HomeMy WebLinkAboutAgenda - 02-10-2009 - 1ORANGE COUNTY
BOARD OF COMMISSIONERS
WORKSESSION AGENDA ITEM ABSTRACT
Meeting Date: February 10, 2009
Action Agend~a-
Item No.
SUBJECT: Parks /Lands Legacy CIP Follow-Up Discussion
DEPARTMENT: ERCD, P&R, Budget
PUBLIC HEARING: (YIN) No
ATTACHMENT(S):
Twin Creeks Trail -Issue Paper/Map
Project Prospectus -Potential Twin
Creeks Family Recreation Center
Synthetic Turf -Issue Paper
Emerging/Future Issues -Issue Paper
INFORMATION CONTACT:
David Stancil, 245-2598
Lori Taft, 245-2673
Donna Coffey, 245-2151
Pam Jones, 245-2652
PURPOSE: To 1) consider and discuss identified follow-up items from the November 13 and
December 11 Board discussions on parks and Lands Legacy projects, as related to the
Manager's Recommended Capital Investment Plan 2009-2019, and 2) receive and discuss a
proposal for a possible public-private partnership at Twin Creeks.
BACKGROUND: At a work session and regular meeting in late 2008, the Board discussed the
Manager's Recommended Capital Investment Plan 2009-19. As part of the discussion, the
Board identified several topics related to park projects and/or Lands Legacy for discussion at a
future work session.
Staff has organized these topics into three categories for this follow-up discussion, and has
prepared issue papers (attached) for each:
1. Potential Twin Creeks Linear Park (Morris Grove School Trail) -along with a related
alternative proposal regarding a possible public-private partnership at the same site that
has been received.
2. Potential for Collaboration on Synthetic Turf Field Installation
3. Emerging Issues and Future/Other Topics
Twin Creeks - In late 2008, the Board asked staff to investigate the potential for a linear park
along the newly-installed sewer easement at Twin Creeks that runs along Jones Creek and
connects to Morris Grove Elementary School. Subsequently, a letter was received from the
Chapel Hill-Carrboro City Schools apprising the County of interest expressed by Morris Grove
parents regarding a similar trail concept. Several persons attended the January 22"d Board
meeting and commented in support of this concept.
The attached issue paper provides background information about the proposed trail concept(s).
There are two primary options for proceeding with a trail or linear park (although there are no
2
doubt various hybrid options as well). One option, recognizing cost limitations of existing funds
and the cost estimate for a paved greenway trail with span pedestrian bridge, proposes to
construct an interim unpaved trail with ales-expensive bridge over Jones Creek within existing
funds. This may require the Town of Carrboro to accept and approve an interim trail design (if
possible), which could be pursued and accomplished by interlocal agreement. This option could
likely be constructed in a quicker fashion using only a potion of the available funds. A second
option would be more of a true linear park, a 10-foot paved greenway with subsurface base,
landscaping, benches and a larger pedestrian bridge that spans the Jones Creek floodplain.
The engineering consultant hired for Twin Creeks has estimated the cost of this trail on the
County's property to be approximately $850,000. if a natural surface trail were an option, the
cost would be lessened. Town financial assistance for this type of trail, which fits into the
Town's larger pedestrian transportation scheme for the northern transition area, might be
solicited.
The paper also notes several important issues related to the trail concept - 1) there are
intervening properties between the County's Twin Creeks property to Lake Hogan Farms that
will need to provide a connection, 2) the aforementioned cost issues and the question of Town
willingness or ability to approve an interim trail, 3) maintenance, safety and security issues.
Finally, the County has recently been approached by the firm of Recreation Partners (RP)
about the potential for apublic-private partnership at the Twin Creeks site - to build a
sports, recreation and child care/activity center, which could be a combination
indoor/outdoor facility. A Project Prospectus prepared by Recreation Partners, which
manages the Triangle Sportsplex, is attached.
Synthetic Turf Field - A $650,000 portion of the 2001 Parks and Open Space bonds dedicated
as `Soccer Superfund" monies was appropriated to the Twin Creeks project in 2005. However,
the cost of constructing phase I of the park (with four soccer fields) is beyond available funds. In
recent months, the concept of using these funds (current balance of $625,000) to construct a
synthetic turf field at an alternate location has been discussed. The attached issue paper
reviews the history of these discussions and focuses on two alternatives: 1) Smith Middle
School field and 2) Cedar Falls Park.. Key issues to be addressed to pursue one of these
options include the availability of funding if needed to install the field, issues related to Town
approval processes and timing, and health and safety issues associated with synthetic turf
fields.
Emerging Issues and Future/Other Topics -During the CIP discussions and at subsequent
meetings, there have been several other new or emerging topics the Board has identified for
further discussion, as well as wording changes needed to the CIP. The attached issue paper on
this subject lists several of these matters, some of which are proposed for future work sessions.
FINANCIAL IMPACT: There are several potential financial impacts associated with the different
topics in this report. The cost of designing and constructing a trail at Twin Creeks along the
Jones Creek sewer easement may vary dramatically depending on whether an interim or
permanent trail is constructed, the type of trail surface used, and the design of the pedestrian
bridge. The paved permanent trail with engineered span pedestrian bridge is estimated at
approximately $850,000 -with the interim and natural surface costs considerably less (an
estimate for this option is not yet calculated and requires additional discussions with the Town
of Carrboro). The installation of a synthetic turf field at either Cedar Falls or Smith Middle
School field may also vary depending on the degree of Town collaboration. Available funds from
the former Soccer Superfund portion of Twin Creeks project budget total approximately
$625,000. The total remaining funds in the Twin Creeks project budget stand at approximately
$1.48 million.
Recreation Partners has provided preliminary economic impact and development costs for the
proposed Twin Creeks Family Recreation Center. The County would be asked to subsidize year
one start-up costs in the amount of $175,000, which could be foregone in the event of outdoor
programming. The County would also contribute the land at Twin Creeks for the center. The
impact of pursuing this partnership on funding the other Twin Creeks activities outlined herein
(trail, synthetic turf field) will require additional research and assessment by staff.
There are also costs associated with the topics listed in the Emerging Issues section. Moving
park projects up in the CIP will require exchanges to be made with other planned capital
investments. Additional- discussion will be needed on the potential for additional flexibility in the
use of Lands Legacy funds from the 2001 bond (if issued as alternative. financing).
RECOMMENDATION(S): The Manager recommends that the Board discuss each of the three
topical areas in this report, and provide direction to the Manager and staff on the desired next
steps.
The Manager further recommends that the Board consider and discuss the public-private
partnership proposal from Recreation Partners, and direct staff on whether to continue
additional dialogue and conversation about this possible project.
4
Issue Paper
Linear Park /Interim Trail to Morris Grove Elementary via Twin Creeks
February 10, 2009
Backuround
In late 2008, the Board asked staff to look into a linear park concept using some
of the existing funds for Twin Creeks Park from the 2001 Parks and Open Space
bond. In January 2009, a letter was received from the Chapel Hill Carrboro City
Schools (CHCCS) supporting the improvement of a "dirt trail" or path that exists
for walkers but not for children on bikes or in strollers. There is no trail, but staff
believes what is being referenced in the letter is the OWASA sewer line
easement, which was cleared several months back and is just now starting to
come back in grass. On January 22"d, several citizens spoke at the Board
meeting in support of a trail connecting to the school.
It should be noted that the two concepts above may not be the same. A linear
park typically connotes a more "finished" feel, with a paved trail over graded
subsurface base, landscaped shoulders and benches and/or picnic tables. A
natural surface, mulch or gravel trail may or may not involve the same
components.
The adopted Twin Creeks Master Plan (May 2005) envisions two eventual trails
in this area - 1) a trail along the west side of Jones Creek that would be part of a
future Carrboro greenway system, and 2) a more formal school-to-neighborhood
connector trail (known as the "redline" trail), which conforms to the OWASA
easement in the middle of the property -but veers away from the easement at
both ends as it moves north to the school, and south towards to the planned park
entry road.
The Town of Carrboro's Parks and Greenways Master Plan reflects a greenway
trail along Jones Creek. This plan was developed prior to Morris Grove
Elementary (and the Twin Creeks master plan), and does not reflect a connection
there. The Town currently has a consultant looking at connecting existing trails in
Lake Hogan Farms through intervening properties to Twin Creeks.
Approximately $1.48 million is unencumbered from the Twin Creeks project
budget. This includes prior appropriations for the Phase I park project design and
engineering, and stabilization work to the farmstead approved in June 2008.
Some of the remaining design and engineering funds could be redirected to a
trail project (if changes to the approved project contract scope can be
negotiated), possibly increasing the available funds. The total amount includes
funds added to the Twin Creeks project budget from the Soccer Superfund.
Approximately $625,000 of that amount is included in the $1.48 million figure
above.
5
The Newly Proposed Trail on Twin Creeks Property
A trail on the Twin Creeks property to connect from the property's southern
terminus to Morris Grove Elementary within the sewer easement would span
approximately 3350 feet (or 2/3 mile). A trail that conformed to the Twin Creeks
master plan "redline" trail would run west of the Jones Creek sewer easement on
the southern potion of the site and then east of the easement as it nears the
school. A small portion of the middle of the two trails are in the same location, but
most of the "redline" trail would be outside of the sewer easement. The total
distance of the two trails is nearly identical. The attached map shows these _
different trail concepts.
There appear to be two basic options for construction of such a trail either as
requested by the schools and/or proposed by Commissioner Gordon (pending
Town of Carrboro review and agreement).
1. Option 1 - An interim natural surface or aggregate trail that could provide
for bike and stroller traffic until a more permanent trail is constructed.
2. Option 2 - A permanent 10-foot greenway trail, probably paved.
It should be noted that both trails will require a pedestrian bridge crossing over
Jones Creek. A permanent structure would likely be a substantial bridge,
potentially in terms of both span and thus cost. The Town's greenways plan
envisions a greenway trail to serve both transportation purposes as well as
leisure use, and discussions will be needed with the Town as to whether an
interim bridge is acceptable. Town ordinances (and FEMA regulations for stream
crossings) may preclude the possibility of an interim, less-costly bridge -more
information on this possibility will be provided as it becomes available. The long-
term vision in the Town's plan for this trail is one that requires grading, paving,
subsurface base and other work. This, plus the bridge, will make the permanent
version (Option 2) a more costly measure -although the trail surface selection
will affect the degree of that cost.
It is possible that Option 1 could be at least partially constructed by staff and
volunteers (with coordination and oversight), with perhaps an Eagle Scout or
community project for the bridge - if this is permissable. Even a rough estimate of
the cost for this option is difficult to determine, pending clarification from the
Town of Carrboro on the standards and grading that would be required (and
whether other federal floodplain certifications may be needed for the bridge). The
cost will greatly hinge on what type of bridge and associated grading is required,
if this version would be permitted in the sewer easement and stream buffer at all.
Option 2 would require construction by a professional firm, grading and
subsurface work and edging along the trail, and a more permanent bridge. If the
surface is a paved trail, this type of trail on the Twin Creeks site would cost an
6
estimated $850,000 (including the permanent bridge spanning the floodplain as a
substantial part of the cost). If the permanent trail could be a natural or fine
gravel surface instead, this could reduce the cost. There may also be some
potential for community or volunteer assistance in this project, although at a
considerably lesser degree than the interim trail option.
Park benches and trash receptacles placed along the route would add to the cost
- but these are not substantial costs and may be accomplished for less than
$10,000.
Note: nth the installation of the sewer line and the possible willingness of the
Town to consider a greenway in the sewer easement, an opportunity now exisfs
to revisit whether the "redline" trail and a greenway trail inside the sewer
easement are both needed, or whether one will suffice.
Preliminary conversations with OWASA staff indicate the potential for location of
the trail within the sewer easement, pending further discussion, with the
understanding that provision for repairs to the sewer line will be needed -which
could impact or damage the trail.
Key Issues, Questions and Potential Benefits
There are three basic issue categories that must be addressed to implement this
idea:
1. Connection/Parking Issues
2. Cost/Town Approval Issues
3. Operation, Maintenance, Security and Safety Issues
Questions /Issues
Lack of Connection to South/Parking -The County's Twin Creeks property
does not connect to Lake Hogan Farms. Any trail would need to traverse and
have the legal agreement of other properties (as shown on the attached map).
The Town of Carrboro indicates they are currently engaged in greenway planning
that could result in discussions with these property owners, but the timing of this
is not currently known. Until there is legal access and a trail on one of these
properties, any trail built on the County's land would terminate onto private
property and not connect to the south. A possible interim solution could
involve a looped end to the trail at the southern end of the Twin Creeks site,
where benches and perhaps signage might be situated, with trail users then
returning to Morris Grove School along the trail. It is assumed that any parking
needed for the trail use would come from the school parking lot.
Cost /Town Approval Issues -Sufficient funding may exist to construct the
linear park as a 10-foot paved trail with span pedestrian bridge on the Twin
7
Creeks site -and still allow for the potential use of Soccer Superfund monies
elsewhere. As noted above, a paved version of a permanent greenway trail is
estimated to cost approximately $850,000. However, the Town of Carrboro will
need to answer several questions in order to evaluate this further.
• Will the Town insist on this type of paved trail, or allow for the less-
expensive Option 1 (an interim trail in the easement and stream buffer)?
Either option may require waiving some stream buffer rules and other
ordinance provisions (and perhaps federal floodplain exemption).
• How much additional grading and subsurface work will be required (which
significantly increases costs) for anon-paved interim trail? Will the trail be
required to be ADA-accessible (this affects the trail surface decision)?
• Will the Town allow for an interim (Eagle Scout-type) bridge in the short-
term?
• Can this be accomplished in advance of the future approval process for
the park? An interlocal agreement for this project may be an option.
Operation, Maintenance Security and Safety Issues - An assessment will be
needed to determine whether sufficient staff exist to monitor and maintain the
trail on the Twin Creeks site. This assessment would also need to address the
operational costs and expectations. Additionally, the trail is considerably removed
from Old 86 and is in a wooded, undeveloped natural corridor -with no road
connections at present. Will this create safety issues?
Finally, a trail in the sewer easement would link in the middle of the site to the old
farm road, which leads to the barn and outbuildings (where stabilization work is
underway). Will this create security concerns for the buildings, or liability and
increased vandalism potential?
Possible Benefits
Showing Results from the 2001 Parks and Open Space Bond - As recently
noted, Twin Creeks is the one project from the 2001 bond where no activity is
underway toward construction or opening of the facility (there is work underway
on building stabilization). Constructing a linear park and trail within the sewer
easement would show results from the bond funds, likely within the currently
available funds.
Coordination with the Master Plan - A trail in the sewer easement is not
inconsistent with the master plan, but was not envisioned to be the main
connection to the school. However, the sewer easement may have presented an
opportunity to revise the plan. If a trail is not within the sewer easement, the
northernmost and southernmost segments of the trail must be designed in a way
mindful of the future school facility and park construction on the site, to ensure
the trail is not located in a way that constrains future plans.
8
Town and/or Community Participation -The construction of a permanent trail
(designed for transportation as much as leisure) connecting Lake Hogan Farms
to Morris Grove Elementary is a broader function than serving Twin Creeks Park
and educational campus, and more a pedestrian corridor serving a larger
northern Carrboro community need. Should the Town participate in the cost and
construction of such a greenway? Should the Town maintain and operate the
trail? Additionally, there appears to be community sentiment toward volunteer
assistance in the trail construction, which could lower the project cost.
Possible Options for Linear Park
1. Ask Town to Allow Approval and Construction of an Interim Trail (using
existing funds -Option 1)?
2. Pursue Permanent Greenway Project (perhaps with Town financial
assistance requested -Option 2)?
A recommendation on the type of trail surface for both options will substantially
affect cost, and help inform discussions/negotiations with the Town.
"No-Build" /Deferral Options
3. Construct Original Trail (Redline Trail) at a Future Date as Shown on
Master Plan (when full funding exists)?
4. Defer Project to Phase I of the Park (when additional funds exist)?
0
5
~;
O
~ ~_, ~r ~7~\ >tdd e c _N I I
J
~L ~ ~ ~
I ~
-y~ ~s~nnnni ,% ~~ I1
- `--~IUL~LJU ```.~ --__ f
O
lementa
Sch ~~_;\~
i ~~
~~ ~~
\\ \ / ~11~
~~/ r5~~`r~ I I
\\ ~~ _1 ~~
,~,~~ Future ~ 111
'`~.. ~ ~ 1 Shoot Srte I
n
MI Homes l
Subdivision ;
ti 1
-~, Jone ~'
~` ~ ~abdivisiop'(
i
1, ,
;,~ _ --l ~,~!
Twin Creeks Park ~
` and
Surrounding Area
Proposed Connector Road .
Duke Forest LEGEND
~~Exlsting Greeenway
~~~Proposed Greenway Link
Carrboro's Proposed~Gros~enway
Sewer Easerrlent
~.~. ~Propoaed Greenway
Proposed Redline FL'n Master Plan
~~r~Posslble Greenway
--- Sewer Line
- _, __~
--- '11
11
~~' 11 '
II '
~ 11
fl
Future II
School Facility r i Leak
V 1 '~..,
ll
11
l II l
i 11 t
I I -'
11
I1
I
1V
44
11
.. 11
11
$ l II
O° t 11
11
II
li li Hogan
__ It
` 11
1 ~1
1 II
II
1
l l !,!
' . Hogan ~ i ~
~~
~~
i~
1 `'
,~
_ . ~:. \
~~~._ TaLLy6o it
Exisring '
Townhomes r
~~
'`~_ _"oa
~'~ - ~ /`•
Existing
Lake Hogan Farms
Subdivision
10
Project Prospectus prepared for Orange County
Twin Creeks Family Recreation Center
Executive Summary
Purpose
To build a sport, recreation and child carelactivity center utilizing aprivate/public partriership between Orange County and Recreation
Partners on the County owned Park Property known as Twin Creeks. This could be a combination outdoor and indoor facility.
Back4round
It is assumed that there is a strong demand for quality recreation, child care and activity based services for the growing needs of Orange
County residents. Outdoor fields can support some of this demand but there remains a need for seasonal infrastructure as well as providing
a safe and environmentally protected environment for the needs of young children. The indoor facility also contemplates a hardwood gym for
related activities under the assumption this type of space is also in scarce supply throughout Orange County.
Recreation Partners (RP) has a proven track record operating the Triangle Sportsplex without seeking additional County fundslsubsidies to
sustain operations.
RP has a long history of being NC's leading provider of quality recreational sports and programming in a family friendly, safe and clean
environment.
Programming includes early childhood development programs, youth and adult training and leagues across multiple sports. RP facilities offer
a wide range of sports activities: Soccer programs for youths starting at the age of eighteen months and adults, lacrosse, basketball,
volleyball and baseball programs. After school, summer camp and intersession programs provide an active alternative to traditional day care
programs.
Proiect Scope
RP Deliverables:
• 60,000 Square feet in-door Turf, Court and child camp facility.
• Building constructed by a RP partner builder of commercial buildings in the Triangle for over 35 years.
• Building, Up fit and Sports Equipment provided as a complete Turnkey.
County Deliverables:
• Orange County to subsidize $175,000 Year One Start-up Costs. Project fully breakeven Year two onward.
• Contribute land to the project.
Optional Synergies:
Potential further synergy with RP providing all outdoor programming (it is projected that if the Outdoor programming
were to be part of the publidprivate partnership that the incremental revenue from the outdoor fields to the venture would
make the project breakeven at year one and not require the $175,000 first year subsidy.
Potential to add a seasonal outdoor ice rink as a major Oranae County destination attraction. This could be
operational by Fall 2009.
11
Location
Twin Creeks Park. The indoor facility use would be approximately five acres on the Park site plus shared parking. Residents would have
access to state-of-the-art in-door recreation amenities in their own community creating a less intensive use than previously planned for the
si#e. The proposal is to place a 60,000 sq.ft. concrete tilt up building with an attractive fagade and to provide all required fit up and sports
infrastructure equipment, all as a tum key recreation facility. Since the majority of the use is after school and on weekends this use
encourages less traffic impacts at peak hours. We would expect additional synergies to be created with the County's planned outdoor park
facilities on the same site, including the feasibility of RP managing the recreational facilities (soccer fields and baseball/softball) to maximize
staffing and site synergies.
Economic Impact
New employment with RP
6- 8 Full Time
40 Part Time
45-60 Contractor Employees
Estimated Annual Payroll for Twin Lakes
Estimated Annual Contract Employee Compensation
Estimated Capital Investment
$250,000
$250,000
$4.85million funded by RP secured by long term lease with OC
Economic Impact of Special Events and Tournaments (optional depending on traffic and parking constraints)
(does not reflect restaurant and other spending)
Participants
Adult Soccer Toumaments 300
Football Combines 200
Soccer District Tournament 500
Independent Youth Soccer Toumaments 750
Soccer/Basketball Development Camps 300
Regional or Sectional Soccer Events 400
Private Soccer Camps 400
Private Basketball Camps 400
Spectators Hotel Rooms Duration
600 200 3 days
400 200 6 days
2000 500 5days
2000 500 3 days
600 300 3 days
2,000 500 5days
400 n/a 5days
400 300 5days
Benefits to the Community
Fitness and Health - Activity and sport related programs for all ages, ranging from teaching children good fitness and health habits to
developing plans for adults for an active lifestyle and healthy aging and longevity.
Publiclprivate partnership -for local residents to use the facility and use of County owned land for recreation
First class recreation, child care and sports competition opportunities -After school care, summer camp and early childhood
development based Lil Kickers soccer and Lil bunkers basketball. Soccer, basketball, lacrosse, volleyball, ball hockey, baseball, flag football;
Tumble Bees intro gymnastics and cheerleading, triathlon, and disabled sports.
Opportunities for partnership with US Paralympics, USA Baseball, US Soccer, local Basketball Camps and Clinics, Soccer Tournaments,
Kids Gym and Gymnastics programs, Football Combines, Cheerleading Camps ,and local Colleges.
12
Issues/Concerns
1. Traffic
• For similar facilities, we have performed in depth studies through Kimley Hom and Associates as to traffic
patterns. For all non tournament activities, traffic is uniform, steady and limited to activity participants. Hourly
participation is generally limited to those engaged in the specific activity and if there are spectators, they
typically travel in the same vehicle as the participant. Allowing for all those engaged in hourly particpation,
plus those coming and going, the maximum amount of traffic per hour for the indoor facility is 120 cars.
If traffic (and parking) is a concern, the only activity in excess of the above comes from tournaments where
there are additional spectators. Tournament activity replaces the normal hourly activities at the. indoor center
and is only contemplated if the community desires this type of activity for the economic impact on neighboring
restaurants and hotels or for the high community profile from hosting such events. However it does not
significantly impact the revenue for the facility since the time allotted can be substituted for routinely scheduled
sports and recreational activities. If the community is concerned about the extra traffic, or if the facility has
parking limitations, approval for construction of the facility can restrict use for tournaments (and no outdoor
seasonal rink).
2. Parkin
It is assumed that the existing site plan allowed for parking for the contemplated four outdoor fields. The
revised plan to include the indoor field replaces two outdoor fields with two indoor fields. While an indoor field
significantly extends the possible uses and season length of fields, its existence just substitutes the already
required parking for outdoor use. However, it is conceded that the indoor facility has more flexible usage and
will attract additional participants and therefore based on Kimley Horn traffic analysis for similar facilities,
maximum parking required for the indoor facility is 125 paces. As noted, since parking was already required for
the outdoor field, it is estimated that the incremental parking for changing the use from outdoor fields to indoor
is a modest 65 parking spaces. It is offered that the incremental cost of this parking can be absorbed in the
overall site and construction costs as presented.
Timeline
TBD. If approved Construction could commence Q 3 2009. Q3 2010 Occupancy
Page 1 of 2
13
UpOATES & t1/EIVTS:
Adult Soccer
Leagues start 2!15!!1
Adult Flag Football
Leagues start 2H9!!1
More Special Events
Register ordine loday!~~ ~ ..rv
e~.
„,#
e~ w ~ __ ~: 7 _ of _.. w _- _. ~ _-,
a _ .._ ~
t-err.r
.: s .SE
r,,~,~ .,.._..,.,-.,~ ~ ,
'. ~ ~ - .. , ~ --- e~~) ~ ~~,E. E~w,.,~,
_ ~. -
~~ 1
H
. -•
-__
,- qr~,t _ _ -_
_ ~~ ~--
.~ J .. ~ ~.
http://v~~vw.charlottesportscenter. com/about/touresc. shtml
1 /29/2009
Page 2 of 2
14
r~ ~
f
~` ~ ~ ~`
it r~K ~ ~ \..^fY ~•~ ~
~~ ~~ _~
a~R~"V S ~ ~ ~ , ~ ,~ _
Li4' `~~. f~f: ..a t~ 't
~~ _y it . ~ u .r
r
i
,• +k'! Jet fl - ', ~ ~Vn ~~
Ilr ~ 4.: ~'! y
~• h
~•~
®2001-2009 Chadotle Sport Center (704) 597-7311 ~ ~ "";.f.J~ ('~ Designed 8 Developed by Metheney Consulting
JrS,It 1 3! ,!!~l
htt„•//~xn7acx7 ~harlnttvcrtnrtcrantPr rnm/ahnnt/tnnrrcr chtml ~ /~4/~nn4
15
Outdoor Seasonal Covered Ice Rink
9l
~~.
17
18
Issue Paper
Synthetic Turf Soccer Field Development
at Cedar Falls Park or Smith Middle School
February 10, 2009
Background
In late 2008, the Board asked staff to look into a synthetic turf soccer field project
using the remaining soccer superfund money from the 2001 Parks and Open
Space bond. In 2007, members of the soccer community brought the idea of
synthetic turf fields to the attention of .the board and staff was asked to look into
the possibility of such a project at the Smith Middle School field(s.) At that time
there was a potential private partner who had offered up to $600,000 in
assistance. Additional sources of funds for the estimated $1.624 million dollar
(two field) project had not yet been identified. Estimates for just the one
municipal field were $856,000.
The potential partner wished to have usage fees waived in exchange for their
donation. The Town of Carrboro is responsible for issuing permits and collecting
fees for field usage at Smith. The project, within the Towns jurisdiction, would
also have been subject to the Town CUP process and the likely requirement for
engineering drawings and water quality studies.
In February of 2008, the Board of Aldermen decided to take no action on
approval of the requested fee waiver, waiver of applicable town fees and general
approval of the project. This decision was brought to the attention of the BOCC
and served to effectively stop work on the project at that time.
Since 2007, the funding offered by the private partner has been designated for
use elsewhere. No other source of funding has been identified.
Continuing Discussions with Carrboro about the Smith Middle School
rp olect•
Renewed interest may have arisen among members of the Carrboro Town board
and Town staff. In fall 2008, at a meeting of the Board Chair, Vice-Chair and
Manager with the Mayor and Manager of Carrboro, the potential for revisiting the
concept of synthetic turf at Smith field was discussed, and the Town expressed
willingness to receive another presentation and reconsider the topic. If the Town
is willing to enter into a partnership with the County in some way, the idea could
be further developed.
19
Providing a Soccer Superfund Grant to the Town of Chapel Hill for
conversion of softball fields at Cedar Falls Park to a synthetic surface
soccer field.
Providing the remaining soccer superfund money to Chapel Hill for this project
would fall in the category of matching grants within the BOCC approved Soccer
Superfund Policy and Guidelines. Technically, the Board would have to return the
funds to the Soccer Superfund, and then allocate them to Chapel Hill. If the
$625,000 remaining funding were made available, Chapel Hill would be required
to match this funding. The majority of additional guidelines or conditions within
the Soccer superfund Guidelines document could most likely be met if an
application were to be submitted by the Town.
Key Issues, Questions and Potential Benefits
There are three issue categories that must be addressed to implement this idea:
1. Available funding
2. Town Approval Issues
3. Health Issues
Questions /Issues
Available funding -What would the source of funding be for the amount above
remaining soccer superfund money ($625,000) needed for the Smith option?
($250,000-1 field or $1,050,000-both fields.) Can the grant match be met by the
Town of Chapel Hill for the Cedar Falls option? The 2009 PARTF grant
application deadline has past. Chapel Hill proposes to submit an application with
the next cycle.
Town Approval Issues -Would the County receive assurance of a commitment
to timely development of the project by either jurisdiction? Would permitting and
required studies add to Orange County's cost? In 2007 Carrboro was reluctant to
cover/waive required fees and studies for the Smith project. Chapel Hill
proposes engineering be completed in-house and states that they are not
required to pay their own fees.
Health/Safety Issues -Last spring, an alarm was raised throughout the country
regarding certain health risks associated with synthetic turf products. A study of
several fields was conducted in New Jersey, and two were found to be potentially
hazardous due to the age of the fields. Over time, the recycled rubber tire infill
used breaks down into smaller particulate matter, which can be inhaled or
ingested. In addition, a study conducted by the Connecticut Agricultural
20
Experimental Station concluded that the tire crumbs release chemical
compounds into the air and ground water. Many studies conducted by the CDC
and others have determined that inhalation or ingestion of this material is
dangerous. High levels of lead were found in the older fields studied, which if
inhaled or ingested can cause adverse health effects including developmental
delay and behavior problems.
The CDC also stated "The risk for harmful lead exposure is low from new fields
with elevated lead levels in their turf fibers because the turf fibers are still intact
and the lead is unlikely to be available for harmful exposures to occur." They
also added that " At this time, CDC does not yet understand the potential risks
associated with exposure to dust from worn artificial turf." The June 2008 CDC
Health advisory does not recommend discontinued use of synthetic turf facilities,
but instead recommends precautions for the field manager and the user.
Alternative infill options have not been found. The use of recycled tire material
appears to be standard in the industry. Each manufacturer claims that its
product is "safe" and installations continue to occur all over the country. UNC
recently replaced the turf on its Fetzer Field with a product containing recycled
rubber tire infill.
It seems likely that these products can be safely used with responsible
management and with a commitment to replacement close to warranty
expiration, which is typically 8-10 years. Continued use often occurs well beyond
the expiration of manufacturers warranty periods. It would seem prudent that
testing should be undertaken at this point to determine whether the infill products
or the turf itself is breaking down to the point that it might pose a health hazard.
Replacement costs typically run about half of the cost of the original installation.
Potential Benefits
Showing Results from the 2001 Parks and Open Space Bond - As recently
noted, the Soccer Superfund is one of the projects from the 2001 bond where
funding remains unspent. A portion of the funds was allocated and has been
spent on the West Ten fields. Using the remaining funds for the most viable
project that is closest to shovel ready would benefit the soccer community.
Possible Town Involvement - Either project would require full approvals and
partnerships to some degree with the respective town.
21
Possible Options for Remaining Soccer Superfund Money
1. Provide a Soccer Superfund Grant of $625,000 to the Town of Chapel Hill
for the Cedar Falls project. The transfer of funds would not occur until the
conditions of the grant application as determined by the BOCC were met.
2. Allocate $625,000 for the development of one or two synthetic surface
soccer fields at Smith Middle School. Determine source(s) of additional
funding required to complete the project.
3. Reserve remaining Soccer Superfund money for Twin Creeks or the next
soccer project ready for development.
22
Issue Paper
Emerging Issues and Future/Other Topics
February 10, 2009
During the Board CIP discussions in late 2008, there were several other
emerging issues, CIP additions and future topics for discussion that were
identified by the Board. These include:
1. Timing in the CIP of Bingham Park and Hollow Rock /New Hope
Preserve
Some Board members expressed interest in revisiting the timing of these projects
in the recommended CIP. Moving the projects up will require exchanges with
other capital investments in the Plan.
2. Funding Source for Future Farmstead Stabilization and Renovation
at Future Park Sites
At a previous worksession, some Board members identified the need to look at
the appropriate funding source for future stabilization and renovation work at the
Twin Creeks and Blackwood farm future park sites.
3. Prioritization of the Mountains to Sea Trail for Lands Legacy
Program
Agreement on the trail corridor, and prioritization of the MST project for the Lands
Legacy Program is needed, and will be programmed for a future Board
discussion.
4. Future Use of Remaining Lands Legacy Bond Funds
The possibility of additional flexibility in the use of Lands Legacy 200'( bond
funds (if issued as alternative financing) was noted by Board members at a
recent meeting. This discussion may also include consistency with the 2001 bond
educational materials. This topic would also be scheduled for a subsequent
worksession.
5. Wording Changes to CIP Items
At the two discussions in late 2008, the Board asked that two CIP line items,
"Reserve for Future Land Purchases" and "Mountains to Sea Trail" be adjusted to
read "Lands Legacy/Reserve for Future Land Purchases" and "Lands Legacy /
Mountains to Sea Trail," respectively, and that the project description reflect the
change. These changes have been made to the Recommended CIP and will be
reflected in future editions.
6. Discussion of the New Hope Park at Blackwood Farm Master Plan
The Board asked for this master plan, which has been received but not
discussed, to be brought back for worksession discussion. The item was
tentatively slated for this worksession, but has been shifted to a subsequent
23
worksession due to the timing and complexity of the other topics. The master
plan will be scheduled for a future Board discussion.
7. Appropriation of Remaining (leftover) Funds at 2001 Parks Bond
Projects
Remaining funding is expected to exist for the Smith Middle School (field lighting)
project and perhaps other sites, where final project construction has or is
expected to come in under budget. Discussion of appropriation of these funds
would be scheduled for a subsequent Board worksession, once exact amounts
are finalized.