• MEETING DATE: March 15, 1988 NUMBER: P:0330
EFFECTIVE DATE: March 15, 1988 REVISIONS:
POLICY:
SEPTIC TANK NITRIFICATION FIELDS--DELINEATION ON
PRELIMINARY/FINAL SUBDIVISION PLATS
To consider the policy question regarding the delineation of
primary and back-up nitrification fields on preliminary and
final subdivision plats.
That at a recent agenda review meeting, two subdivisions,
Albert Reaves Estates and James Mark Vine, were withheld from
the Commissioners consideration, pending the collection of
information regarding the delineation of primary and back-up
nitrification fields on subdivision plats. The issue emerged
from a recommendation by OWASA that the fields be denoted on
such plats.
That a decision to require such notations on subdivision
plats is a question of policy. Preliminary information
obtained from Environmental Health personnel indicated that
it is possible to denote primary and back-up nitrification
fields on preliminary and final subdivision plats but at a
greater cost to both the applicant and the Health Department.
RECOMMENDATIONS:
The Administration recommends further assessment of the costs
involved in a policy which requires delineation of primary
and back-up nitrification fields on subdivision plats.
Until further assessment of the costs required for such a
policy is determined, the Administration recommends that
delineation of primary and back-up nitrification fields on
subdivision plats, preliminary and final, not be required.
•
fi ~ ~.,' 1
~PR0~7ED APRIL 19. 1988
MINI)TES
ORANGE COUNTY BOARD OF COMMISSIONERS
REGULAR MEETING
MARCH 15, 1988
The orange County Board of Commissioners set in regular session on March
15, 1988 at 7:30 p.m. iri the courtroom of the old Post Offices in Chapel
Hill, North Carolina.
BO MEPiB PREBENT~ Chair Shirley 8. Marshall, and Commissioners
Moses Carey, Jr., Stephen Halkiotis, John Hartwell and Dan Willhoit.
~`0 ATTORNEY PREB~ GsofPsey Gledhill.
3TAF,~' PRESENT: County Manager John M. Link, Jr., Assistant county
Managers William T. Laws and Albert Kittrall, Recreation and Parka Director
Mary Anne Black, Clerk to the Board Beverly A. Blythe, Deputy Finance
Director Ken Chavious, Planning Director Marvin Collins, Tax Assessor Kermit
Lloyd, Aging Director Jerry Passmore, Health Director Dan Reimer and
Recreation and Parks District Supervisor Wilma Tinney.
A.
Commissioner Carey indicated the Board has bean getting a lot of
feedback on the gresnway aspect of the Recreation and Parks Plan. xa is
aware that the matter is now before the Planning Board and normally would
like to wait until that Board wakes a recosmendation to the Board of
Commissioners on an issue of this importance but the feedback indicates that
the public is sufficiently enough confused and concerned about the public
access greenways that are proposed that that aspect of the Plan is obscuring
the entire Recreation and Parks Plan. He feels it important that the Board
of Commissioners give the Planning Board some direction on the
considerations they are likely to make at their next meeting. He proposed
that the Board add a discussion on the gresnways to the agenda and consider
deleting that portion from the Plan until all the questions can be answered
adequately. That aspect of the plan is going to overshadow the entire Plan
and cause some of the worthwhile elements to be scuttled because of their
association with the greenways. The Board agreed to add to the agenda as G-
7 a discussion on the proposed public access graenways.
Manager Link made a correction on itea F1 - Budget Amendments which is
reflected in the approval of that item.
The recommendation for item F2 was omitted from the abstract and should
indicate that the manager does recommend approval for the final RSVP
application.
Link announced that a public hearing will be held on Wednesday, March 30
at 7:30 p.m. in Superior Courtroom in the Orange County Courthouse on the.
Durham/Chapel Hill/Carrboro Thoroughfare Plan.
B. PTIBLIC COMMEI3T&
1. Matters on the Printed Agenda
None
2. Matters not on the Printed Agenda
None
c.
NONE
~LTBLIC CHARGE
Chair Shirley E. Marshall read the public charge.
... ... 6
encountered with the project and the design that causes the bid to be higher
than expected.
Motion was made by commission®r ililihoit, aeaonded by Commissioner
Hartwell to approve the request for $485,383 which will come from the funds
in the Long Range Plan for fiscal year 1988-89 as described above by John
Link. '
VOTE: UNANIM U$.
~~~~-a~~
2. Saptia Tanks Nitrification Ffeld-- Delineation on Preliminary/Final
Subdivision Plats
Motion was made by Commissioner Willhoit, seconded by Commissioner
Carey that further assessment of the costs involved in a policy which
requires delineation o! primary and back-up nitrification fields on
subdivision plats be undertaken and that until further assessment of the
costs required for such a policy is determined, the administration
recommends that delineation of primary and back-up nitrification fields on
subdivision plats not be required.
voTE: UNANIMOUS.
3. 3a~s Kark vine subdivision--Preliminary Plan
Planning Director 1+tarvin Collins presented far consideration of
approval the preliminary plan for the subdivision of the James Mark Vine
property. The property is located in Chapel Hill Township on the south side
of Cheyenne Drive west of NC Highway 86. The tract is part of Acres of New
Hops subdivision. It fs zoned Rural Suffer/Major Transportation Corridor
and designated as Rural Residential on the Joint Planning Area Land Use
Plan. Two lots are proposed out of 4.40 acres. The Planning Board and the
Administration recommends approval with two conditions.
A brie! discussion ensued on the equity issue of private versus
public roads and what the designation of a public road which has not been
accepted by anyone for maintenance really means.
Motion was made by Commissioner Halkiotis, seconded by Comimf.ssioner
Carey to approve the James Mark vine subdivision with two oonditions:
(1) submit payment-in-lieu of dedication of recreation/open space
iri the amount of $447.
(~) Upgrade Cheyenne Drive to neat NCDOT specifications for unpaved
roads and petition the state for acceptance of Cheyenne Drive
rota its maintenance system.
VOTES UNANIMOUS.
4. Albert Reaves estate--Preliminary Plan
Marvin Collins presented for consideration of approval the pre-
liminary Plan for the Albert Reaves Estate Subdivision. The property is
located in Chapel Hill Township on Neville Road (SR 1945). Eight lots are
proposed out of.31.86 acres. The property is zoned Rural Buffer with a
Protected latershed (PW-II) overlay. It is located in the University Laks
Watershed and is designated Rural Residential and Resource Conservation in
the Joint Planning Area Land Use Plan. The Planning Board and the Adminis-
tration recommends approval with two conditions.
Motion was made by Commissioner Hartwell, s®conded by Commissioner
Halkiotis to approve the Albert Reaves Estate Preliminary Plan with two
conditions:
(1) submission of payment-in-lieu of dedication of recreation/open
space in the amount of $759.00 prior to final plat approval.
(2) Indicate on the preliminary plan primary and secondary tree
protection zones for existing vegetation.
VOTE: UNANIMOUS.
5. Wildwood Subdivision--~Buildi~ Permit Moratorium
050
ORANGE COUNTY
BOARD OF COMMISSIONERS
Action Ag a
Item No . 1~
ACTION AGENDA ITEM ABSTRACT
Meeting Date: MARCH 15, 1988
SUBJECT: SEPTIC TANK NITRIFICATION FIELDS--DELINEATION ON PRELIMINARY/
FINAL SUBDIVISION PLATS
DEPARTMENT: PLANNING PUBLIC HEARING: Yes X No
ATTACHMENT(S): INFORMATION CONTACT:
MARVIN COLLINS, X346
PLANNING DIRECTOR 3-8-88 MEMO
TELEPHONE NUMBER:
Hillsborough - 732-8181
Chapel Hill - 968-4501
Mebane - 227-2031
Durham - 688-7331
PURPOSE: Consideration of policy question regarding the delineation of
primary and back-up nitrification fields on preliminary and
final subdivision plats.
.BACKGROUND: At a recent agenda review meeting, two subdivisions, Albert
S Reaves Estates and James Mark Vine, were withheld from the
Commissioners consideration, pending the collection of infor-
mation regarding the. delineation of primary and back-up nitri-
fication fields on subdivision plats. The issue emerged from
a recommendation by OWASA that the fields be denoted on such
plats.
A decision to require such notations on subdivision plats is a
question of policy. Preliminary information obtained from
Environmental Health personnel indicates that it is possible
to denote primary and back-up nitrification fields on prelimi•~
nary and final subdivision plats but at a greater cost to bo~t.h
the applicant and the Health Department. (See attached memo-
randum.)
RECOMMENDATION(S):
The Administration recommends further assessment of the costs
involved in a policy which requires delineation of primary and
back-up nitrification fields on subdivision plats.
Until further assessment of the costs required for such a
policy is determined, the administration recommends that
delineation of primary and back-up nitrification fields on
subdivision plats not be required.
~ 51 ORANGE COUNTY PLANNING DEPARTMENT
306F REVERE ROAD
• HILLSBOROUGH, NORTH CAROLINA 27278
~,. ., o
c`
°'~e e.v.o°•
O R A N G E C O U N T Y
INTEROFFICE MEMORANDUM
8803-1802
T0: John Link., County Manager
FROM: Marvin E. Collins, Planning Director
SUBJECT: Primary/Back-Up Nitrification Fields
DATE: March 2, 1988
(Revised March 8- 1988)
COPIES: Geoffrey Gledhill, County Attorney
Albert Rittrell, Assistant County Manager
Dan Reimer, Health Director
C. A. Laws, Environmental Health Supervisor
Emily Crudup. Planner II
• Ron Holdway, Environmental Sanitarian
Barry Jacobs, Planning Board .Chair
MAR 9 1988
At the last Agenda Review meeting. questions arose
regarding. the ability of Environmental Health personnel to
denote .primary and back-up nitrification fields on
subdivision plats. The issue emerged from a recommendation by
OWASA that the fields be denoted on such plats. Two
subdivisions, Albert Reaves Estates and James Mark Vine, were
withheld from the Commissioners consideration pending the
collection of information related to the issue.
Preliminary information has been obtained and is
provided below.
With regard to preliminary plat approvals, Environmental
Health requires that road centerlines and property corners be
staked in the field as a minimum. Another method used by
surveyors is to lay off a one-acre grid system on the
property. The approximate suitable area required for primary
• and back- up fields is then identified, by "pacing" from
centerlines or property corners, for each proposed lot.
Specific designations for each type of field are not denoted,
however, since the location of the house is not known. and
fields may have to be shifted accordingly. The preliminary