County Is using a landscape perspective to create a preservation plan for the St. Mary's Road Corridor (SR1002) (8dk 1999). A landxape approach is an integrative study of how people shape, and are "shaped by the land in dynamic cultural and natural contexts. A landscape approach in preservation guides intordisciplinary research and evaluation of historical propertips...[and] fosters a regional perspective for evaluating and managing a project's historic properties" (Stine and Stine 1997: !89). Interdisc:lpllnary researchers using thin perspective will identify natural and farmland resource areas, scenic viewsheds, and above and below ground cultural resources (Belk 1999), The approximately fi.4.mile stretch of St. Mary's Road, beginning at its Intersection with Hwy 7Q and contlnuinp eastwards to the Durham County line, forms the baseline for the project area. Orange County's Preservation Plan for the 9t. Mary's Road Corridor will be predicated, in part, on the results of archaeological and hi~oric structure resources surveys. This proposal addresses three major tasks assodated with investigating the archaeological properties within the St Mscry'g Raad Corridor (SR1002). The primary task is to conduct a thorough background study of the known archaeological sites, standing structures, historic documentary resources, and modern cartographic souroe3 pertaining to the project environs. This background research, Task One, forms the core of the study, providing information to develop a view of relevant past landscapes. Task Onv will also provide data on possible site Ioeatic~nR, forming the basis ter the second task, "ground-frothing" site locations. Possible sites include traces of historic rude!-tied, artifact scatters, historic and/or prohistorie structural romnants, and/or oilier hypes of cultural remains. Task Two will entail archaeological site reconnaissance to verify the presence/absence of cult«ral remains in areas of high potential for prehistoric and historic sites. Part of this task will be to integrate the data from background and archaeological field reconndlsaance to create an archaeological context for the 6t. Mary's Road Corridor. (t wilt provide preservationists, planners, and the public with a visbn of past land-use patterns, settlement choices, and the cultural Interplay that ~~.curred in this area. Task Three entail developing a research design and concomitant scope of work for future archaeological studies in the proj®ct area. This will ovontually nerve aE p3rt of Or~.ange County's Preservation Plan, enabling residents to place modem Issues {e.g., erosion, clean water, land-use) within a broader historic context. 04/09/1999 09:14 9196443002 OR. CTY. PLANNING 10 Proposed Archaooloylcat Resouro~ $urvoy St. Mary's Road is a curving two-lane blacktop that gently traverses Piedmont lands. These lands arA primarily torsi-agricultural, although this land-use pattern is changing with increasing residential development occurring in the area. The St. Mary'S cxrridor follows traces of an historic trade routo that ones connected prehistoric and historic inhabitants living in the bounds of present-day South Carolina, North Carolina, and Virginia. This great path was known by many names, such as the `Catawba Path," the '~'radinp Path." the "Virginia Path,' and the "Occaneechi Trail," and later as the "Oxford Road" (e.g., Catawba Regional Planning Council 1975:46; Joy 1995:3; Stine y990). A wealth of documentation exists for the study area in terms of historic maps, aerial photographs, primary and secondary documentary historic x3urces, cJaneatogical research results, and regional architectural and archaeological surveys. These data will be the initial focus of the archaeological investigations. Task One During the author's t~ure at the South Carolina Institute of Archaeolc~yy and Anthropology she worked on a similar project for the Charleston County Planning Office (Stine 1992). Using myriad sources she described the prehistoric and historic landscapes in the Cherlo3ton areal, listed and di®cuesed tho known archaeological sites, and developed pertinent themes for future research within each pertinent cukural period. She found that reading general area histories and talking with kacal historians and preservationists gave a good indication of relevant regional themes. Primary documentary research (plats, maps, wills, deeds, memorials, etc.) uncovered changing patterns of land-use, tran3port~rtion routes, and settlement patterning during the historic era. Maps of natural resources, used in tandem with known archaeological Sete locations, also provided data for describing prorJable changing pretristuric land- use in Charleston and environs. Ali sorts of informative histories! maps and other resources were uncovered during the background search phase of the protect from both state and regional repositories. The proposed project personnel (see below) already have a solid background in regional and local history and are familiar with the sources listed in the bibliography of the County's Request for Proposals (Belk 1999). Researchers will silt through primary and secondary sources found in pertinent repositories In Hillsborough, Chapel Hill, Durham, and Raleigh. An AnnotAted bibliography will bQ pr®pared for all examined resources. Inventory files (archeological, anchitectural, cemetery, National Register) located at the Department of Cultural Resources In Raleigh will be lt~ts initial focus of research. In that manner the St. Mary's project wilt be building on previous work Instead of repeating earlier studies. A brief inspection of tiw archaoological site files at the Office of State Archaeology (GSA) in Raleigh revealed that no systematic surveys have been undertaken along this corridor. The one previously rr~rd+~d sits in the vicinity is 310R228, consisting of 3 flakes noted on the surface of a plowed field. However a perusal of archaeological site bcations on relevant United States Geologic Survey 2 04/09/1999 09:14 9196443002 OR. CTY. PLANNING 11 (USGI;) maps (i.o., Hillsborough, Northwest Durham, and Rougemont 7.5° quadrangle maps) revealed the presence of numerous prehistoric and historic sites in the general study region. Potentially eligible and/or eligible historic properties located through architectural survey along St. Mary's Road also suggests that associated, contributing archaeological resources may be present in the study area (Belk 1999, study area map). As in the Charleston study, the St. Mary's project will have to facilitate Commurncation between the architectural hislrJriarrs and the archaeologists. Valuable research time and resources should not be waisted through unnecessary duplication of effort, such as seeking the same plat orchain-of-title- information. If the two studies are on-going, personnel should have occasional meatings to share information, sources, and ideas about important area research themes. It one study is completed before the other, that report Should be made available to the other researchers. It should be noted that the quality of the state archaeological site files is uneven, dependent on the standards of the time and th® efficacy of the student, collector, or profe~ional filling out tho form. The St. Mary's study will entail c:hpx:king regional site file information, contacting site owners and local collectors listed on older forms, and generally verifying the continued presence/ab~nce of certain resources through field reconnaissance. One of the primary sources of information in the Charleston study were interested loos) oollectors ernd members of tho local archaeoogical sociAtiea Orange, Durham, and Aiamance counties hold a number of enthusiastic collectors, some members of the Tar Heel Archaeok~yic:al Society, who will be contented as part of tht St. Mary's Project. These individuals may hold important knowledge about site locations in the project area, and/or about others who would be more familiar with arohaeologica) zito locations in the fields along St. Mary's Road. Another important avenue of research are local landowners. One method to reach local landowners and other Interested Orange County residesnls will be to advertise (e.g., Durham and Orange county newspapers) a'Town Hall" type of meeting one Este afternoon or evening in the Hillsborough area. Project personnel will be able to identify artifacts for local residents, help them fill out North Carolina OSA short archaeological forms, map site locations, and help generate good will towards preservation of cultural resources. This should also enable ilia field Crew to arrange permission(s) to etccess private lands for "ground frothing" portions of the corridor as well as to further document private archaeological collections. Task Two Resd~trct~ re3sults should reveal locations of erdditional archaeological resources, such as remnants of the historic road bed and related historic structures (e.g., farmsteads, stores, and/or taverns). Historic maps research, in tandem with study of the modern topographic maps, should indicate the proi;~ahlA lnc.~ation of the old trading path. These results will be compared to the existing alignment of St. Mary's Road lv ~a it lrac~3s of the historic road might exist, perhe~p3 by-pasxd by more recent road construction.actlvitles. Previous work at Ayr-Mount Pldntatbn in Hillsborough, and on Treybum development lands in Durham and Granville counties, 3 04f09/1999 09:14 9196443002 OR. CTY. PLANNING 12 revealed that historic road-bed remnants do exist, usually appearing as a dAAply- eroded, linear clay featur®. This feature "signature" should be visible in historic aerial photographs (e.g., 1930s soli survey) investigated during tha k~aokground research phase of the project. Information on site locations and potential site locations gathered from review of maps, the various state situ files, secondary and primary historic sourca~4, informant interviews, and other kinds of research will be correlated. Pertinent prehistoric and historic landscapes will tae described ss wail as associated ttrarrres, sites, and landscape features. This will form an archaeological context for the St. Mary's Corridor. One additional product of this research will be piacemartt of site locations nn USGS quadrangle maps. These maps and related site attribute information wiii be placed in a compatible digital format for use by Orange County. Mr. Roscoe Reeves has stated that the County weuld provide, at no expense, copies of its relevant digital data files to University of North Carolina at Greensboro Geography students. Student mCmbers of the projoot will help in the analysis of site distributions and map production. Task Three After Correlating the results of Intensive background. research, information gathered from locral landowners and collectors, and initial field reconnaissanoA, a research design for future archaeological investigations will be produced. This research design will be in~rporated as part of the project re~wrt. It will include recommendations for future avenues of histoi~cal research. A scope of work will be included a8 an appendix to the report. This scope of work will include a comprehensive plan for systematic archaeological survey and testing of specific portions of the project area, and recommendations for laboratory analysis and subsequent curatlonal responsibilities. As one of the pre~ervr~tion goals is determination of potential eligibility of future resources for nomination to the National Register of Historic Places, the Criteria for such determinations wql also be explained in a regional context. Products Two main products will result from this study. The first is a professbnal quality report that includes an archaeological context for the St. Mary's Corridor. Prehistoric and historic landscapes will tae described with rolevant themes, site decCriptic,nR, and landscape future descript>ons noted within each cultural period pertinent to tha project area. An annotated bibliography will txf par l of lt~is report, hyping to focus future historical research efforts. Background research and site reconnaissance will be synthesized to create a research design for future archaeological research in the area. A scope of work will ba appended to the report that details field metlx~clc, laboratory methods, and curation8l responsibilities stemming from the overarching research design. ~~ The second product of this study will be a digital map of suspected and confirmed archaeological site and landscape feature locations along the St. Mary's 4 04!09/1999 09:14 9196443002 OR. CN. PLANNING 13 Corridor. This will eri~tble Orang® County personnel to integrate the results of this project within their Geographic Information System. Project Poreonnel The project team will consist of three professional archaeologists, Dr. Linda France Stine, Ms. Dest~orah Joy, and Mr. Tom Har9rovo. /11t three have strong research interests in the region. Dr. Stine will be the project leader, with final responsibil'Ity for the work and for~production of the report as a sole proprietor. Si•irs will undertake much of the hi.~tcxic research, work with students on map analysis and production, and will be the primary author and report editor. Dr. Stine has over twenty years arc:i~ae~c7logical experience. varying from posltlon3 in private euftural resource management firms, government environmental and cultural resource review, and university level teaching. Dr. Stine received her B.A. from tfte University of Ncrlt~ Carolina at rha~el Hill in 1978, her M.A. from the College of IMlliam and Mary in 1984, and her Ph.D. from the University of North Carolina at Chapel Hiil in 1989, all degrees awarded in Anthropology. Stine served as n orew member at Stagviile's Horton Grove complex during archaeological testing in the late 1970s for North Carolina Historic Sites. While a graduate student at UNC-GH Dr. Stine was part of the Slntian Project and worked at the Fredricks site in Hillsborough. She was responsible for investigating transforming regional trade patterns from circa 1640-1740 (Stine 1988, 1990). She 810 field directed testing at Ayr Mount Plttntatlon on St. Mary's Road in Hillsborough (Stine and Madry 1988). Mr. Tom Hargrove will direct the field reconnaissance, help with artltact identification, share his vast knowledge of local sources, undertake some of the historic map analysis, and wilt be responsible for some report wri#ing. He will be hired as a field director/rexarcher as a suboontraotor to Dr. Stine. Mr. Hargrove has over twenty years of professional archaeobgiCal experience, including employment by the North Carolina Department yr Cultural Resources, overseeing the firm Archeological Research Consultants (since 1981 }, and consulting work with various government and private entities throughout the southeast. He has extensive experience working in the region (e.g., Hargrove 1 13132, 1987, 1992, 1993, 1985). Mr. Hargrove has his M.A. in Anthropology from George Washington University. He is presently finishing up his Ph.D. studies in Anthropology at the University of North Carolina at Ghapel HIII. Deborah Joy will aid in the fieldwork, contribute her knowledge of area sources, and help with the ardfact identification. She will be hired as an independent 3uboontractor to Dr. Stine. Ms. Joy has her M.A. in History from Duke University, and over 15 years professional experience in archaeology. Her professional experience includes that of an archaeologist with the North Garolina Department of Transportation, laboratory analysis of cultural material excavated from the Edenton Tea Party S1te and the 1767 Chowan County Court House Site with the North Carolina Department of Cultural Resources, and various non-oomplianee monitoring projects in the Pensacola National Register Historic District in Florida. She also worked in the Study area at the St. Mary's Chapel Cemetery (Joy 1995). Selected students at the Geography Department, University of North Carolina at Greensboro, will produce digital and hard-copy maps of the archaeological resources. 5 04/09/1999 09.:14 9196443002 OR. CTY. PLANNING ~4 These students have r~videnced a strong interest in looming about the archueolo9Y of North Carolina, and have participated as volunteers and/or paid technidans on local projects under Dr. Stine's supervision. Project Work Estimates: Task PN'aon Day,: Cost I. Fieldwork A. Town hall- artifact ident'~ication 1.$ B. Collector's Survey- site visits ~+ C. Ground Truthing road remnants 2 subtotal : 7.5 $1, b88.00 II. Background Research A. 1930s Soil Aerials 1 B. Historic Maps 4 C. 17ept (:t,itural Resource Fies 1.5 D. Other Archival Research 3 subtotal: 9.5 $2, 512.00 III. Analysis and Report writing A. Correlation of site attributes 2 B. Map Cweriays/GiS 9 C. Report Writing 8 D. Report compilationlediting 2 subtotal: L1 $2,752.00 Total Labor: 38 $5,264.00 tY. Additional Expsna~a A. Supplies (sharpies, notebooks, bags) $50.00 B. Topographic Maps, Air Photos, Blue lines $100.00 C. Xeroxing $25.00 D. Film, Film i~rooossing $'0•~ E. Report Duplication ~~•~ F. Report Graphic Reproductlottlpaper $50.00 subtotal: $475.00 14°~ of total Labor $736.96 Grand Estimated Total: ~~ ~6,4T3.96 6 04/09/1999 09:14 9196443002 OR. CTY. PLANNING 15 Retefences Cited Belk, Donald R. 1999 R~uest for Proposals for Archaeological Survey of St Mary's Road Corridor. Orange County Department of Environment and Resource Conservation, Hillskyorough, North Carolina. Hargrove, Thomas 198? Arc:haeoloyical Survey Within Revised Phase I Development Areas of Cate's Ford Access Area, Eno R/ver State Psrk, Orange County, N.C. Prepared far North Carolina State Parlc~. Ms on Pilo, Archaeological Research Consultants, Chapel Hill. 1987 An ArchaeologJCal Recorrnalssance Survey of the Proposed Site of the Nello Teer North Durham Quarry, Aougemont Vicinity, Durham and Orange Counties, North Carolina. Prepared for Ragsdale Engineers of Raleigh. Ms on filQ, Archaeological Research Consultants, Chapel HIII. 1992 An Archaeological Survey of-the Proposed Expansion of the Finley Golf Course, University of North CaroNna, Orange and Durham Counties, Chapel H!!I, North Carolina. Preparod for John R. MoAdams Company, Research Triangle Park. Ms on file, Archaeological Research Consultants, Chapel Hifl. 1993 Archaeological Survey of the Proposed Ni!lsborough Reservoir, Cedar Grove Ycinity, Orange County, North Carolina. Prepared for the Wooten Company, Raleigh. Robort J. Goldstein and Assooiates, Raleigh, North Carolina. 1 J~JS Archaeological Test ExcavaUOns /n the Proposed Hlllsbvrvuyir Reservoir, Cedar-Grove. Orange County, North Carolina. Robert J. Doldstein and Associates, Raleigh, North Carolina. Joy, peborah 1 yyb Archaeologcca/ A5se55meni of Si Mary's Chapel Cemetery, Hillsborough Vicinity, Orange County, North Carolina Prepared for the Committee on St. Mary's Chapel. Stine, Linda France 198fi The First Hundred Years of Atlantic Piedmont Fur Trade. Paper presented at the 51st Society for American Archaeology Meetings, New Orleans. 1990 MercandUem end Piedmont Paltry: Co/onip/ Perceptions of the Southern Fur Trade, Clr~ca 1640-1740. Volumes in Historical Archaeology XIV, edited by Stanley South. The South Carolina institute of Archaeology and Antt~r~pology, University of South Carolina, Columbia 7 04/09/1999 09:14 9196443@02 OR. CTY. PI.ANrIING 16 ~ 992 Revealing Historio Landscapes in Charleston County: Archaeological Inventory, Contexts, and Management Go-Principal investigators Steven D. Smith and Linda F. Stine, South. Carolina Institute of Archaeology and Anthropobgy, University of South r^.arol&~ta. Columbia. Prepared for the County of Charleston Planning Department. Charleston, and the South Carolina Department of Archives and His~tury. Stine, Linda F. and Scott Madry i 98fi Archaeo/op1C81 Investigations at Ayr-Noun! Plantation. Prepared for Richard Jenrette, Ayr-Mount owner, Hillsborough, North Carolina. Un tlie, North Carolina 8HP0, Department of Cultural Resources. Stine, Linda F. and Roy S. Stine 1997 South Carolina's Landscapes: Innovative Research and Guttural Resource Management Perspectives. In Carolina's Historical Landscapes: Archaeological Por3peof/vae. Edited by Unda F. Sting, Martha Zierden. Lesley M. Drucker, and Christopher Judge. University of Tennessee Press, Knoxville, pp. 189- 203, 8 17 APPENDI?~ B PROJECT BUDGET and TIME-PRODUCT-PAYMENT SCHEDULE Budget Under this agreement, the Division will pay to the Grantee a total of $2600.00 for the project in accordance with the following itemized budget: HPF Grant Funds Grantee Cash Match Grantee Inldnd Match Project Total Personnel Princi al Investi ator 2600.00 2664.00 5264.00 Local Coordinator 1324.00 1324.00 Office Su lies/Ma s 200.00 200.00 Printin and Co 'n 275.00 275.00 Other: Indirect Costs 737.00 737.00 TOTALS 2600.00 3876.00 1324.00 7800.00 Time-Product-Payment Schedule Under this agreement, the Grantee will be reimbursed far expenditures for the project in accordance with the project budget and Time-Product-Payment Schedule described herein and shown below. Upon acceptance of the agreement, the Grantee may request an advance up to but not to exceed 25% ($650.00) of the total grant amount. Upon submission of the Interim Project Report (See Section 2) and documentation of expenditure of any advanced funds and match, an additional 50% ($1300.00) of the grant total may be requested. The final 25% ($650.00) of the grant total will be retained by the Division pending submission and acceptance of the Final Project Report and accounting documentation. TIME-PRODUCT SCHEDULE Mazimum Pa ment U n Acce tance of A Bement 650.00 Interim Re ort Submission -Jul 1, 1999 1300.00 Final Re rt Submission, on or before Se tember 22, 1999 650.00 TOTAL PAYABLE 2600.00 18 APPENDIX C APPENDLY for SUBGRANT AGREEMENTS The following stipulations apply to all subgrant projects funded in part by federal Historic Preservation Fund (HPF) monies awarded to the North Carolina Department of Cultural Resources, Division of Archives and History, State Historic Preservation Oi~ce (HPO), by the U. S. Department of the Interior, National Park Service. Questions about the application of these conditions to specific projects are available from the HPO project specialists or from Linda Edmisten, Grants Administrator, State Historic Preservation Office, 109 East Jones Street, Raleigh, NC 27601-2807. Telephone: (919) 733-4763, FAX: (919) 733-8653. PROCUREMENT: Subgrantees must forward to the HPO evidence of compliance with Federal competitive procurement requirements for professional services and subcontracts prior to reimbursement, if applicable. 2. RETENTION OF RECORDS: Acceptable federal and nonfederal share supporting documentation must be submitted prior to reimbursement, if applicable. Documentation includes: copies of contract, timesheets, front and back of canceled checks (or computer printouts imroices, etc. 3. CHANGES IN SCOPE: The approved scope of work, products, budget and performance/reporting milestones included in the contract cannot be changed without prior written approval from the HPO. 4. LOBBYING PROHIBITED: Subgrantees must conform with the following text of 18 U.S.C. 1913, which prohibits the use of the subgrant funds for lobbying: No part of the money appropriated by arty enactment of Congress shall, in the absence of express authorization by Congress, be used directly or indirectly to pay for arty personal service, advertisement telegram, telephone, letter, printed or written matter, or other device, intended or designated to influence in airy manner aMember of Congress, to favor or oppose by vote or otherwise, arty legislation or appropriation by Congress, whether before or after the introduction of arty bill or resolution proposing such legislation or appropriation; bict this shall not prevent o,,~rcers or employees of the United States or its Department or agencies from communication to Members of Congress on the request of arty Member or to Congress, through the proper offtcial channels, requests for legislation or appropriations which they deem necessary for the efficient conduct of the public business. 5. NONFEDERAL AUDIT: Subgrantees are responsible for obtaining audits in accordance with the Single .4uditAct of 1984 for State or local governments, or the audit requirements of O1LiB Circular A-110 for universities and nonprofit organizations. The audits shall be 9 1~ made by an independent auditor in accordance with generally accepted government auditing standards covering financial and compliance audits. 6. PUBLICATIONS: Acknowledgment of federal giant assistance should be made in connection with the publication of any material based on, or developed under, any activity supported by HPF grant funds, as follows: The activity that is the subject of this (type of publication) has been financed (in part/entirely) with federal funds from the National Park Service, Department of the Interior. However, the contents and opinions do not necessarily reflect the views or policies of the Department of the Interior, nor does the mention of trade names or commercial products constitute endorsement or recommendation by the Department of the Interior. NOTE: The design and content of any publication produced from a survey of architectural or archaeological resources must be reviewed and approved by the HPO prior to its printing. 7. SUSPENSION OR TERMINATION OF SUBGRANT: Voluntary and involuntary suspension or termination of the subgrarit, in whole or in part, by either the State or subgrantee may occur at any time prior to the date of project completion. 8. STANDARDS FOR FINAL PRODUCTS: Final products which do not conform to the terms and conditions of the grant agreement or which do not meet the applicable Secretary of the Interior's "Standards" will not be reimbursed. 9. EQUAL OPPORTUNITY: Subgrantee must comply with Title VI of the civil Rights .4ct of 1964 and Section 504 of the Rehabilitation Act of 1973. 10, OTHER REQUIREMENTS: In addition to the terms detailed in this Subgrant Agreement, all federal requirements governing grants are applicable. (OhIB ~'irc~clars A-87 orA-121, A-102 orA-110, andA-128) 10