HomeMy WebLinkAboutAgenda - 08-17-1999 - 10ai.
1
ORANGECOUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: August 17, 1999
Action Agenda
Item # /O -Q
SUBJECT: Report on Topics for the Proposed September 2nd Meeting on Local Jurisdictions'
Coordination to Access Jordan Lake Water Supply
DEPARTMENT: County Manager
ATTACHMENT(S):
4/13/99 letter from Alice Gordon to
Daniel VanderMeer
County Manager's letter to OWASA
PUBLIC HEARING: Yes No
BUDGET AMENDMENT: Yes
INFORMATION CONTACT:
County Engineer Extension 2303
No
County Manager's letter to Chatham County TELEPHONE NUMBERS:
Chatham County Engineering Consultant's Hillsborough - 732 -8181
Response to BOCC questions /issues Durham - 688 -7331
OWASA Response to BOCC questions/ Mebane - 227 -2031
issues (under separate cover) Chapel Hill - 967- 9251/968 -4501
PURPOSE: To consider responses from OWASA and Chatham County with regard to topics of
discussion for the proposed September 2 "d Board Meeting on local jurisdictions'
coordination to access the Jordan Lake water supply.
BACKGROUND: The subject of Chatham County's access to its Jordan Lake water
allocation and the role that Orange County, the Towns of Chapel Hill and
Carrboro, and OWASA might play in facilitating that access have been a
subject of discussion for nearly a year. An interlocal meeting has been
proposed for September 2, 1999, to discuss this issue.
On July 14, 1999, the Manager sent letters of inquiry (see attached) to Ed
Kerwin, Executive Director of OWASA, and Charlie Horne, County
Manager of Chatham County, to ascertain their jurisdictions' interests and
concerns relative to the Jordan Lake access issues and to the proposed
September 2 "d meeting. The response from Chatham County is attached.
The response from OWASA will be forthcoming on Friday, August 13", and
will be provided to the Board under separate cover. It is proposed that those
responses be discussed by the BOCC at August 17' meeting and again if
necessary at the August 31" work session.
s
2
FISCAL IMPACT: There is no immediate fiscal impact foreseen for this process. It is
anticipated that the long term fiscal impact, if any, will be based on
decisions the County takes related to the use and cost of any intake
infrastructure needed to access the County's Jordan Lake water
allocation. At this time it is not possible to project those potential costs.
RECOMMENDATION: The Manager recommends that the Board receive the report as
information and advise staff as to any additional information the Board
desires.
Orange County Commissioners
P. O. Box 8181
200 S Cameron Street
Hillsborough, NC 2 72 78 a`
Alice M. Gordon, Chair b► +
Stephen H. HaUdods, Vice Chair o
Margaret W. Brown 17 y�
Moses Cary, Js ya
Barry Jacobs
April 13, 1999
°rib Ceco�`o
Mr. Daniel C. VanderMeer, Chair
Board of Directors
Orange Water and Sewer Authority
PO Box 366
Carrboro, NC 27510 -0366
0""",
Dear NU Vaaderb&co;,
The Orange County Board of Commissioners offers the following comments regarding the local
water supply and water quality protection issues discussed at the October 1, 1998 meeting involving
Orange and Chatham Counties, the Towns of Carrboro, Chapel Hill and Hillsborough, and OWASA.
Clearly our region's explosive growth makes it imperative that all local jurisdictions work together
to protect the quality of all of our natural resources and promote the most environmentally sound usage of
those resources.
Orange County is located in the upper portions of a number of important and environmentally
sensitive water supply river systems. Consequently we are acutely conscious of the need to be judicious
in our efforts to be good stewards of our available water resources, and of the need to work with the local
governmental jurisdictions within and adjacent to Orange County to develop the strategies and
accomplish the goals consistent with that stewardship.
In accordance with this philosophy, the Orange County Board of Commissioners commends
OWASA on its efforts to bring stakeholders in local water supply issues together to discuss issues of
mutual concern. Relative to the issues raised at the October 1" meeting, the Board of County
Commissioners is of course interested in facilitating a solution for Chatham County's water needs. Since
there have been additional discussions on this issue since October 1", it would be very helpful for Orange
County to receive clarification concerning the options open to Chatham County at the present time,
including Chatham County's preferred solution. If an intake on the westem side of Jordan Lake is the
preferred option, then Orange County encourages Chatham County to work with OWASA to develop a
plan to provide access to Jordan Lake water supplies for Chatham County. Any such plan should
You Count In Orange County
AREA CODE (919) 732 -8181 : 968 -4501: 688 -7331: 227 -2031 : FAX (919) 644 -3004
Ext. 2130
4
Mr. Daniel C. VanderMeer
April 13, 1999
page 2
of course ensure that OWASA's and Orange County's potential access to their Jordan Lake allocations be
preserved. Subsequent to development of the plan, and before any efforts to implement the plan, Orange
County wishes to review the plan with Chatham County, OWASA, OWASA's other constituent
governments, and state and federal agencies controlling access to and allocation of Jordan Lake water
supplies.
The Orange County Board of Commissioners is ready to join all existing and potential users of Jordan
Lake water supplies in studying, developing and implementing effective watershed and water quality
protection strategies. The Orange County Board of Commissioners is similarly ready to work with
Chatham County to discuss, develop and implement enhanced watershed and water quality protection
strategies for University Lake water supplies.
If I may provide any additional input or staff assistance, please contact me at your earliest convenience. I
would appreciate your advising the Board of County Commissioners when OWASA has ascertained the
range of options for meeting Chatham County's water needs, including their preferred option.
Sincerely,
Alice M. Gordon, Chair
Orange County
Board of Commissioners
cc: Chatham County Board of Commissioners
34/14/99
ORANGE COUNTY
HILLSBOROUGH
NORTH CAROLINA
J/_. I = Ii /i
July 15, 1999
Mr. Ed Kerwin, Executive Director
Orange Water and Sewer Authority
PO Box 366
Carrboro, NC 27510 -0366
Dear n�-
47-�
r7r6& cam' 3
5
&WaA&4ed>768
As per our recent telephone conversation, I am writing to reiterate Orange County's
willingness to cooperate with Chatham County and other local jurisdictions to facilitate
access to Jordan Lake water supplies and address related water resource issues. We
recognize that Chatham County's longterm al is to develop a permanent capacity to
withdraw water from Jordan Lake on the w side of the lake, probably at or near the
property that has been acquired by Orange er and Sewer Auth . OWASA) for an
intake site. We also ogm - that there e an oppo ocal cooperation
in such an endeav W and a of diction have or
may have an inter , ��: this same
location.
There are a num o _ ssioners
(BOCC) would > "" ocal meeting
to discuss Cha{ t these topics
were outlined ' .r Meer.
Specifically, we hav" "` ons or
explanations of a) Chatham County's current arrangement for obtaining Jordan Lake
water through the Cary /Apex intake facilities; b) the problems and shortcomings of that
arrangement and an assessment of the state's ability to effect a satisfactory solution to
those problems; c) the short and long term effects and implication of the recently
publicized grant funded construction of an interconnection between Chatham County and
City of Durham water systems; d) the options available to Chatham County to access its
Jordan Lake allocation; and e) the access option preferred by the Chatham BOCC. In
addition, we request that OWASA staff develop and present information about how
OWASA's Jordan Lake property could be utilized to provide Jordan Lake access to
Chatham County and other jurisdictions while enuring that its own access and that of
Orange County are preserved.
AREA CODE (919) 732.8181 • 968 -4501 • 688 -7331 • 227 -2031 • FAX (919) 644 -3004
Mr. Ed Kerwin
July 15, 1999
page 2
It will be very important to the Orange County BOCC to be well versed in the details of
issues to be discussed at the proposed September 2"d meeting. Accordingly, we are
requesting that OWASA's background material relative to the topics outlined above, as
well as related topics important to OWASA be made available for BOCC review and
discussion at its regular meeting on the evening of August I Th . It would be very helpful
for any written material to be provided for dissemination to the Board by August 12" and
for OWASA staff to be available to provide clarification to the Board at the 17m meeting.
Please review these issues and requests with your Board and your staff and advise me if
you see difficulties in this matter. Thank you for your consideration of our request.
Sincerely
John /County r., County Manager
ge
cc Alice Gordon
Steve Halkiotis
Margaret Brown
Moses Carey
Barry Jacobs
Charlie Home
6
ORANGE COUNTY
HILLSBOROUGH
NORTH CAROLINA
,a...,, �
July 15, 1999
Mr. Charlie Home, County Manager
Chatham County
PO Box 87
Pittsboro, NC 27312
Dear Mr. ome:
7
&%AzA&kd 4768
As per our recent telephone conversation, I am writing to reiterate Orange County's
willingness to cooperate with Chatham County and other local jurisdictions to facilitate
access to Jordan Lake water supplies and address related water resource issues. We
recognize that Chatham County's long term goal is to develop a permanent capacity to
withdraw water from Jordan Lake on the we side of the lake, probably at or near the
property that has been acquired by Orange ` er and Sewer Authon ( OWASA) for an
intake site. We also recognize that there m e an opportunity f local cooperation
in such an endeavor OWASA and a n " of ocher entis ` dictions have an
interest in accessin an e's availab er suD lv a ation.
• • • ®` ' �a q i+e G` M, • r'� j9t`• i e ti 1 de • r o� x q n� r mt
erlocal
water
allocation. Fort,'O-) letter from
y ♦`;.�h 3„ '� -.'b A Y '�;q i g �. w -t 4,0, Lilt 4`
hair of
OWASA. Sp - � 11 . t aving
Chatham County's si _ �"" - County's
current arrangement for obtaining Jordan Lake water through the Cary/Apex intake
facilities; b) the problems and shortcomings of that arrangement and an assessment of the
state's ability.to effect a satisfactory solution to those problems; c) the short and long
term effects and implications of the recently publicized grant funded construction of an
interconnection between Chatham County and City of Durham water systems; d) the
options available to Chatham County to access its Jordan Lake allocation; and e) the
access option preferred by the Chatham BOCC. Orange County will also be asking that
OWASA staff develop and present information about how OWASA's Jordan Lake
property could be utilized to provide Jordan Lake access to Chatham County and other
jurisdictions while ensuring that its own access and that of Orange County are preserved.
It will be very important to the Orange County BOCC to be well versed in the details of
issues to be discussed at the proposed September 2' meeting. Accordingly, we are
requesting that background material relative to the topics outlined above as well as topics
AREA CODE (919) 732 -8181 • 968 -4501 • 688 -7331 • 227 -2031 • FAX (919) 644 -3004
Mr. Charlie Horne
July 15, 1999
page 2
important to the Chatham County BOCC and a draft agenda for the September 2id
meeting be made available for my Board's review at its regular meeting on the evening of
August 17' . It would be very helpful for any written material to be provided for
dissemination to the Board by August 12' and for Chatham County technical staff to be
available to provide clarification to the Board at the 17* meeting.
Please review these issues and requests with your Board and your staff and advise me if
you see difficulties in this matter. Thank you for your consideration of our request.
Sincerely
M. Link, Jr., County Manager
ge County
cc Alice Gordon
Steve Halkiotis
Margaret Brown
Moses Carey
Barry Jacobs
Ed Kerwin
08,'06/99 15:05 CHATHAM COUNTY MANAGERS OFFICE 4 9196443004 NO.6% P002/004
I
Consulting Engineers 290 S. W Broad Strew
So Mem Pines. N. C 28387
(910) 692 -56/6
MEMORANDUM
TO: Chatham County
FROM: Hobbs, Upchurch & Associates, P.A.
DATE: July 21, 1999
RE: Letter from Orange County requesting an update on water supply from Jordan rake
The following discussion addresses issues raised in a July 15, 1999 letter from the Orange County
Manager to W. Charlie Home.
a. Chatham Casey's current arrangement for obWaing Jordan Lake Waur Waugh the
Cary/Ap= remake facilities. Currently, Chatham County has a water purchase contract with
the Town of Cary/Apex that allows the County to purchase up to 1.0 MGD of raw water
averaged over a month period. The contract terms; indicate that Chatham County's purchase
cannot exceed 1.0 MGD on a monthly average. Typically, Chatham County experiences
seasonal demand increases in the North Chatham System and additional capacity is required
to meet the increased demand. The Town of Cary has provided some latitude for increasing
the County's allowable raw water purchase as outlined in the water purchase contract, This
amount may increase in 100,000 gallon increments and must be requested in writing.
Chatham County has requested increases several tines over the last few years, however, Cary
has declined to grant the County a permanent increase. Cary has permitted the County to
temporarily increase its withdrawal by several hundred thousand gallons a day with the
stipulation that it can be reduced at any time.
b. The problems and shortcomings of that arrangement and an a sesssneist of the State's
ability to effect a sasisjaetory solmioa to Aoseprvbrsams. State and federal govertmient
organizations charged with Jordan Lake regulation and oversight have worked under the
assumption that intakes on Jordan Lake will operate as regional facilities without any
centralized support or incentives. The Corps of Engineer's Jordan Lake master plan was
designed assuming that there would be two regional intakes. The Jordan Lake allocation
process was designed and has been implemented assuming that allocation holders would be
able to access their allocation through regional facilities. Unfortunately, the existing
regulatory fiw wvork does not include any assistance to local governments wishing to
participate in a regional facility. The lack of any centralized oversight has resulted in a ' first
come, fast served" system that favors large financially secure utilities at the expense of
smaller less capital rich utilities.
Cary/Apex's intake facility was initially promoted as a regional intake in which Chatham
County would be a welcome participant, however, in the past few years, Cary has expressed
an increasing reluctance to partnering with Chatham County, especially on a long term
permanent basis. The regulatory bodies and oversight bodies that promoted the intake as a
08/06 /99 15:05 CHATHAM COUNTY MANAGERS OFFICE 4 9196443004 NO.686 P003/004
10
regional facility have stated that they do not have any regulatory influence regarding how
Cary chooses to share its private facility with others.
During the design period of the Chatham County Water Treatment Plant, Chatham County
staff evaluated several different raw water alternatives to serve the plant including a
partnership with Cary as well as an independent intake. Oversight and regulatory groups
such as the state and the Army Corps of Engineers recommended very forcefully against the
construction of a separate intake and urged the County to partner with Cary/Apex. At the
tune, the Cary /Apex intake had a small amount of excess capacity that was dete=tied to be
sufficient to meet Chatham County's short-term needs. Chatham County and Cary signed a
10 year contract with the understanding that future intake expansion efforts would include
Chatham County. The contract clearly stated that Cary/Apex planned on sharing the use of its
facility with others in the future. Since the time the original contract was signed, Cary has had
high growth rates that have resulted in water demands exceeding their Jordan Lake allocation
and their production capability. Cary has mgt=W an increased allocation from the state and
has prepared engineering plans for system upgrades to increase their water supply. The
upgrades include an expansion of the intake.
According to Cary staff, the expansion plan did not take into consideration Chatham
County's needs. For example, the engines working on the project never modeled Chatham
County's usage in preparing the pump design. As a result, according to Cary, the intake does
not have sufficient capacity to serve as a permanent water source for Chatham County's
treatment plant. Cary's position towards a Chatham County partnership is not clear. In some
correspondences, Cary has urged Chatham County to construct their own intake since Cary's
growth projections show that there may not be any long -term surplus capacity in their facility.
In outer responses, Cary has suggested that Chatham County carry out their own engineering
study and propose modifications to the planned intake design for Cary to consider. Neither of
the positions are conducive to regional cooperation and they have resulted in inefficient
planning and needlessly duplicated engineering studies. Chatham county is currently
studying possible design modifications for Cary to consider.
Under the existing framework, Cary/Apex maintains complete control of their intake facility
and they are under no obligation to make their facility available to others. In addition, some
of Cary's political leadership has stated a desire to control growth in Cary by limiting the
expansion of the water system including the intake. This type of restriction, while possibly
acceptable for a private facility, makes the operation of a regional facility almost impossible.
Chatham County has had numerous meetings with officials from, the Division of Water
Resources and the Army Corps of Engineers to discuss the intake. Officials at these
meetings, particularly officials from DWR have been reluctant to become involved in the
situation. The general opinion has been that the intake is a private facility owned and
operated by Cary /ApM and the organizations are unable to control how the facility is shared
or not shared with others utilities
c. The short and long term effects and implications of the recently publicized grammt fronded
consouctiam of an interconnection betwaen Chatham Coawty and City of Durham water
sysrenms. In the short- term, the Durham interconnect will be used to supplement Chatham
County's raw water purchase from Cary/Apex, thereby allowing the County to stay within the
1.0 MGD limit established in the water purchase contract. Long-term, the interconnect could
be used to supply water from Chatham County to the City of Durham. This option is
08/06/99 15:05 CHATHAM COUNTY MANAGERS OFFICE 4 9196443004 NO.6% P004/004
11
contingent upon Chatham County developing a reliable raw water source to supply its water
treatment plant located riznr Jordan Lake.
d. The options available to Chatham county to access its Jordan Lake ARocadon. As
mentioned above, the Town of Cary has offered Chatham County the opportunity to complete
a hydraulic study to evaluate the effects of allowing the County access to its 6 MOD
allocation through the existing raw water intake. Based on the results of the study, the
County may be allowed the opportunity to develop a permanent allocation in the Cary intake.
There is also an opportunity to for the Chatham County Water System to develop an intake
on the East Bank of Jordan Lake, however there are several issues that must be addressed.
First, Cary's intake is located on the east bank. Two east bank intake structures is not
consistent with the US Corps of Engineers Master Plan for Jordan Lake. The Corps has
indicated that it will allow one intake on each side of the lake. Second, there would be
significant environmental issues to overcome and address with regard to a new raw water
intake. And third, the cost of a new intake would be substantially greater than costs
associated with the upgrade of an existing intake.
e. The access option preferred by the Chatham Can" Board of CoxuaisstenerR Orange
County will also be asking that OWASA staff develop and present information about Avow
0WASA I's Jordan Lake property cooed be wdh!W to provide Jordan Lake access to
Chatham County and other jtuisdicdons while ensuring dat to own access and that of
Orange County are preserved Chatham County is extremely interested in developing a
regional intake facility on the West Bank of Jordan Lake. The County would lilac to proceed
with this option in conjunction with other local governmental entities, including
OWASA/Orange County. the City of Durham, and other interested parties. Chatham County
prefers that the North Camlma Department of Environment and Natural Resources assume a
active role in the west bank intake project. This will allow NCDENR to fairly evaluate and
establish allocation amounts. A regional intake facility could also develop into a regional
water treatment facility that could be used to furnish finished water to the participating
entities.