HomeMy WebLinkAboutAgenda - 01-22-2009 - 6a ORANGE COUNTY
BOARD OF COMMISSIONERS
ACTION AGENDA ITEM ABSTRACT
Meeting Date: January 22, 2009
Action Agenda
Item No. Co q
SUBJECT: Approval of Community Advisory Group and Site Selection Evaluation Process
Update - Orange County Transfer Station
DEPARTMENT: County Manager's Office PUBLIC HEARING: (Y/N) No
Solid Waste Department
ATTACHMENT(S): INFORMATION CONTACT:
Community Advisory Group Recommendation Laura Blackmon, County Manager, 245-2306
Consultant Property Assessment Process Gwen Harvey, Assistant Manager, 245-2307
Waste Destination Memo Gayle Wilson, Solid Waste Director, 968-2885
PURPOSE: To present a proposal for creation of a Hwy 54 Transfer Station Community
Advisory Group, to provide an update regarding progress on evaluation the two transfer station
sites and to provide follow-up on other information requested by the BOCC at the December 11,
2008 meeting.
BACKGROUND: At its December 11, 2008 meeting the BOCC selected two candidate sites to
be further evaluated. The two sites were:
Site 056 — 0.7 miles west of Orange Grove Road on NC 54 (West 54, LLC) — 142.7 acres
Site 759 — 0.3 miles west of Orange Grove Road on NC 54 (OWASA) —43 acres
The Board requested that staff:
- develop a proposal for creation of a Community Advisory Group, including a charge
- provide an update at the January 22 meeting on progress with the site surveys,
evaluations and assessments
- provide information regarding possible destinations of the transferred waste
- provide information regarding plans to manage the waste should the transfer station not be
completed by the time the landfill reaches capacity
2
Develop a proposed charge and composition for a proposed community advisory group,
including proceeding with advertising for potential members, to help address issues and
concerns related to the operations and impacts of the solid waste transfer station:
Olver, Inc. has proposed organizing a Community Advisory Group (CAG) composed of residents
living in the vicinity of the final transfer station. The purpose of the CAG would be to provide a
pathway to directly connect the impacted community with the consulting team, Solid Waste
Management, County Management, and the Board of County Commissioners. Volunteer
membership would be solicited through an open invitation to attend a public informational
meeting. Members would be expected to serve as conduits of news, information, and concerns
to and from their neighbors and affiliates. The CAG would be singularly focused on working with
the County to help ensure the transfer station will be the best it can be in design, development,
and operational standards. The optimum size for the CAG would 10-20 residents, but no willing,
committed participant will be turned away.
Please see attached memorandum (Attachment 1) from Olver, Inc. regarding establishment of
the Community Advisory Group for more detailed explanation of the purpose, charge, formation,
selection/make-up, schedule, duration, and meeting facilitation.
Report on Progress of negotiations, appraisals, surveys, assessments etc. for the two
sites:
• Certified letters were sent to each of the two property owners on December 22 notifying
them of the BOCC's decision on December 11 and requesting permission for on-site
evaluations, surveys, etc. The Site 056 owner responded in a letter dated December 26
that only after the County Manager "meets with West 54, LLC member in person and
commits to a contract to purchase" will West 54, LLC then review Orange County's
request to enter the property. On January 7 Orange County sent a second letter to West
54, LLC acknowledging receipt of the denial of authorization to enter the site and issued
a 30-day right of entry notice pursuant to NC General Statutes, effective February 6.
The Site 759 owner, the Orange Water and Sewer Authority (OWASA), has indicated that
the matter will be discussed by the Board of Directors at the January 22 meeting,
therefore permission has not yet been granted. County staff met and discussed
anticipated on-site activities with OWASA staff on January 12. If OWASA's Board denies
entry to the property at the January 22nd meeting, then presumably 30-day right of entry
notice would be issued with a further delay in entering the property until late February.
• The current delay caused by the refusal of entry for Site 056 will delay conclusion of the
assessment/negotiation activities until about April 1, possibly allowing for discussion and
site selection decision at the April 7 BOCC meeting. Further delay caused by a potential
OWASA denial of entry would add approximately 2-3 weeks to that schedule, possibly
delaying presentation to the BOCC until the May 5 meeting.
• Staff is finalizing negotiations with Cushman & Wakefield of Cary, NC to conduct property
appraisals of the two sites. Cushman & Wakefield indicates it can complete its work on
both sites within 35 days of authorization to proceed.
• Summit Engineering of Hillsborough is currently under contract to the Solid Waste
Department for surveying services and can respond expeditiously following authorization
to proceed.
• Olver has provided an attachment (Attachment 2) that details its site evaluation and pre-
permitting process and status.
3
• A Surface Water Identification Request for each site has been submitted to the Orange
County Erosion Control Division.
• Since the two candidate sites are in such close proximity, the surveyors, appraiser, etc.
prefer to conduct their work simultaneously. Therefore, the 30-day delay for Site 056 will
also delay the work on Site 759.
Provide information on potential landfill destinations for the waste from the transfer
station:
Olver, Inc. prepared in the spring of 2006 a summary of private landfills within 150 miles that
could be considered as disposal options by the County once a proposed transfer station site
was selected and under development. A total of ten possibilities were identified, under
ownership of Allied Waste, Republic Services, Waste Management, and Waste Industries in
North Carolina and Virginia. The complete list and accompanying map are provided in the
attached memo (Attachment 3) dated April 5, 2006.
Provide options/plans to process and dispose of solid waste in the event that the landfill
reaches capacity and a new transfer station has not yet been completed:
Staff and its technical consultant, Olver, Inc. are presently evaluating specific temporary transfer
options, including examining various other temporary transfer methodologies that have
occurred, evaluating engineering requirements, costs, operational efficiency, and consulting with
local and state permitting agencies. It is expected that several weeks will be required to finalize
and narrow the most practical options. It is anticipated that whatever ultimate temporary
operation is adopted by the BOCC, it will be located, if possible, at the Eubanks Road landfill to
simplify state permitting and operations. While it is becoming increasingly likely that a
contingency plan will be required given the increasing likelihood that the transfer station will not
be available in time caused by delays in entering the candidate site properties, the current focus
and priority is on conducting the site evaluations, establishing the citizens group, etc. Once a
final site is approved and staff can better gauge the facility development timeline, the County will
be much more able to prepare a specific contingency plan.
FINANCIAL IMPACT: There will be substantial costs to the County in the overall land
acquisition, design and development of a selected site and the permitting and construction of
the actual facility along with any ancillary features the BOCC may authorize. There are also
costs associated with the various surveys, appraisals and other site evaluations that involve
outside vendors and consultants.
RECOMMENDATION(S): The Manager recommends the Board:
1. Receive the agenda material and attachments;
2. Provide any further directions and feedback to County Management;
3. Approve the Community Advisory Group recommendation from Olver, Inc., as described
in Attachment 1, and authorize Solid Waste Management and Olver, Inc. to initiate and
advertise the first open public meeting to recruit interested volunteers.
4
ORANGE COUNTY
TRANSFER STATION
COMMUNITY
ADVISORY GROUP
JANUARY 2009
Prepared for:
Orange County, North Carolina
Chapel Hill, North Carolina
2
th eaK°N.%
Prepared by:
II4
OLVER
INCORPORATED
www.olver.com
Project Number 20151
5
Community Advisory Group
TABLE OF CONTENTS
PAGE
1.0 Background 1
2.0 Purpose and Charge 1
3.0 Formation of the CAG 2
4.0 Committee Selection and Make Up 3
5.0 Schedule 3
6.0 Duration of the CAG 3
7.0 Meeting Participants and Conduct 4
6
Community Advisory Group
1.0 BACKGROUND
In 2007, the Orange County Board of County Commissioners (BOCC) initiated a process to
identify suitable sites to locate a municipal solid waste transfer station. Two sites have been
identified for further assessment and negotiation with landowners. The expected result is the
purchase of one of the sites. The two sites are nearly adjacent parcels of land located on
Highway 54,west of Carrboro.
At the time the proposed sites were selected, the BOCC expressed a desire to organize a
Community Advisory Group (CAG) made up of residents living in the vicinity of the
proposed transfer station sites.
2.0 PURPOSE AND CHARGE
The purpose of the CAG is to provide a pathway to directly involve Orange County citizens
in the transfer station project. Although the group is designated as an advisory group, it
should be a working group that will be expected to address issues, gain an understanding of
solid waste issues and options, and work with the solid waste staff and consultants to
implement the solid waste transfer station.
The proposed charge to the CAG is as follows:
1. The CAG should assist the Orange County solid waste staff and solid waste
consultants in the development and implementation of the Orange County Transfer
Station.
2. The CAG should provide a conduit for information, communications and dialogue
between neighborhood groups and citizens living in the area of the proposed transfer
station site and the Orange County solid waste staff.
The CAG is intended to be a positive link in the relationship between Orange County
government and the citizens it serves.
The CAG should be charged with the task of facilitating communications between the
County and the neighborhoods. Members of the group should attend neighborhood meetings;
communicate with other residents in the community; present reports on CAG activities; hear
suggestions from neighbors; and bring suggestions, complaints, ideas, and recommendations
to the CAG meetings.
7
Community Advisory Group
The CAG enters the project at its current stage of development;therefore,it should not be the
charge of the CAG to revisit the site selection process or to reassess the selection of the
proposed sites.Nor is the charge of the CAG to assess or pursue the County's long-term goal
of implementing alternate solid waste processing technologies and disposal options.
The CAG should be singularly focused to work with the County to make the Orange County
Transfer Station the best that it can be and that the design, development, and operations
reflect the desires of the surrounding community to the fullest extent possible.
Although there are budgetary, technical, and permit requirements that govern the
development of the facility, there are technical options as well as many non-technical
decisions and choices that must be made during the implementation period prior to the
opening of the Transfer Station. The CAG will play an important role in guiding these
decisions.
3.0 FORMATION OF THE CAG
The CAG should be formed on the same model that Olver Incorporated has developed and
used successfully in previous solid waste public participation projects. The steps needed to
form the group are as follows:
1. Advertise an open Public Meeting that all interested citizens can attend in local
newspapers and/or other local media. The purpose of the meeting will be to discuss
the formation of a CAG to assist Orange County in the development of the Orange
County Transfer Station(see Attachment No. 1).
2. At the Public Meeting, the purpose, charge, and function of the CAG will be
explained. An invitation will be extended to citizens who would like to participate in
the group. Those wishing to participate will be given a form to fill out to provide
their contact information and desired meeting times. The forms will be collected at
the meeting.
3. Citizens who turn in the form will be contacted and invited to the CAG
Organizational Meeting.
4. The Organizational Meeting will primarily consist of:
• Restatement of the charge of the group and what it represents.
•�
°«. (.0e 2
8
Community Advisory Group
• Setting dates,places,times,and meeting intervals.
• Discussion of project status.
• Discussion of how the group can accomplish their goals.
• Distribution of solid waste educational assignments.
• Other activity will be contingent on the status of the project at the time of the
meeting(see Attachment No. 2).
4.0 COMMITTEE SELECTION AND MAKE UP
The Committee members will be selected from volunteers who come to the Public Meeting
and turn in the forms or express in some other way that they want to be a member to the
group. No person desiring to participate will be denied the opportunity to take part in the
group. An optimum number of participants would be in the 10 to 20 range but number of
participants will not be limited to any given number. Members ideally should be limited to
those living in the areas near the proposed transfer station sites on Highway 54 west of
Carrboro.
The individual CAG members would need to be able to commit, at a minimum, two hours
one night per month and some additional time during the month to interact with their
neighborhood organizations. See Attachment No. 3.
5.0 SCHEDULE
The CAG needs to be in place and active in the process as soon as possible. Once the site is
purchased, activities related to permitting, site layout, facility design, and construction will
began to move along quickly. It is anticipated that the group will need to meet monthly
during the permitting and design phases of the project. The CAG should remain active
during the operations phase of the transfer station but may not meet as often.
6.0 DURATION OF THE CAG
Ultimately, it will be up to the members of the group as to how long they want to participate.
However, it is expected that during the implementation of the project, the group would meet
at least once per month, more often only if needed. When the transfer station is completed
and operating, the need for the group to meet may be less often. It is anticipated that the
group would continue'to function as long as the transfer station is in operation.
,•'. c.:•' 3
9
Community Advisory Group
7.0 MEETING PARTICIPANTS AND CONDUCT
The CAG members—Chair and conduct the meeting per the agenda.
Orange County Solid Waste Staff—Gayle Wilson—Provide information, updates, comments
on County actions regarding the transfer station.
Olver Incorporated — Louis Watts — Work with CAG to provide resources (materials,
drawings,maps, speakers on pertinent topics, etc.),facilitate meetings,work with chairperson
to develop agendas, and keep meetings on track to reach goals. Provide details on status and
progress of the transfer station project including drawings, photos, maps, etc. Conduct site
tours and provide general solid waste consulting services(see Attachment No.4).
e
1'4E...:� 4
10
Community Advisory Group
ATTACHMENT NO. 1
NOTICE OF
OPEN PUBLIC MEETING
A Public Meeting will be held on
at p.m.,
at the
to organize the Orange County Transfer
Station Community Advisory Group,
which will consist of members of the resi-
dential and business community in the
vicinity of the proposed Solid Waste
Transfer Station sites on Highway 54 West
of Carrboro. The group is being formed
under the sponsorship of Orange County
for the purpose of addressing issues that
may arise during the development of the
transfer station facility.
If you are interested in learning more
about the function of the group or partici-
pating in the group, please attend this
public meeting. For more information,
please call
ct,
11
Community Advisory Group
ATTACHMENT NO. 2
Orange County Community Advisory Group
{Meeting Location)
{Town),North Carolina
Thursday,February 12,2009
7:00-8:30 p.m.
AGENDA
Organizational Meeting
I. Introductions
H. Restatement of the Charge,Responsibilities,Expectations of the Group
III. Meeting logistics—when,where,how often,communications,duration
IV. Meeting Conduct, Structure,Rules and Responsibilities—role of individuals and actions to
make group successful
V. Discussion of general agenda items for next meeting and future meetings
VI. Solid Waste/Transfer Station educational materials and assignments for next meeting
VIII. Adjourn—Next meeting will be February_,2009
`4 las.
12
Community Advisory Group
ATTACHMENT NO. 3
COMMUNITY ADVISORY GROUP
STRUCTURE
County Manager
Office
Orange County Transfer Station
COMMUNITY ADVISORY GROUP
Chairman
Orange County —, 1. Group Member Community Organizations
Solid Waste 4— 2. Group Member _÷p Local Citizens
3. Group Member 4— Neighbors
4. Group Member
5. Group Member
6. Group Member
Technical Facilitation 7. Group Member
u r r
Olver Incorporated 1— ,,
13
Community Advisory Group
ATTACHMENT NO. 4
Orange County Community Advisory Group
{Meeting Location)
{Town),North Carolina
Thursday,February 12,2009
7:00-8:30 p.m.
AGENDA
Meeting #1
*** EXAMPLE ONLY *
I. Introductions
II. Orange County Solid Waste Issues Regarding the Transfer Station—Gayle Wilson
III. Transfer Station Facility Progress Status Report-Louis Watts
IV. Report on neighborhood issues pertinent to the Transfer Station
IV. Functional and esthetic features of the Transfer Station entrance ways
V. Current status of rules and regulations governing transfer stations in North Carolina
VI. Discussion of general agenda items for next meeting and future facility tour
VIII. Adjourn—Next meeting will be February_,2009
e„...;77",
k .d
14
41) Memorandum
I"/�'a' Coresrztlirto Engineers aril�plrliEd ,Scientis#s
aMER
TO Gayle Wilson DATE: January 8,2009
FROM: Bob Sanach oivER PROJECT NUMBER: 24151
RE. Orange County Transfer Station
Orange County,North Carolina
The following elements wilt be prepared in the development of additional information to be considered by
the B0CC in the selection of a transfer station site:
• Environmental Assessment;
• Surface Water Assessment(County to conduct);
■ Archeological and Cultural Review;
• Flora and Fauna Review;
■ Boundary Survey(County to conduct);
• Appraisal(County to conduct);and
• Negotiation of Purchase Price(County to conduct).
The above information will be prepared for both sites that are being considered(i.e.,Site 056(West 54 LLC)
and Site 759(OWASA).
The Environmental Assessment(EA)will be prepared in accordance with State Environmental Protection
Act(SEPA)and County requirements(Chapter 40—Code of Ordinances)and will include proposed project
description;purpose and need for proposed project,alternative analysis;existing environmental
characteristics of project area; predicted environmental effects of project;mitigative measures references,
exhibits;and state and federal permitting requirements.
The Environmental Assessment(s)will be completed and submitted to the County and State
Intergovernmental Review Clearinghouse for review An Archeological and Cultural assessment along with
a review of site flora and fauna will be conducted to confirm existing site data.
Following completion of the EA review process by the County and State Intergovernmental Review
Clearinghouse,these documents and review comments will be provided to the BOCC for consideration in the
selection of a site for the transfer station Refer to Attachment 1 for a graphic presentation of the site
evaluation process,which includes appraisal and negotiation of a purchase price.
Projeel$Orange CowryJe1s1 4 f es'takt;rtttltFCT.. 0148•Meftwoarkipm at* b
lit.u.kthore„VA hadat:e, C t.tttu r ,t- C'*rt.NC'.
&Ma, dais amt ibs Cardin*farms 30 Tema
8720 Red Otk Bouienrd,Suite 505 room(704)5274227
C wubtte,NC 21217 Fee iww .elvercos
YES/NO
ATTACHMENT 1
EIS
01130/09 03/30109
Environmental
County/State FONSI
Assessment. 1 Clearinghouse Ofr
(Site 056) Review
Surface Water
Assessment Flora uttural Assessment.
Ftor &Fauna Review
YES/NQ
EIS
01/30/09 / 03130/09
Environmental / County/State I FONSI `
Assessment r #Clearinghouse
(Site 759) Review.
tor
t 04/07/19
nt
BOCC Concep#Rlan
Decision ` Development
03/16/09
(SitAppraisal+ / 0 Negotiation 0
Bounrvd
Survey Ai.
°—. 03116/09
Site Appraisal / $
(Site 759) # Negotiation 0
Boundary Site Evaluation Process
Survey 01/08/2009 ...,
cri
16
4,0
,:41, Tom,
fleVb
OLVER Consttifing engineers and tAppiied Scientists
INCORPORATED
April 5,2006
Mr.Gayle Wilson
Solid Waste Director
Orange County
P.O.Box 17177
Chapel Hill,NC 27516-7177
Re: Out-of-County Private Landfills
Orange County,North Carolina.
Olver Project Number 20151
Dear Gayle:
As you requested,we have prepared the following summary of private landfills that may be considered
as disposal options by the County once the proposed transfer station is constructed. These facilities fall.
within 150 miles of Orange County. The general location of each facility is also shown on the attached
Figure I. We have excluded those of greater distance due to the cost associated with hauling the waste.
Allied Waste Industries,Inc.
Brunswick Waste Management Landfill—Lawrenceville,VA
Charlotte Motor Speedway Landfill—Concord,NC
Anson County Landfill—Polkton,NC
Republic Services,Inc.
Upper Piedmont Environmental Landfill—Rougemont,NC
Foothills Environmental Landfill Lenoir,NC
East Carolina Environmental Landfill—Aulander,NC
Uwharrie Environmental.Landfill—Troy,NC
Waste Management,Inc.
Amelia Landfill—Jetersville:VA
Atlantic Waste Disposal—Waverly,VA
Waste Industries USA,Inc.
Sampson County Disposal,Inc.—Roseboro,NC
.ktPittjects'Oronge Co Couniy120151DOCS 04.05-ELC-Get*Wilsonda
Blacksburg,VA Charlotte,NC Richmond,VA Cary,NC
Serving Virfinitiing Am Geoti4s for wet 30 Ian
8720 Red Oak Boulevard,Sake 505 r (700517-3227
Charlotte,NC 28217 l (704)527-32
Rims enceea
17
Mr.Gayle Wilson
April 5,2006
Page 2
We have not assessed the interest of the companies or available long-term capacities of these facilities.
if you would like additional information or have any questions,please do not hesitate to call me.
Sincerely,
OL '• INCORPORATED
Ed Sheller,PE
Project Manager
ELSldet
Attachment
.....,,,,i. .
:tamwi Ak,
411.141)WASTF.
•
*REPUBLIC ,,,,,,,,• ,., , • •...,',ir
.81PRVICES,INg
,I, . 1:044'
*
. .
*L..stivr.
•
MAO
,i'',;;:i'iryti:
t:;.;yi-Al.:',
.,.....,. .
. Mitaillit . : . ' ..'.1.-• •-.
*-11'''''="•'' 1....:....:,4.4 .41'
114W: .
. . . •
001110
, . ... . i
14000p . . !..:). ...,,,.. , . •.,74:111;,,,,.. .
.. "..›. -4,
,111140.14-t
/
.
.,,,,,,. lg.
. - . ,,, .. , , . • 1whomi
041
iv
j
Me. 2.,
. ,., 7 j ilialittlf1111011, ... . . . -1..i.Z.:. .:,.,11';',.,.-,.:;._, Atlantic, ■vastc Disposal
. ,- - runswick Waste Management Landfill
. ... ..
. . •":'•• Lavdencev'lle
" ' • AbiliAii.
'2:-.. "farlAlliat.' '-"' • ., ' .: ''''',:'!'"aa'=". 7,,1: t., -4, f"; •'''" :-,:-.,01r., ; i
• 7 . l; .t.:,,,11 i• •.-miir .;-':
• ONIV SOW' .-' : " '
40444,1540,10*::::',.::::;`,.,.::;-:!.:',..,,.!.:„-,...;;p.•:,11.'' !......r.. ...‘...
pot
Llp1;c7r P"r'—df1-171"t Ell',111';g1t11‘2.11tai
tJott, CainlinLi _:.4:111*- ilk ,.
Foothills Environmental Landfil . . .. . * - etil ' -mr. 19111111111Firr •- .
lin
• ,;, ,..- . ..AP, , ttak.,,,..,-- .....,;:i, , .
No Lenoir, North Carolina
airroonkm:Thental Landfill t.
...0,-„y..... * -Tri--„4 il'' '' .iii613114i...:-., -...:,...:;,: '' ;.'-.1*: .1.,.'.,'' AE8usiatricdaerr14no3rrhncv
Ito,
. .
. . .
, ,,,,.,,.. ...i.,,,..,!......,„ .,,..,...
,...‘.!,;,;,.. ,.......:.--- ir.,,. .. -......".., .... -._''.--.L.-..-..,--Tv ,,,,,.::.,ityprTilitr-7...„, ,-,, • .-,t,',1 , :,.:. iiitt ,
.. .
... .. - •
, . . . .......‘„_. , .int • '•
, i,.. -. • ;, .,... 4itiiiritommillil • -- - - ', Uwilarrii, Envitonmental Landfill iiiiz' „., .! 4...- .:,... ., . . . .
Charlotte Motor Speedway Landfill -*: 1.*
MN'
• ' . . LI Concord, North Carolina .,r ,*•
. * Troy, North Carolina,
ri77'. 74001141W . . :4,410,0iI... . ... ,...,.
,....,..A.'* ,„„,,,,-..... ..,:',4004. Ate.,,...Vii' , ,- • . .. '
At#16.4.2L
• • * 114 t.411011Wai. . -. .T', .'''' , a m p s o n County Disposal, Inc. i.*:.:'. .
Anson County Landfill •. • 'illiml • •, .', Roseboro, NC 28382 ' -
Polkton, North Carolina - Airt'',A• • ..,
NOON....10001- '. ,• >.•
--:-: • ..: MID% -,'. „,"
. ..,
. .. . . ..
. . •
Figure 1
co
,.. .
_ .. ...... ..........