HomeMy WebLinkAboutAgenda - 05-18-1999 - 10bORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: May 18, 1999
Action Agenda
Item No. /p_b
SUBJECT: Orange County Y2K Implementation Plan
DEPARTMENT: County Manager
PUBLIC HEARING: (Y/1~ No
ATTACHMENT(S): INFORMATION CONTACT:
None Rod Visser, ext 2300; Pam Jones, ext 2650;
Jim McGimsey, Y2K Coordinator, ext 3070
TELEPHONE NUMBERS:
Hillsborough 732-8181
Chapel Hill 968-4501
Durham 688-7331
Mebane 336-227-2031
PURPOSE: To receive a report on County preparations to deal with Year 2000 technology challenges
BACKGROUND: Experts believe that many computer systems will have at least some difficulties in
coping with the challenges presented when the year changes from 1999 to 2000, because of limitations in
old computer programming codes. There are concerns that many computer programs and electronic
devices with embedded microchips will malfunction because of an inability to correctly recognize dates of
January 1, 2000 and beyond. At their Apri16, 1999 meeting, the Board approved a contract with
McGladrey & Pullen, LLP, to provide assistance to County staff in assessing, correcting, and testing the
County's preparedness to continue operations in light of these potential problems.
The County's critical systems, as outlined below, will be repaired as needed, tested, and verified as Y2K
compliant by June 21, 1999. Items that fall into the critical system category have been identified by the
Y2K sub-committees who have focused on public safety, embedded chips, computer equipment and
human services. These have also been confirmed with department heads.
Certain critical services cannot be allowed to have a lapse in service for any period of time. The critical
services, along with the required support systems have been identified as follows:
Emergency Management
• 9-1-1 dispatching capabilities
• Telephone service, both internal and external
Infrastructure services such as water, power, HVAC for the facility
Emergency power supplied through an on-site emergency generator
Ambulances: All on-board equipment that could include embedded chips; vehicles; and
communications equipment (including mobile radios, cell phones, pagers, etc.)
Volunteer Fire Departments
• Communications equipment
• Vehicles
Jail
• Cell lock system
• Communications equipment (including radios, intercoms, prisoner monitoring devices); and
infrastructure items such as water, power, HVAC
Sheriff s Office
• Communications equipment
• Vehicles
Central Services
• Telephone system
Sewer
• Efland Sewer lift stations and emergency power
DSS
• Support systems in place to allow adult/child protective services to operate
Other functions, while extremely important, are one step down from the level of criticality attached to
the above life/safety fiznctions. They will undergo the same level of compliance testing as the
aforementioned items, however, their compliance may not be assured until mid-July, 1999. These
systems include:
DSS
Ability to process entitlements
Mainframe Software
Ensure applications aze compliant to operate the County's business system (e.g. finance, purchasing,
payroll,etc.), land records, and tax collections system. Note that most functions in tax collections could be
accomplished manually. However, since the time of year the potential computer failures could occur is a
high volume period for this activity, automation plays a critical role in the ability to provide the
appropriate level of service and to accurately account for collections.
Work on other less critical systems will continue over the summer. This fall, the Y2K coordinator will
assist County staff in contingency planning for continuity of the most important County services, should
circumstances beyond the County's control (e.g. widespread unavailability of electrical power) preclude
normal operations and prevent the use of automated systems that the County has rendered Y2K compliant.
Extensive documentation of County assessment, repair, testing, and validation efforts to date aze
maintained by the Y2K Coordinator and aze available for review at the Boazd's request. Staff members of
the County's Y2K Steering Committee and Y2K Coordinator Jim McGimsey will be available at this
meeting to respond to any Board questions about the County's Y2K implementation plan.
FINANCIAL IMPACT: Funding for most necessary County technology replacements and repairs has
already been included in the current CIP and current or previous operating budgets. If additional costs are
noted during the completion of the County's Y2K implementation plan, they can be addressed through a
Y2K reserve in the 1999-2000 CIP or through other County financial reserves, as the Board decides.
RECOMMENDATION(S): The Manager recommends that the Board receive the report for
information only.